100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

VAPOUR RECOVERY ICC PRACTICE TEST 1 EXAM NEWEST VERSION -2025/2026- 100+ QUESTIONS AND VERIFIED ANSWERS 100% CORRECT GUARANTEED SUCCESS

Beoordeling
-
Verkocht
-
Pagina's
8
Cijfer
A+
Geüpload op
29-07-2025
Geschreven in
2024/2025

VAPOUR RECOVERY ICC PRACTICE TEST 1 EXAM NEWEST VERSION -2025/2026- 100+ QUESTIONS AND VERIFIED ANSWERS 100% CORRECT GUARANTEED SUCCESS

Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Vak

Documentinformatie

Geüpload op
29 juli 2025
Aantal pagina's
8
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

1


VAPOUR RECOVERY ICC PRACTICE TEST 1 EXAM NEWEST
VERSION -2025/2026- 100+ QUESTIONS AND VERIFIED
ANSWERS 100% CORRECT GUARANTEED SUCCESS



All of the following items should be on hand to react to a spill except?
Class A fire extinguisher
Which is not a component of a Healy phase II vapor recovery system?
Universal 37
Which of the following is not part of the hanging hardware?
Husky model 4885
What is mounted on the top of the manifold vent mast?
Pressure/vacuum vent cap
According to VR-201-A, a __________________ should be installed on the Healy
system if the flow rate us above 10 GMP?
Flow limiter
The quarterly inspection and Testing of a Healy Phase II EVR system should include
the following except?
Conduct a pressure decay test by a Healy Certified Technician - EO VR_-201-A
The first sign of oxygen depletion is?
Accelerated breathing and heartbeat
According to the PEI 500, a method of removing a portion of a facility from service
are, except?
Noting in defective equipment log

, 2


What procedure checks the integrity of the vapor check valve in the nozzle?
Nozzle bag test
Which of the following conditions is a Healy certified technician NOT required to
repair?
Reconnection of a breakaway after a drive off
During the annual inspection and testing of the vapor recovery system; the first
three steps are to:
i. Conduct static pressure performance of the Healy Clean air separator
ii. Conduct pressure decay test
iii. Conduct dispenser vapor line tightness test
iiii. ...?
What is the Fourth step?
Conduct V/L test on all nozzles
What procedure is required after a nozzle spout change?
Nozzle automatic shutoff test
A vapor recovery system generally uses what unit of measurement?
Inches of water
What is the lower limit of acceptable V/L for a nozzle?
.95
What organization does a technician have to be certified with to perform
maintenance on vapor recovery systems?
ICC- Title 23 2715
The clean air separator belongs to which system?
Healy Phase II EVR
€15,96
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
aceacademics
5,0
(1)

Maak kennis met de verkoper

Seller avatar
aceacademics Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2
Lid sinds
8 maanden
Aantal volgers
0
Documenten
1108
Laatst verkocht
3 maanden geleden

5,0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen