100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

CGM-C PRE TEST QUESTIONS WITH 100% CORRECT ANSWERS!!

Beoordeling
-
Verkocht
-
Pagina's
5
Cijfer
A+
Geüpload op
14-08-2025
Geschreven in
2025/2026

CGM-C PRE TEST QUESTIONS WITH 100% CORRECT ANSWERS!!

Instelling
CGM-C
Vak
CGM-C









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CGM-C
Vak
CGM-C

Documentinformatie

Geüpload op
14 augustus 2025
Aantal pagina's
5
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

CGM-C PRE TEST QUESTIONS WITH 100%
CORRECT ANSWERS!!




The purpose of Construction Quality Management is to: Answer - Achieve the
quality established by properly developed requirements through the combined
responsibility, but separate, efforts of contractor and Government personnel


Construction Quality Management is the performance of tasks, which ensure
that design and construction is performed: Answer - According to plans and
specifications, on time, within a defined budget and a safe work environment.


Partnering relationships are based upon: Answer - Building trust and
dedication to common goals


It is the responsibility of Quality Assurance Personnel to: Answer - Periodically
verify that the contractors system of control is working effectively.


An effective contractor quality control (CQC) program will: Answer - Be an
incentive for work to be done correctly the first time resulting in earlier
completion, reduced field overhead costs, and greater profits.


The success or failure of all contractors is based upon: Answer - The ability to
control costs, finance work, estimate jobs, schedule the work, and maintain
effective quality control.

, Quality Assurance Personnel have the responsibility to: Answer - Require
contractors to maintain the quality specified in the plans and specifications.


Inspection is: Answer - The process by which ongoing and completed work is
examined


During the punch-out inspection of a project: Answer - Quality Assurance
Personnel must assure that the contractor prepares a punch-list and makes
corrections.


If there is disagreement whether the contractor's work complies with the
contract: Answer - The government makes the final determination


Characteristics that describe a definable feature of work (DFOW) include:
Answer - Cross-referenced listings to the contractors construction schedule that
may have more than one definable feature under a section of the
specifications.


The _____________________ consists of daily checks of the work to assure
continuing compliance with contract requirements. Answer - Follow-up phase


The Quality Assurance Plan: Answer - Is a government management tool
establishing staffing, training, pre-award activities, and surveillance activities.


Testing is extremely important in Construction Quality Management and is
performed by: Answer - Both the contractor and the government


If the contractor does not provide an adequate superintendent, the contract
allows the contracting officer to: Answer - Require the contractor to assume
personal supervision of the work.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
EvaTee Phoenix University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
4969
Lid sinds
4 jaar
Aantal volgers
3554
Documenten
50638
Laatst verkocht
2 uur geleden
TIGHT DEADLINE? I CAN HELP

Many students don\'t have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don\'t hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded

3,9

907 beoordelingen

5
434
4
160
3
164
2
45
1
104

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen