Boom Angle Calibration [ Ans: ] Calibrating using a protractor
measuring 90 degrees from the crane deck.
Outrigger Setup [ Ans: ] Crane tires on the ground firmly to
support weight.
© 2025 Assignment Expert
Hoisting Wind Speed [ Ans: ] Max 20 mph; competent person
assesses safety to continue.
LMI System Disablement [ Ans: ] Only during assembly,
Guru01 - Stuvia
disassembly, and load testing.
Two Audible Signals [ Ans: ] Operator intends to stop.
Dynamic Action Swinging Crane [ Ans: ] Radius decreases, load
weight increases.
Leaving Cab Safety [ Ans: ] Operator restricts access, keeps
crane in view.
Broken Wires Removal [ Ans: ] 2 broken wires in 6 rope diameters.
Stowing Load Position [ Ans: ] Where chart provides best stability
configuration.
Choker Hitch Capacity [ Ans: ] Rated at 50% of vertical hitch
capacity.
Signal Person Assignment [ Ans: ] Responsibility lies with the lift
director.
Picking Points Location [ Ans: ] Above the center of gravity when
attaching slings.
Slinging Pipe Bundle [ Ans: ] Double basket provides best
contact.
, 2
For Expert help and assignment solutions, +254707240657
Two Blocking Definition [ Ans: ] When hook block reeved with
more than 2 parts of line.
Personnel Platform Safety Devices [ Ans: ] Anti-two block
warning device and boom length indicator.
Load Indicator Measurement [ Ans: ] ASME: Actual load, radius,
boom tip height.
Right Lever Function [ Ans: ] Controls boom movement.
Wire Rope Lay Length [ Ans: ] Distance of 6 rope diameters.
Rotation Resistant Rope Broken Wires [ Ans: ] 3 broken wires in 30
rope diameters.
© 2025 Assignment Expert
Multi-Part Reeving Usage [ Ans: ] Utilized when line pull exceeds
load.
Competent Person Definition [ Ans: ] Identifies hazards, can take
corrective measures.
Guru01 - Stuvia
Outrigger Placement Near Wall [ Ans: ] At least half the depth of
cellar wall below ground.
Boom Angle Measurement [ Ans: ] Parallel line to the boom.
Severe Duty Cycle Operations [ Ans: ] Pile driving is most severe.
Non-Standard Hand Signals Use [ Ans: ] When agreed upon by
lift director, operator, and signal person.
Boom Swing on Uneven Ground [ Ans: ] Boom angle will increase
when swinging to low side.
Line Pull with Drum Layers Increase [ Ans: ] Line pull increases.
Shackle Placement Procedure [ Ans: ] Shackle pin placed in
hook.
Power Line Clearance Requirement [ Ans: ] 25 ft clearance for
34kV power line.
Rough Terrain Crane Boom Direction [ Ans: ] Facing over the side
when picking and carrying load.
Uneven Boom Section Extension Impact [ Ans: ] Shorter sections
could be overloaded.
For Expert help and assignment solutions, +254707240657
Crane Safety Guidelines Questions and
Answers (100% Correct Answers) Already
Graded A+
Boom Angle Calibration [ Ans: ] Calibrating using a protractor
measuring 90 degrees from the crane deck.
Outrigger Setup [ Ans: ] Crane tires on the ground firmly to
support weight.
© 2025 Assignment Expert
Hoisting Wind Speed [ Ans: ] Max 20 mph; competent person
assesses safety to continue.
LMI System Disablement [ Ans: ] Only during assembly,
Guru01 - Stuvia
disassembly, and load testing.
Two Audible Signals [ Ans: ] Operator intends to stop.
Dynamic Action Swinging Crane [ Ans: ] Radius decreases, load
weight increases.
Leaving Cab Safety [ Ans: ] Operator restricts access, keeps
crane in view.
Broken Wires Removal [ Ans: ] 2 broken wires in 6 rope diameters.
Stowing Load Position [ Ans: ] Where chart provides best stability
configuration.
Choker Hitch Capacity [ Ans: ] Rated at 50% of vertical hitch
capacity.
Signal Person Assignment [ Ans: ] Responsibility lies with the lift
director.
Picking Points Location [ Ans: ] Above the center of gravity when
attaching slings.
Slinging Pipe Bundle [ Ans: ] Double basket provides best
contact.
, 2
For Expert help and assignment solutions, +254707240657
Two Blocking Definition [ Ans: ] When hook block reeved with
more than 2 parts of line.
Personnel Platform Safety Devices [ Ans: ] Anti-two block
warning device and boom length indicator.
Load Indicator Measurement [ Ans: ] ASME: Actual load, radius,
boom tip height.
Right Lever Function [ Ans: ] Controls boom movement.
Wire Rope Lay Length [ Ans: ] Distance of 6 rope diameters.
Rotation Resistant Rope Broken Wires [ Ans: ] 3 broken wires in 30
rope diameters.
© 2025 Assignment Expert
Multi-Part Reeving Usage [ Ans: ] Utilized when line pull exceeds
load.
Competent Person Definition [ Ans: ] Identifies hazards, can take
corrective measures.
Guru01 - Stuvia
Outrigger Placement Near Wall [ Ans: ] At least half the depth of
cellar wall below ground.
Boom Angle Measurement [ Ans: ] Parallel line to the boom.
Severe Duty Cycle Operations [ Ans: ] Pile driving is most severe.
Non-Standard Hand Signals Use [ Ans: ] When agreed upon by
lift director, operator, and signal person.
Boom Swing on Uneven Ground [ Ans: ] Boom angle will increase
when swinging to low side.
Line Pull with Drum Layers Increase [ Ans: ] Line pull increases.
Shackle Placement Procedure [ Ans: ] Shackle pin placed in
hook.
Power Line Clearance Requirement [ Ans: ] 25 ft clearance for
34kV power line.
Rough Terrain Crane Boom Direction [ Ans: ] Facing over the side
when picking and carrying load.
Uneven Boom Section Extension Impact [ Ans: ] Shorter sections
could be overloaded.