100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Samenvatting

Summary need help with solutions for Green Belt lean six sigma exam?check out here

Beoordeling
-
Verkocht
-
Pagina's
4
Geüpload op
27-09-2025
Geschreven in
2025/2026

Summary of 4 pages for the course BUSINESS at Saxion (The solutions)









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Documentinformatie

Geüpload op
27 september 2025
Aantal pagina's
4
Geschreven in
2025/2026
Type
Samenvatting

Voorbeeld van de inhoud

Chapter 6: Case Value Stream Mapping
1.What is the big advantage of value stream mapping?

B. It provides a visual overview of value and non-value-adding activates as well as
improvement projects (kaizen) in the bigger picture, so that sub-optimization are avoided as
much as possible.

2. What is WIP in the above VSM? So no stock of raw material and final stock!

The WIP is the total stock minus raw material and the ending stock (finished goods). You take
both the small and large.
= 1000+1250+1050+2300 = 5600 pieces
You do not include the cycle time in the shipping process in your analysis.

3. The company works in 1 shift.8 hours per day, including two 30-minute breaks. A working
consists of 5 working days. In the VSM you can see that an average of 3200 pieces are
delivered per week.
Calculate the task time??
Task time = Daily Availability/ Daily Demand
Daily availability = 7*60*60 = 25200 seconds per day
5 working days = 3200/5 = 640 pieces per day
Task time = Daily availability/ Daily demand
= 25200/640 = 39,375 seconds per piece

4.How many days of stock is there between “press” and “pierce &form”?
The pieces of press and piece and form = 1000+1250 = 2250 pieces
2250/640 = 3.5 days

5. What is the total lead time in days for the entire process (Excluding Staging)? Include the 5
days’ supply of “raw material” in your calculation?
5 days stock for Press (raw material)
2250 stock between Press and Pierce &Form corresponds to 2250/640 = 3.5 days
3350 stock between “Pierce & Form” and “Finish Grind” 3350/640 = 5.2 days
1475 stock between “Finish Grind” and “Shipping” corresponds to 1475/640 = 2.3 days
Total = 16 days

6. The LSS GB want to know how great the Flow Efficiency is in the process?
Calculate the value-added percentage of the processes within this VSM. Use a lead time of
16 days.
The total lead time = 16*420* 60 = 403200 seconds
The sum of the cycle time is 12+35+34= 81 seconds
The value-added percentage = cycle time/lead time = 403200/81 = 0,02 %

7. He now wonders whether the goods flow sufficiently because the capacities of the
stations are synchronised.
€3,99
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
trangphan

Maak kennis met de verkoper

Seller avatar
trangphan Saxion Hogeschool
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2
Lid sinds
2 jaar
Aantal volgers
0
Documenten
47
Laatst verkocht
5 maanden geleden

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen