LIRR LOCOMOTIVE ENGINEER TRAINEE PRE-EMPLOYMENT STUDY GUIDE
Block - ANSWERA length of track of defined limits, the use of which is governed by block signals, block limit signals, automatic speed control or any combination thereof. Automatic Block Signal System - ANSWERA block signal system wherein the use of each block is governed by an automatic block signal, the cab signal indicator or both. Automatic Speed Control System - ANSWERA system arranged so that its operation will automatically result in the following: A full service application of the train brakes if, while operating under a speed restriction, the speed of the train exceeds the predetermined rate. The application will continue until the train is either brought to a stop or, under the control on the engineer, it's speed is reduced to the predetermine rate. Interlocking - ANSWERAn arrangement of signals and signal appliances interconnected so that their movements must succeed each other improper sequence and for which interlocking rules are in effect. Cab Signal Indicator - ANSWERA signal indicator located in the engine control compartment displaying the maximum speed for the movement of the train. It will be used in conjunction with interlocking signals and either in conjunction with or in lieu of block signals. Job Briefing - ANSWERWhen reporting for duty, employees whose duties require coordination with other employees must hold a job briefing to review operational and safety conditions. If these conditions change, employees must hold an additional job briefing to discuss the new conditions. Time Table - ANSWERThe authority for the movement of regular trains subject to the rules. It contains classified schedules and special instructions relating to the movement of trains.
Geschreven voor
- Instelling
- LIRR Locomotive
- Vak
- LIRR Locomotive
Documentinformatie
- Geüpload op
- 29 juli 2025
- Aantal pagina's
- 3
- Geschreven in
- 2024/2025
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
lirr locomotive engineer trainee pre employment s
-
block answera length of track of defined limi
Ook beschikbaar in voordeelbundel