100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

ACI TEST QUESTIONS WITH CORRECT ANSWERS 2025

Beoordeling
-
Verkocht
-
Pagina's
9
Cijfer
A+
Geüpload op
10-09-2025
Geschreven in
2025/2026

ACI TEST QUESTIONS WITH CORRECT ANSWERS 2025

Instelling
ACI TE
Vak
ACI TE









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
ACI TE
Vak
ACI TE

Documentinformatie

Geüpload op
10 september 2025
Aantal pagina's
9
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

ACI TEST QUESTIONS WITH CORRECT
ANSWERS 2025
The total time allowed between obtaining the first and final portions of a composite sample is - CORRECT
ANSWER -15 minutes



When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the
individual samples are remixed into a composite sample (T or F) - CORRECT ANSWER -F



Tests for slump, temperature, and air content must begin within minutes after obtaining the
composite sample - CORRECT ANSWER -5 minutes



Begin molding test specimens within minutes after obtaining the composite sample - CORRECT
ANSWER -15 minutes



The concrete samples should be protected from - CORRECT ANSWER -the sun, wind, and other sources
of rapid evaporation, from contamination



When test specimens are to be molded, the minimum size of sample obtained is - CORRECT ANSWER -28
L (1 ft^3)



The primary objective of the sampling process is to obtain a representative sample (T or F) - CORRECT
ANSWER -T



When sampling from a revolving drum truck mixer collect concrete from portions of the batch -
CORRECT ANSWER -2 or more



Wet sieving is performed - CORRECT ANSWER -when the concrete contains aggregates larger than
appropriate for a test



When sampling from a paving mixer it is not acceptable to place 3 small containers on the sub grade in
order to obtain the required samples of concrete (T or F) - CORRECT ANSWER -F

, TEMPERATURE - CORRECT ANSWER -



it may require up to min before the temp stabilizes when the NMS of the coarse agg is greater than
- CORRECT ANSWER -20min., 3in.



The container for the concrete shall be large enough to provide at least inches, or of coarse
agg, of concrete in all directions around the TMD - CORRECT ANSWER -3in., 3 x NMS



The temperature measuring device shall have the capability of measuring the temperature of the freshly
mixed concrete to ± oF accuracy and have a

range of to ______ oF. - CORRECT ANSWER -1,30to120



A composite sample of concrete is not required even if the only purpose for obtaining the sample is to
determine temperature. T or F - CORRECT ANSWER -T



The Temperature Measuring Device used for determining concrete temperature must be calibrated
or whenever there is a question of accuracy. - CORRECT ANSWER -annually



The temperature of freshly mixed concrete can be measured in - CORRECT ANSWER -all of the above



Submerge the sensing portion of the thermometer at least inches into the concrete - CORRECT
ANSWER -3



Gently press concrete around the thermometer such that the does not

affect the reading. - CORRECT ANSWER -ambient air temp



The thermometer must remain in the concrete during the measurement for a minimum of
minutes. In addition, the temperature measurement must be completed within minutes after
obtaining the sample. - CORRECT ANSWER -2, 5



The temperature of freshly mixed concrete is measured and recorded to the nearest ----------- CORRECT
ANSWER -1 degree
€11,98
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
TestBanktutor01
3,0
(1)

Maak kennis met de verkoper

Seller avatar
TestBanktutor01 Chamberlian School of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
7
Lid sinds
8 maanden
Aantal volgers
0
Documenten
925
Laatst verkocht
3 uur geleden

3,0

1 beoordelingen

5
0
4
0
3
1
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen