MGMT 404 Week 3 Quiz (Sep 2020)
1. Question: The overall project is considered to be the first level of the WBS. All of the following methods can be used to organize the second level of the WBS EXCEPT: 2. Question: If a problem occurs during project execution, the WBS is helpful in understanding exactly where and why the problem occurred. 3. Question: A _______ is the approved project plan mainly consisting of scope, schedule, and cost that is not normally altered unless a formal change control request is approved for modifying these plans. 4. Question: A WBS dictionary is a document that defines each of the terms used in the project scope statement. 5. Question: The project scope is the work that must be performed to deliver a product, service or result with the required features and functions. 6. Question: The Work Breakdown Structure (WBS) is a framework that will be used as a basis for further planning activities including all the following EXCEPT: 7. Question: A _________ is a written request or formal proposal to propose changes to any project planning component such as a document, project deliverable, or baseline (scope, cost, and time). 8. Question: Which of the information below would NOT typically be included in the WBS dictionary for a specific work package? 9. Question: All of the following elements should be included in a project scope statement EXCEPT: 10. Question: A "top-down" approach to creating a WBS is typically used when a project is unique and different from previous projects.
Geschreven voor
- Instelling
- Devry University
- Studie
- Devry University
- Vak
- MGMT 404 Project Management (MGMT404PROJECTMANAGEMENT)
Documentinformatie
- Geüpload op
- 19 december 2020
- Aantal pagina's
- 2
- Geschreven in
- 2020/2021
- Type
- Tentamen (uitwerkingen)
- Bevat
- Onbekend
Onderwerpen
-
mgmt 404
-
mgmt 404 week 3
-
mgmt 404 week 3 quiz
-
mgmt 404 project management
Ook beschikbaar in voordeelbundel