Three essential drivers that must be achieved to generate positive characteristics in project teams correct answers Cohesiveness, Trust, Motivation The five stages Dr. Bruce Tuckman (1965) introduced of group development correct answers Forming, Storming, Norming, Performing, Adjorning Forming correct answers In this stage, team members may be meeting for the first time. Often, no one really knows much about anyone else on the team. It may be premature to refer to this group of individuals as a team. It is a time of introduction and forming relationships and understanding from exchange of information. Storming correct answers Team members are beginning to know about each other, but they do not yet understand how to work together. Members may "jockey for position" within the team. The dynamics of working together beyond any written statement of "roles and responsibilities" are being established. Personalities surface, showing the strengths, weaknesses, and personal needs of each individual on the team. Integration into a team may come with some struggle and conflict. Norming correct answers Team members have "figured out" how they will interact with each other. Working relationships are beginning to form. Trust and understanding is beginning to form between team members. They are beginning to feel comfortable working together and openly and willingly sharing information. Performing correct answers Team members are fully comfortable working together. Trust has been developed. Working relationships have jelled. Work is being conducted and project progress is occurring. Adjourning correct answers This only occurs when all the team's work has been completed and the team is no longer required. This may occur at any time in the project life cycle.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

WGU - C722 || A+ Score Secured.


Three essential drivers that must be achieved to generate positive characteristics in project teams
correct answers Cohesiveness, Trust, Motivation


The five stages Dr. Bruce Tuckman (1965) introduced of group development correct answers
Forming, Storming, Norming, Performing, Adjorning


Forming correct answers In this stage, team members may be meeting for the first time. Often,
no one really knows much about anyone else on the team. It may be premature to refer to this
group of individuals as a team. It is a time of introduction and forming relationships and
understanding from exchange of information.


Storming correct answers Team members are beginning to know about each other, but they do
not yet understand how to work together. Members may "jockey for position" within the team.
The dynamics of working together beyond any written statement of "roles and responsibilities"
are being established. Personalities surface, showing the strengths, weaknesses, and personal
needs of each individual on the team. Integration into a team may come with some struggle and
conflict.


Norming correct answers Team members have "figured out" how they will interact with each
other. Working relationships are beginning to form. Trust and understanding is beginning to form
between team members. They are beginning to feel comfortable working together and openly
and willingly sharing information.


Performing correct answers Team members are fully comfortable working together. Trust has
been developed. Working relationships have jelled. Work is being conducted and project progress
is occurring.


Adjourning correct answers This only occurs when all the team's work has been completed and
the team is no longer required. This may occur at any time in the project life cycle.

,Co-located Teams correct answers involves team members physically working at the same
location or holding project meetings together in a common setup.


Virtual Teams correct answers are teams whose members interact primarily through electronic
communications. Members of a virtual team may be within the same building or across
continents.


Two common situations occur that may prompt a change to the baseline scope correct answers
The scope may be expanded to include additional functionality or the scope may be diminished
due to changes in the project environment such as reduced funding or requirements or changing
time/due date.


Scope creep correct answers occurs when the project team integrates enhancements to the scope
without proper evaluation and approval.


work performance data correct answers will identify the work activities that are completed,
partially completed, or not started.


risk register correct answers is a list of potential risks, how the risks will be monitored, and what
action will be taken should the risk event occur.


corrective action correct answers is a document issued to identify quality failures and how they
will be corrected. The deliverable itself may need to be reworked and the project plan may need
to be revised to ensure that future deliverables do not include the same error.


The Four Categories of Change correct answers Contingency plans, improvement changes,
external events, scope change


The change management system correct answers is in place to formally identify, evaluate,
decide, and communicate project changes.

,Recording correct answers is the process of documenting and archiving project-related
information.


Reporting correct answers is a key nonverbal communications methodology used to inform and
to document project information.


Weekly status reports that are often working documents for the team to communicate: correct
answers Accomplishments, Issues, Schedules, Resource utilization


Monthly status reports for senior stakeholders that would include: correct answers Project
overview bragging about progress, Issues including red light (critical) problems needing
immediate resolution, yellow light items that are warning flags, and resolved issues, Current
accomplishments, Future plans for the next month, Resource utilization and plans


Monthly Financial Report correct answers showing progress against the budget quantifying
monies spent and planned to be spent and identifying issues with recommendations for resolution


Change management reporting correct answers showing changes identified, requiring approval,
and resolution.


Project controls correct answers are the data gathering, management, and analytical processes
used to predict, understand, and constructively influence the time and cost outcomes of a project
or program.


Three Aspects of Project Quality correct answers quality management, quality assurance, and
quality control.


Quality management correct answers is the process of identifying the customer's requirements
and how they will be measured.

, Quality assurance correct answers is the process of validating that the requirements and
measurements are appropriate for the project environment.


Quality control correct answers is the process of monitoring and changing project execution to
ensure that activities are being executed as planned and will result in meeting the customer
requirements. It is the monitoring and controlling process that occurs during project execution.


Standards correct answers are requirements that are generally accepted by a group of firms that
produce similar products or services.


Requirements correct answers are what the customer needs to achieve from the completed
project.


Quality audits correct answers are rigorous reviews of the project performance. These reviews
are often completed by groups of experts outside of the project team such as a company's quality
assurance (QA) department or an outside consultant.


positive outcomes of the audit correct answers Identifying issues before we go into production
Identifying best practices that can be adopted by future project teams
Identifying lessons learned that can improve performance on other projects
Identifying problems that can be corrected before additional costs are incurred


Checklists correct answers are one way of monitoring that activities/tasks have been addressed
and one method of assuring that all needed documents are written.


project charters correct answers contain enough information to understand who the project
sponsor and project manager are, the purpose the project, a general idea of the scope, budget, and
schedule.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
27 augustus 2025
Aantal pagina's
36
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
SirAnton NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in matters
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
758
Lid sinds
3 jaar
Aantal volgers
439
Documenten
38001
Laatst verkocht
1 week geleden
Reign Supreme Scholarly || Enlightened.

Get your revised study materials available here and elevate your educational outcomes. I have numerous verified learning materials (Research, Exams Questions and answers, Assignments, notes etc) for different courses guaranteed to boost your academic results. I am dedicated to offering you the best and unique learning content. You are encouraged to inquire further assistance from this end whenever need be. Kindly remember to leave your review, understanding your satisfaction is essential . We highly appreciate clients who always come back for more of the study content we offer, you are extremely valued. All the best.

Lees meer Lees minder
3,7

114 beoordelingen

5
49
4
20
3
22
2
8
1
15

Populaire documenten

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen