My lecture notes cover the entire class of PV and WPS and project management. This course was held by a professor with several years of practical experience in wind power plants in Japan.

Instelling
Vak










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Gekoppeld boek

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Geüpload op
10 januari 2021
Aantal pagina's
16
Geschreven in
2019/2020
Type
College aantekeningen
Docent(en)
Onbekend
Bevat
Alle colleges

Onderwerpen

Voorbeeld van de inhoud

Summary PV + Wind Summer semester 2020


Photovoltaic and Wind Power Plant

Exam Summary SS2020

Table of Contents
New Project Implementation: ................................................................................................................. 2
Developer Flow: most important for planning.................................................................................... 2
Step 1-4 (Predominantly for PV) ......................................................................................................... 2
Differences to Wind projects: ............................................................................................................. 2
Most important parameter for project development......................................................................... 3
Technical Components: ........................................................................................................................... 3
PV - Solar Modules .............................................................................................................................. 3
Mounting system................................................................................................................................. 4
Shading condition PV........................................................................................................................... 5
Inverter ................................................................................................................................................ 5
Central Inverter vs String inverter ................................................................................................... 5
Power Optimiser (series connection) .............................................................................................. 5
Sensors of PV ....................................................................................................................................... 6
Solar PV Monitoring ................................................................................................................................ 7
What happened here – Practical examples for different scenarios .................................................... 7
Market situation .................................................................................................................................. 8
Wind energy production ..................................................................................................................... 8
Wind classes according to IEC 61400 .................................................................................................. 9
EPC – What to consider: ........................................................................................................................ 10
due diligence process: ....................................................................................................................... 10
Liquidated Damages .......................................................................................................................... 10
Essential Equations for calculation (with Examples) ............................................................................. 13
Specific Yield ...................................................................................................................................... 13
Capacity factor................................................................................................................................... 13
Performance Ratio............................................................................................................................. 13
Self-consumption rate ....................................................................................................................... 13
Self-production rate .......................................................................................................................... 13
Expected energy of power plant ....................................................................................................... 13
PR check with EPC ............................................................................................................................. 13
Inverter size: ...................................................................................................................................... 14
Reflection questions .............................................................................................................................. 15
Additional questions: ............................................................................................................................ 16


1

,Summary PV + Wind Summer semester 2020




New Project Implementation:
Developer Flow: most important for planning




Steps from Greenfield to plant

1. Site identification: identify potential spots, money for project, rough concept of design
2. Pre-feasibility: evaluate technical options, estimate costs, assess market and permits needed
3. Feasibility: technical and financial check of chosen option, start permission process
4. Financing / Contracts: permits, contracts, select supplier, finance project
5. Detailed Design: detailed design, project schedule, finalise permissions
6. Construction: build and supervise
7. Commission: test and check

Step 1-4 (Predominantly for PV)
 Power Purchasing Agreement needed!! basis to go to bank and get funding (PPA)
 no PPA-> no loan granted -> no project = not good!!
 site inspection = feasibility with respect to technical and financial issues = check with solar-
atlas data
 make sure to get all permissions of land, secure land even under transmission lines,
(connection to substations required)
 distinguish between roof and land PV
 use phases to monitor project (milestone / gate model) – be able to continue or stop project
depending on the fulfilment of the milestones (sometimes just not worth continuing work)

Differences to Wind projects:
 EISA / EIA takes up to 2-3 years and adds extra layers of costs
 additional data collection through mat masts (in case of new wind parks)
 >1-year simulation needed to evaluate spatial energy potential, displayed in bins over
frequency (bell curve)
 Several sensors at different heights = wind speed + wind direction
 High variation throughout the year
 Wind shear + surface roughness (coefficient)



2

, Summary PV + Wind Summer semester 2020


Green Field to wind farm development




Most important parameter for project development
 Annual Energy Production (AEP) = how much energy as quantity
 Power Purchasing Agreement (PPA) = how do we get paid for how long (price, duration)
important for banks = CENTRAL DOCUMENT TO START THE PROJECT
 CAPEX = How much does it cost to install it, capital expenditures
 OPEX= how much does it cost to run it, operational expenditures

Technical Components:

PV - Solar Modules

Module technology shifts towards n-type (PERC) modules




3
€5,39
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
MrMaslow

Maak kennis met de verkoper

Seller avatar
MrMaslow Brandenburgische Technische Universität Cottbus-Senftenberg
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1
Lid sinds
6 jaar
Aantal volgers
1
Documenten
0
Laatst verkocht
4 jaar geleden

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen