100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
College aantekeningen

project management PIM 5455 notes

Beoordeling
-
Verkocht
-
Pagina's
13
Geüpload op
09-10-2025
Geschreven in
2025/2026

Study guide of each week's topic

Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
9 oktober 2025
Aantal pagina's
13
Geschreven in
2025/2026
Type
College aantekeningen
Docent(en)
Dr. kimberly marie deranek
Bevat
Alle colleges

Onderwerpen

Voorbeeld van de inhoud

Monitoring and Controlling the Project

Project Planning and Selection
●​ Selection: Dictates what to monitor
●​ Planning: Identifies elements to control

M&C follow Selection and Planning
●​ Monitor: Collect, record & report project information
●​ Control: Use data to align project with the plan


→ Plan-Monitor-Control (PMC) Cycle

A “closed loop” process
-​ Continues until the project is completed

Complex Projects
●​ Temptation exists to minimize the PMC effort
●​ Urge to focus on the “real work”
●​ Complex projects need the PMC process the most




→ Monitoring System Design​ ​ ​ ​ ProjectManager.com
●​ Identify characteristics to control
-​ Scope, Cost, and Time
-​ Design mechanisms to collect the data
-​ Input/Analysis is used to transform data into information
●​ Use to measure progress against plan

, In order to sufficiently monitor and control the different elements of the project, you need to
identify upfront what data needs to be collected and reported upon…

→ Data Collection and Reporting​ ​ ​ ​ Questions to consider:
●​ How should the data be collected?
●​ Should special forms/templates be used?
●​ When should the data be collected?
●​ Should data be collected before/after milestones?
●​ Should time/cost be collected at the same time?
●​ What type of data should be collected? Time, cost, resource usage, etc.
●​ How should we track progress?



→ Routine Reporting

●​ Information dissemination
-​ Customize information for difference audiences
-​ Ensure timing allows for corrective action

●​ “Routine” performance reports
-​ Project status reports (since the last time)
-​ Time/Cost reports
-​ Variance reports

Reporting Benefits:
1.​ Ensures common understanding amongst stakeholders
2.​ Establish & maintain a communication network
3.​ Communicate changes to a project
4.​ Fosters transparency and visibility
5.​ Improves motivation

→ Exception Report

●​ Used for unexpected situations and decisions
●​ Typically, an “issue” that is out of tolerance
●​ Team members need to be made aware, and the change itself documented

→ Meetings

●​ Regular
●​ Highly formalized and structured sessions
●​ Informal/off-the-cuff gatherings
€7,00
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
megangray1

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
megangray1 Nova Southeastern University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
Nieuw op Stuvia
Lid sinds
2 maanden
Aantal volgers
0
Documenten
8
Laatst verkocht
-

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen