WGU C722 TEST EXAM ACCURATE AND FREQUENTLY TESTED QUESTIONS AND 100% CORRECT ANSWERS|| LATEST AND COMPLETE UPDATE WITH EXPERT VERIFIED SOLUTIONS|| SURE PASS

Instelling
WGU C722
Vak
WGU C722











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
WGU C722
Vak
WGU C722

Documentinformatie

Geüpload op
21 september 2025
Aantal pagina's
41
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

1|Page


WGU C722 TEST EXAM ACCURATE AND
FREQUENTLY TESTED QUESTIONS AND 100%
CORRECT ANSWERS|| LATEST AND COMPLETE
UPDATE WITH EXPERT VERIFIED SOLUTIONS||
SURE PASS
Three essential drivers that must be achieved to generate positive characteristics in
project teams - ANSWER: Cohesiveness, Trust, Motivation


The five stages Dr. Bruce Tuckman (1965) introduced of group development -
ANSWER: Forming, Storming, Norming, Performing, Adjorning


Forming - ANSWER: In this stage, team members may be meeting for the first
time. Often, no one really knows much about anyone else on the team. It may be
premature to refer to this group of individuals as a team. It is a time of introduction
and forming relationships and understanding from exchange of information.


Storming - ANSWER: Team members are beginning to know about each other,
but they do not yet understand how to work together. Members may "jockey for
position" within the team. The dynamics of working together beyond any written
statement of "roles and responsibilities" are being established. Personalities
surface, showing the strengths, weaknesses, and personal needs of each individual
on the team. Integration into a team may come with some struggle and conflict.


Norming - ANSWER: Team members have "figured out" how they will interact
with each other. Working relationships are beginning to form. Trust and
understanding is beginning to form between team members. They are beginning to
feel comfortable working together and openly and willingly sharing information.

,2|Page


Performing - ANSWER: Team members are fully comfortable working together.
Trust has been developed. Working relationships have jelled. Work is being
conducted and project progress is occurring.


Adjourning - ANSWER: This only occurs when all the team's work has been
completed and the team is no longer required. This may occur at any time in the
project life cycle.


Co-located Teams - ANSWER: involves team members physically working at the
same location or holding project meetings together in a common setup.


Virtual Teams - ANSWER: are teams whose members interact primarily through
electronic communications. Members of a virtual team may be within the same
building or across continents.


Two common situations occur that may prompt a change to the baseline scope -
ANSWER: The scope may be expanded to include additional functionality or the
scope may be diminished due to changes in the project environment such as
reduced funding or requirements or changing time/due date.


Scope creep - ANSWER: occurs when the project team integrates enhancements
to the scope without proper evaluation and approval.


work performance data - ANSWER: will identify the work activities that are
completed, partially completed, or not started.


risk register - ANSWER: is a list of potential risks, how the risks will be
monitored, and what action will be taken should the risk event occur.

,3|Page


corrective action - ANSWER: is a document issued to identify quality failures and
how they will be corrected. The deliverable itself may need to be reworked and the
project plan may need to be revised to ensure that future deliverables do not
include the same error.


The Four Categories of Change - ANSWER: Contingency plans, improvement
changes, external events, scope change


The change management system - ANSWER: is in place to formally identify,
evaluate, decide, and communicate project changes.


Recording - ANSWER: is the process of documenting and archiving project-
related information.


Reporting - ANSWER: is a key nonverbal communications methodology used to
inform and to document project information.


Weekly status reports that are often working documents for the team to
communicate: - ANSWER: Accomplishments, Issues, Schedules, Resource
utilization


Monthly status reports for senior stakeholders that would include: - ANSWER:
Project overview bragging about progress, Issues including red light (critical)
problems needing immediate resolution, yellow light items that are warning flags,
and resolved issues, Current accomplishments, Future plans for the next month,
Resource utilization and plans


Monthly Financial Report - ANSWER: showing progress against the budget
quantifying monies spent and planned to be spent and identifying issues with
recommendations for resolution

, 4|Page




Change management reporting - ANSWER: showing changes identified, requiring
approval, and resolution.


Project controls - ANSWER: are the data gathering, management, and analytical
processes used to predict, understand, and constructively influence the time and
cost outcomes of a project or program.


Three Aspects of Project Quality - ANSWER: quality management, quality
assurance, and quality control.


Quality management - ANSWER: is the process of identifying the customer's
requirements and how they will be measured.


Quality assurance - ANSWER: is the process of validating that the requirements
and measurements are appropriate for the project environment.


Quality control - ANSWER: is the process of monitoring and changing project
execution to ensure that activities are being executed as planned and will result in
meeting the customer requirements. It is the monitoring and controlling process
that occurs during project execution.


Standards - ANSWER: are requirements that are generally accepted by a group of
firms that produce similar products or services.


Requirements - ANSWER: are what the customer needs to achieve from the
completed project.
€26,04
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
LINCOlNGUIDE Princeton University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
741
Lid sinds
1 jaar
Aantal volgers
23
Documenten
3504
Laatst verkocht
2 dagen geleden
YOUR TRUSTWORTHY SOURCE FOR HIGH-IMPACT STUDY MATERIALS, GOLD RATED TOP NOTCH SELLER REPETITIVELY KNOWN FOR OFFERING BEST STUDY MATERIALS.

Unlock your academic success with our comprehensive study documents (EXAMS, CASE STUDY, STUDY GUIDES, NOTES ETC.) Do you want better outcomes? Obtain well-prepared resources that are effective. Feeling overburdened by the pressure of exams? Our goal is to make things easier. With the aid of our study guides, you can maintain concentration, boost your self-esteem, and arrive to tests ready. Made from actual previous exams, they show you the kinds of questions you'll encounter and how to answer them effectively, allowing you to prepare more effectively and improve your marks. pick us because; we are Stuvia Gold-rated vendors by 950+ happy students; get Reliable resources for certification and healthcare achievement; Support that is responsive and kind when you need it.

Lees meer Lees minder
4,4

393 beoordelingen

5
248
4
81
3
50
2
9
1
5

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen