100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Test Bank For Electrical Wiring Commercial 18th Edition by Phil Simmons, Ray C. Mullin, Mark Ode Chapter 1-22

Beoordeling
-
Verkocht
-
Pagina's
132
Cijfer
A+
Geüpload op
12-10-2025
Geschreven in
2025/2026

Test Bank For Electrical Wiring Commercial 18th Edition by Phil Simmons, Ray C. Mullin, Mark Ode Chapter 1-22

Instelling
Solution Manual
Vak
Solution Manual

Voorbeeld van de inhoud

A+ Page 1
xq

, Solutions Manual for Electrical Wiring Commercial 18t xq xq xq xq xq xq




h Edition by Phil Simmons A+
xq xq xq xq xq




Solution and Answer Guide xq xq xq



SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115; C
X Q X Q X Q X Q X Q X Q XQ XQ



HAPTER 1:COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
X Q X Q XQ XQ XQ




TABLE OF CONTENTS X Q X Q




Review .......................................................................................................................................................... 1



Note to instructor: It is recommended that students be required to respond, where app
xq xq xq xq xq xq xq xq xq xq xq xq xq


ropriate, with answers that are complete sentences.
x q x q x q x q x q xq




REVIEW

Refer to the National Electrical Code or the working drawings when necessary. Where appl
xq xq xq xq xq xq xq xq xq xq xq xq xq




icable, responses should be written in complete sentences.
xq xq xq xq xq xq xq




1. What section of a commercial building’s specification contains a list of contra
xq xq xq xq xq xq xq xq xq xq xq




ct documents?
xq




Answer: A list of the contract documents is contained in General Clauses and Conditions. A
xq xq xq xq xq xq xq xq xq xq xq xq xq xq xq




listing of the Commercial Building contract documents is presented in this chapter under the
xq xq xq xq xq xq xq xq xq xq xq xq xq xq




heading “Commercial Building Plans.” The instructor may wish to have the students check ov
xq xq xq xq xq xq xq xq xq xq xq xq xq




er this listing and compare it with the plans provided.
xq xq xq xq xq xq xq xq xq




2. The requirement for temporary light and power at the job site will be found in w
xq xq xq xq xq xq xq xq xq xq xq xq xq xq xq




hat portion of a commercial building’s specification?
xq xq xq xq xq xq




Answer: The Supplementary General Conditions specifies the job site requirements for tempo
xq xq xq xq xq xq xq xq xq xq xq




rary light and power. In some contracts, this electrical system becomes the responsibility of t
xq xq xq xq xq xq xq xq xq xq xq xq xq xq




he general contractor; in other contracts, it is the electrical contractor’s responsibility to instal
xq xq xq xq xq xq xq xq xq xq xq xq xq




l and maintain the temporary electrical system. The instructor may wish to refer the student to
xq xq xq xq xq xq xq xq xq xq xq xq xq xq xq xq




NEC Article 590 and discuss the requirements in detail.
xq xq xq xq xq xq xq xq




A+ Page 2 xq

,3. The electrician uses the Schedule of Working Drawings for what purpose?
xq xq xq xq xq xq xq xq xq xq




Answer: The electrician uses the Schedule of Working Drawings to determine whether all of t
xq xq xq xq xq xq xq xq xq xq xq xq xq xq




he drawings are at hand. The information on “the other sheets” may be very important, especia
xq xq xq xq xq xq xq xq xq xq xq xq xq xq xq




lly in coordinating with other contractors.
xq xq xq xq xq




4. Complete the following items by indicating the letter(s) designating the correct source(
xq xq xq xq xq xq xq xq xq xq xq




s) of information:
xq xq




No. Answer Item Information

4. Sections Ceiling height xq Sections, Sheet A6 xq xq




5. Electrical symb xq Electrical receptacle sty Electrical symbol schedule, Chapter
xq xq xq xq xq xq




ol schedule
xq le 2,Figure 2–6 xq




6. Electrical x Electrical outlet locatio xq xq Electrical layout drawings, Sheets El,
xq xq xq xq




layout d
q xq n E2, and E3
xq xq




rawings

7. Elevations Exterior wall finishes xq xq Elevations, Sheets A4 and A5 xq xq xq xq




8. Site plan xq Grading elevations xq Site plan, Sheet A4
xq xq xq




9. Electrical x Panelboard schedules xq Electrical layout drawings, Sheet E4
xq xq xq xq




layout d
q xq




rawings

10. Architectural fl xq Room width xq Architectural floor plan, Sheets Al,xq xq xq xq xq




oor plan xq A2,and A3 xq




11. Architectural fl xq Swing of door xq xq Architectural floor plan, Sheets Al,xq xq xq xq xq




oor plan xq A2,and A3 xq




12. Sections View of interior wall
xq xq xq Sections, Sheet A6 xq xq




A+ Page 3 xq

, Match the items on the left with those on the right by writing the letter desi
xq xq xq xq xq xq xq xq xq xq xq xq xq xq x q




gnation ofthe appropriate organization from the list on the right.
xq xq xq xq xq xq xq xq xq




13. NEC Electrical Code xq National Electrical Code (NEC xq xq xq


)
14. IAEI Electrical inspectors xq
International Association of xq xq




xq ElectricalInspectors (IAEI xq




)


15. NFPA Fire codesxq National Fire Protection Association
xq xq xq x




q (NFPA)

16. IESNA Lighting information xq Illuminating Engineering xq




xq Society ofNorth Americ
xq xq




a (IESNA)
xq




17. UL Listing service xq Underwriters Laboratories, Inc. (U xq xq xq




L)

18. NEMA Manufacturers’ standar xq National Electrical Manufacturers
xq xq




ds Association (NEMA) xq




19. PE Seal Professional Engineer (PE) xq xq




Match the items on the left with those on the right by writing the lette
xq xq xq xq xq xq xq xq xq xq xq xq xq xq




r designation ofthe proper level of NEC interpretation from the list on
xq xq xq xq xq xq xq xq xq xq xq xq




the right.
xq




20. with speci xq Allowed by the Code xq xq xq Shall be permitted, or Shall not
xq xq xq xq xq x




al permissi
xq q berequired, NEC xq




on

21. with May be donexq xq Shall be permitted, or Shall n
xq xq xq xq xq




A+ Page 4 xq

Gekoppeld boek

Geschreven voor

Instelling
Solution Manual
Vak
Solution Manual

Documentinformatie

Geüpload op
12 oktober 2025
Aantal pagina's
132
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
APLUSLECTURER Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
103
Lid sinds
1 jaar
Aantal volgers
3
Documenten
509
Laatst verkocht
1 dag geleden
WELCOME TO A+ LECTURER STORE WHERE YOU ACQUIRE A+ graded study materials at best offer

Welcome to apluslecturer where you will get best testbanks, solutionmanuals and other study materials which will help you attain A+ in your studies ALL THE BEST.......

4,2

24 beoordelingen

5
16
4
1
3
4
2
1
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen