CDT Practice Delivery Study Guide Exam latest update CDT Practice Delivery Study Guide Exam latest update CDT Practice Delivery Study Guide Exam latest update CDT Practice Delivery Study Guide Exam latest update CDT Practice Delivery Study Guide Exam latest update CDT Practice Delivery Study Guide Exam latest update CDT Practice Delivery Study Guide Exam latest update

Meer zien Lees minder
Instelling
CDT Practice Delivery
Vak
CDT Practice Delivery









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CDT Practice Delivery
Vak
CDT Practice Delivery

Documentinformatie

Geüpload op
29 juli 2025
Aantal pagina's
13
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

CDT Practice Delivery Study Guide
Exam latest update

m2-Which of the following is not a construction schedule milestone: a) submittal
approval b) Project Delivery and team selection process c) Procurement
(Bidding/negotiating/purchasing) Activities. d) Contract Completion - CORRECT
ANSWER-Project Delivery and team selection process

m6-If a date to proceed is not stipulated in the agreement, the owner should issue to the
contractor a: - CORRECT ANSWER-Notice to Proceed

m6-Pre-construction Activities Begin when the contractor has receivedL - CORRECT
ANSWER-A Letter of Intent to Award

m6-Which of the following is not a mobilization and Start up cost - CORRECT
ANSWER-Royalties, Licenses and Fees

m6-It is important to establish the site conditions prior to: - CORRECT ANSWER-
mobilization

m6-Mobilization typically occurs after: - CORRECT ANSWER-Receipt of a notice to
proceed and following a reconstruction meeting

m6-Which two types of bonds might be required during construction - CORRECT
ANSWER-Performance Bond and Bid Bond

m6-Inspections are done by the AHJ to determine if the construction complies with -
CORRECT ANSWER-Codes and Regulations

m6-The contractor Should being Preparation and Delivery for the Pre-construction
Submittals after which Event - CORRECT ANSWER-Execution of Agreement

m6-Payment and Performance bonds are which type of document - CORRECT
ANSWER-Pre-construction Submittal

m6-It is important for subcontract and purchase order documents to reference the -
CORRECT ANSWER-contract documents

, m6-Which two Parties are responsible for submittal of a set of construction documents
tot he AHJ for permit review - CORRECT ANSWER-Owner and Architect

m6-What is typically the contractor's first activity on the project site - CORRECT
ANSWER-
Mobilization

m7According to the AIA A201 The contractor has sole responsibility and control over
the following construction activities - CORRECT ANSWER-Means, methods,
techniques, sequences, procedures, coordination, job site safety

m7The responsibility of inspecting work already performed for proper conditions to
receive subsequent work lies with the - CORRECT ANSWER-Contractor

M7- The contractor's superintendent: - CORRECT ANSWER-Can not be changed
without the owners consent and communication is as binding as if given by the
contractor

m7- True or False - by executing the contract the contractor confirms that the contract
time is reasonable - CORRECT ANSWER-True

m7- The date of substantial completion is established by the - CORRECT ANSWER-
A/E

`m7- Under A201 who has the responsibility to pay sales, consumer, use and similar
taxes for the work provided? - CORRECT ANSWER-contractor

m-7If the contractor is delayed in the progress of the work by the owner the contractor
should: - CORRECT ANSWER-Write the A/E requesting a change order granting an
extension of time.

m7- Product equivalency, manufacturer, installation, operating cost, maintenance costs,
and warranty are major factors to be considered for: - CORRECT ANSWER-
Substitution Request

m7- All of the following my be accomplished through issuing change order except which
one? a) Change in bid date. b)Decrease in contract cost. c)Extension of Contract time.
d) Reduction in Scope of work. - CORRECT ANSWER-a Change in bid date.

m7 - All of the following are defined as a contract modification except which one?
a)change order b) Construction change Directive/work change directive c)Architect's
supplemental instructions/field order d) Addendum - CORRECT ANSWER-addendum
€11,86
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ACADEMICSUCCESS stuvia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
44
Lid sinds
9 maanden
Aantal volgers
3
Documenten
5076
Laatst verkocht
1 week geleden
STUDY HUB

WELCOME TO MY STUDY HUB ! I CREAT CLEAR CONCISE, AND EXAM-FOCUSED NOTES DESIGNED TO SAVE YOUR TIME AND BOOST YOUR GRADES .EVERY DOCUMENT IS CRAFTED FROM VERIFIED COURSE MATERIALS , STRUCTURED FOR EASY UNDERSTANDING, AND OPTIMIZED FOR QUICK REVISION . IF YOU WANT RELIABLE ,HIGH QUALITY RESOURCES THAT ACTUALLY HELP YOU SCORE HIGHER , YOU'RE IN THE RIGHT PLACE !"

4,3

24 beoordelingen

5
18
4
2
3
0
2
1
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen