100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

GFEBS Project Systems Course NEWEST 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Beoordeling
-
Verkocht
-
Pagina's
15
Cijfer
A+
Geüpload op
29-10-2025
Geschreven in
2025/2026

GFEBS Project Systems Course NEWEST 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Instelling
GFEBS
Vak
GFEBS









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
GFEBS
Vak
GFEBS

Documentinformatie

Geüpload op
29 oktober 2025
Aantal pagina's
15
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

GFEBS Project Systems Course

A true project systems supports which of the following? - ANS-Cost Reporting
Funding / Funded Program Design
Execution
All of the above

Account Assignment Element - ANS-WBS's that could have actual prices collected
(performed) in opposition to them should be marked by using checking the Account
Assignment Element Operative Indicator.

Availability Control - ANS-During Availability Control, the corresponding assigned finances
are calculated and checked in opposition to the finances using Funds Availability Control.

Before a WBS can be accomplished in opposition to, dedication objects are created and
actual costs are incurred.

If certain tolerance thresholds are breached (finances surpassed), this may cause a hard
forestall within the GFEBS gadget.

A tough prevent within the GFEBS gadget is a manner that prevents all movement on an
object until the problem causing the hard prevent has been resolved. Because GFEBS is an
incorporated, actual time system, it could check fund availability and reserves budget so they
are no longer to be had for other projects.

NOTE: For a discussion for COED (Commitments, Obligations, Expenses and
Disbursements), refer to Funds Management training publications, aids, and Online Help
Procedures (OLHPs).

BI (Business Intelligence) - ANS-BI (Business Intelligence): the statistics warehousing factor
of GFEBS) BI is not actual-time, however is up to date numerous times a day

Example roles / reports are:
Command Budget Reporter
Costs Management Reporter
BI Advanced Expert

Billing Element - ANS-WBS's that may be referenced on a Sales order for a reimbursable
must be marked with the aid of checking the Billing Element Operative Indicator.

Cost Planning (1 of 3) - ANS-Cost Planning is used to plot expenses at the WBS level (even
though the fee may be viewed at an normal venture degree by using the rollup of charges
from bottom-up making plans).

, There are a couple of approaches to behavior fee making plans. This making plans data is
leveraged within GFEBS to help within the finances formula method and to compare cost
estimates to actuals. The making plans capability within Project Systems lets in GFEBS
users to plot overall, present day 12 months, or out to as a few years out as required.

Cost Planning (2 of 3) - ANS-In GFEBS, Cost Planning is commonly performed in one of two
ways:

Structure Planning
Using transaction CJ40 - this allows you to install plan values (usual, annual, or both) in any
WBS which has it Planning Element Operative Indicator set.
The fee version in GFEBS for Structure Planning is precisely bottom-up. All fees entered at a
decrease stage aggregate to the tiers above them. For this cause, an awesome exercise is
to most effective enter plan values at the lowest (execution) degrees. Values entered at
higher tiers can be overwritten by the aggregated values of the tiers under it if they exist.

Easy Cost Planning (ECP)
This lets in you to without problems input values for price at a WBS degree broken out into
Object Class Categories, which includes Labor, Travel, and so forth. ECP additionally allows
multi-12 months making plans. ECP is available from inside the Project Builder.

Cost Planning (3 of 3) - ANS-Structure Planning and ECP aren't mutually different. Both
could be completed on the same mission. You should, as an example, use Structure
planning for a rough estimate early inside the mission lifecycle and use ECP later while more
subtle, labeled fee estimates are to be had.

Both Structure and ECP Planning aid variations, starting with a default model number zero.

Finally, order price planning may be achieved for renovation orders.

It is essential to observe that deliberate expenses do no longer act as constraints or difficult
stops for execution of real costs. Rather they're used for functions of budget components
and forecasting, in addition to to run certain kinds of reviews (Planned vs. Actuals and so
forth)

Date Planning - ANS-The Project Scheduling Tool permits GFEBS to agenda a venture
timeline, both at the Project Definition or WBS Element level, to plan the appropriate project
timeframe.

WBS Element Scheduling traits encompass:

Basic start and end dates can be planned for the
WBS factors.
The dates may be extrapolated from lower to better-degree WBS elements, or handed on
from better to decrease-stage WBS factors.
The consistency of scheduling data may be established from in the WBS shape to avoid
project delays.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Rosedocs Chamberlain College Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
126
Lid sinds
1 jaar
Aantal volgers
17
Documenten
2507
Laatst verkocht
1 dag geleden

Welcome to Rosedocs ! The place to find the best study materials for various subjects. You can be assured that you will receive only the best which will help you to ace your exams. All the materials posted are A+ Graded. Please rate and write a review after using my materials. Your reviews will motivate me to add more materials. Thank you very much!

3,9

32 beoordelingen

5
17
4
5
3
5
2
0
1
5

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen