Save
Terms in this set (100)
1. As part of the contract Specifications
documents, what are the
written documents called
that describe the required
materials, requirements for
the execution of the work,
and workmanship
expected?
2. Title blocks on False
construction-drawing
sheets are generally
placed along the left side
of the sheet for ease of
reading left to right.
3. In construction readability
drawings, the most
important aspect of
lettering is its ______________.
4. The use of modular 48-inch (121.9-cm)
components in building
construction is a common
practice, as many of the
components are
manufactured in standard
sizes, such as 16-, 24-, and
___________ (40.6-, 60.9-, and
_______cm).
, a. floor plans
5. Construction drawing b. furniture plans
legends combine graphic c. electrical plans
symbols with notes and d. lighting plans
are used on what type of e. a and b only
drawings? f. c and d only
g. All of the above
6. In a building project, True
various contractual
agreements are needed
between the parties
involved in order to detail
each party's
responsibilities.
7. For bidding purposes, no
specifications are referred
to as "closed" or "open".
"Closed" means _____
product can be used on
the project other than
what is specified.
8. Sometimes a designer 10
will require the client to
pay them a "retainer" (a
sum of money) at the
beginning of a project. The
usual retainer is what
percent of the total fees?
, 9. What is the most framing
common method of
dimensioning, which is
advantageous because it
most closely follows the
construction sequence in
the field and informs the
particular trades of
dimensions that are the
most important to their
area of construction?
10. A good practice, to mock-up
give an overview of the
sequence of sheets and
their individual contents
before the construction
drawings are drafted up, is
to first create a ______________
set of construction
drawings.
1. When drafting a the same scale
demolition plan(s), in
order to allow the viewer
to ascertain the scale of
objects and features, it is
generally drawn
________________ as the floor
plans.
2. When no former plans field measuring
exist of a building or
interior space to be
renovated, new drawings
must be made through a
process commonly called
_______.