True / False 1. Until the 1980s, project management primarily focused on providing schedule and resource data to top management in the military, computer, and construction industries. a. True b. False ANSWER: True RATIONALE: Feedback: Until the 1980s, project management primarily focused on providing schedule and resource data to top management in the military, computer, and construction industries. Today’s project management involves much more, and people in every industry and every country manage projects. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.2 LEARNING OBJECTIVES: INFO.SCHW.14.1 - LO: 1-1 NATIONAL STANDARDS: United States - BUSPROG: Technology TOPICS: Introduction KEYWORDS: Bloom's: Knowledge 2. A difference between operations and projects is that operations end when their objectives have been reached, whereas projects do not. a. True b. False ANSWER: False RATIONALE: Feedback: Projects are different from operations in that they end when their objectives have been reached or the project has been terminated. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.4 LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Comprehension 3. Every project should have a well-defined objective. a. True Cengage Learning Testing, Powered by Cognero Page 2 b. False ANSWER: True RATIONALE: Feedback: A project has a unique purpose. Every project should have a well-defined objective. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.6 LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Knowledge 4. Projects should be developed in increments. a. True b. False ANSWER: True RATIONALE: Feedback: A project is developed using progressive elaboration. Projects are often defined broadly when they begin, and as time passes, the specific details of the project become clearer. Therefore, projects should be developed in increments. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.6 LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Comprehension 5. Resources in a project should be used effectively because they are limited. a. True b. False ANSWER: True RATIONALE: Feedback: A project requires resources, often from various areas. Resources, however, are limited and must be used effectively to meet project and other corporate goals. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p. 7 LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Comprehension Cengage Learning Testing, Powered by Cognero Page 3 6. A project manager’s primary role is to provide the funding for a project. a. True b. False ANSWER: False RATIONALE: Feedback: A project sponsor usually provides the direction and funding for a project. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.7 LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Knowledge 7. One of the main reasons why project management is challenging is because of the factor of uncertainty. a. True b. False ANSWER: True RATIONALE: Feedback: A project involves uncertainty. Every project is unique and thus it is sometimes difficult to define its objectives clearly, estimate how long it will take to complete, or determine how much it will cost. This uncertainty is one of the main reasons project management is so challenging. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.7 LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Comprehension 8. Questions about how a team will track schedule performance is related to a project’s scope. a. True b. False ANSWER: False RATIONALE: Feedback: Project scope deals with questions such as, “What work will be done as part of the project?”, “What unique product, service, or result does the customer or sponsor expect from the project?”, or “How will the scope be verified?” POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.7 LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2 NATIONAL STANDARDS: United States - BUSPROG: Technology

Meer zien Lees minder
Instelling
Information Technology Project Management 8th
Vak
Information Technology Project Management 8th











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Information Technology Project Management 8th
Vak
Information Technology Project Management 8th

Documentinformatie

Geüpload op
16 augustus 2025
Aantal pagina's
583
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

TEST BANK For, Information Technology Project
Management 8th Edition Kathy Schwalbe


True / False

1. Until the 1980s, project management primarily focused on providing schedule and resource data to top
management in the military, computer, and construction industries.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: Until the 1980s, project management primarily focused on providing
schedule and resource data to top management in the military, computer, and
construction industries. Today’s project management involves much more, and
people in every industry and every country manage projects.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.2
LEARNING OBJECTIVES: INFO.SCHW.14.1 - LO: 1-1
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS: Introduction
KEYWORDS: Bloom's: Knowledge


2. A difference between operations and projects is that operations end when their objectives have been
reached, whereas projects do not.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Projects are different from operations in that they end when their
objectives have been reached or the project has been terminated.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.4
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


3. Every project should have a well-defined objective.
a. True
Cengage Learning Testing, Powered by Cognero Page 1

, b. False
ANSWER: True
RATIONALE: Feedback: A project has a unique purpose. Every project should have a well-defined
objective.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.6
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Knowledge


4. Projects should be developed in increments.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project is developed using progressive elaboration. Projects are often
defined broadly when they begin, and as time passes, the specific details of the
project become clearer. Therefore, projects should be developed in increments.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.6
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


5. Resources in a project should be used effectively because they are limited.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project requires resources, often from various areas. Resources,
however, are limited and must be used effectively to meet project and other
corporate goals.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p. 7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension

Cengage Learning Testing, Powered by Cognero Page 2

,6. A project manager’s primary role is to provide the funding for a project.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: A project sponsor usually provides the direction and funding for a project.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Knowledge


7. One of the main reasons why project management is challenging is because of the factor of uncertainty.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project involves uncertainty. Every project is unique and thus it is
sometimes difficult to define its objectives clearly, estimate how long it will take to
complete, or determine how much it will cost. This uncertainty is one of the main
reasons project management is so challenging.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


8. Questions about how a team will track schedule performance is related to a project’s scope.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Project scope deals with questions such as, “What work will be done as
part of the project?”, “What unique product, service, or result does the customer or
sponsor expect from the project?”, or “How will the scope be verified?”
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Technology

Cengage Learning Testing, Powered by Cognero Page 3

, TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


9. In order to be realistic, a project manager should always set discrete goals instead of a range of
objectives.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Projects involve uncertainty and limited resources. Thus they rarely finish
according to their original scope, time, and cost goals. Instead of discrete target
goals, it is often more realistic to set a range of goals.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.8
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


10. Managing the triple constraint primarily involves making trade-offs between resources and quality.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Managing the triple constraint involves making trade-offs
between scope, time, and cost goals for a project. Experienced project
managers know that one must decide which aspect of the triple constraint is
most important.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.9
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Knowledge


11. The only responsibility of a project manager is to meet the specific scope, time, and cost goals of a
project.
a. True
b. False
ANSWER: False


Cengage Learning Testing, Powered by Cognero Page 4

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
testbankmaster0134 Havard School
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
35
Lid sinds
2 jaar
Aantal volgers
1
Documenten
1378
Laatst verkocht
1 week geleden
The high scoring study materials readily available

anyone struggling with complex topic? never struggle anymore my notes simplify the toughest subjects. Materials are well organized and simplified and hence boost your grades.

3,4

5 beoordelingen

5
3
4
0
3
0
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen