CM exam QUIZ well solved with definitive solutions. Qs Which of the following is not one of the 5 basic construction industry sectors? - n ANS Apartment Construction Qs Which construction sector deals with projects such as roads, bridges, and dams?

Beoordeling
-
Verkocht
-
Pagina's
19
Cijfer
A+
Geüpload op
19-09-2025
Geschreven in
2025/2026

CM exam QUIZ well solved with definitive solutions. Qs Which of the following is not one of the 5 basic construction industry sectors? - n ANS Apartment Construction Qs Which construction sector deals with projects such as roads, bridges, and dams? - n ANS Heavy Civil Construction Qs Which sector of the construction industry experiences the most cyclical fluctuations? - n ANS Residential Construction Qs Who are the primary players in a construction project? - n ANS Construction Professionals, Design Professionals, Owners Qs Which project player outlines the needs and requirements of the building, provides funding, and decides on the budget? - n ANS Owner

Meer zien Lees minder
Instelling
CM Em
Vak
CM em










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CM em
Vak
CM em

Documentinformatie

Geüpload op
19 september 2025
Aantal pagina's
19
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

CM exam QUIZ well solved with
definitive solutions.

Qs
Which of the following is not one of the 5 basic construction industry sectors? - n
ANS✔
Apartment Construction


Qs
Which construction sector deals with projects such as roads, bridges, and dams? - n
ANS✔
Heavy Civil Construction


Qs
Which sector of the construction industry experiences the most cyclical
fluctuations? - n
ANS✔
Residential Construction


Qs
Who are the primary players in a construction project? - n
ANS✔
Construction Professionals, Design Professionals, Owners


Qs
Which project player outlines the needs and requirements of the building, provides
funding, and decides on the budget? - n
ANS✔
Owner

,Qs
Which project player interprets the plans & specifications and prepares cost
estimates and time schedules? - n
ANS✔
General Contractor


Qs
Which process concerns itself with defining the owner's needs and determining the
scope of the project? - n
ANS✔
Construction?


Qs
Which of the following best describes a piece of land that contains an abandoned
factory which has contaminated the soil underneath? - n
ANS✔
Brownfield


Qs
Which of the following descriptions is most associated with the term LEED? - n
ANS✔
A system that evaluates the environmental performance of buildings


Qs
Which of the following terms is most associated with efficiency and creating more
value with less cost in construction projects? - n
ANS✔
Lean


Qs

, Which of the following best describes the Design-Build project delivery method? - n
ANS✔
Owner contracts with one entity, which is responsible for the project from
conceptualization through completion


Qs
What are the 3 main factors (aside from safety) that are of most importance to a
construction manager when managing a construction project? - n
ANS✔
Quality,cost,time


Qs
The primary means of defining and controlling the time it takes to complete a
construction project is the ___________? - n
ANS✔
schedule


Qs
Under Design-Bid-Build, if there are errors or omissions in the plans and specs who
is responsible for paying for the corrections? - n
ANS✔
Owner


Qs
What project professional is typically responsible for estimating, contract
administration, construction operations, planning and scheduling, monitoring quality
and safety, and monitoring risk? - n
ANS✔
Construction Manager


Qs
In which type of project can the owner solicit bids from whomever they want? - n

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
DoctorMark Chaminade University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
12
Lid sinds
3 jaar
Aantal volgers
12
Documenten
1394
Laatst verkocht
1 jaar geleden

5,0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen