Illinois Roofing Exam 2 Questions and Answers
Which of these is required for a roofing contractor to property handle
| | | | | | | | | | |
asbestos containing materials? - Answer Provide worker and
| | | | | | | |
supervisor training to guide employees when ACM are found on the
| | | | | | | | | | |
jobsite.
|
Which of these is likely to result in the most lost work days due to
| | | | | | | | | | | | | |
employees illness or injury ? - Answer Back injury.
| | | | | | | | |
Which statement most accurately describes proper employee
| | | | | |
training program about blood borne pathogens? - Answer In a
| | | | | | | | | |
language familiar to employees.
| | | |
Which of these is recommended to a roofing contractors emergency
| | | | | | | | |
action plan? - Answer Escape routes must be specified in roofing location
| | | | | | | | | | | |
and jobsite.
| |
Which of these should always be worn to protect the eyes during tear offs?
| | | | | | | | | | | | |
- Answer Goggles
| | |
When falling protection commonly is required for roofing contractors
| | | | | | | |
employee? - Answer When employees are working six feet right more
| | | | | | | | | | |
above a lower level.
| | | |
Which statement most accurately describes proper use of slide guards
| | | | | | | | |
as a only fall protection system for steep slope roofing? - Answer Slide
| | | | | | | | | | | | |
guards may be used for work areas up to 8:12 pitch and up to 25 feet
| | | | | | | | | | | | | | | |
eave heights.
| |
Which of these is an appropriate response when employee suspects a
| | | | | | | | | |
possible leak in a LPG? - Answer Test the cylinder valve with soapy
| | | | | | | | | | | | |
water.
|
Which of these is an appropriate response when an employee
| | | | | | | | |
appears to be injured by falling from a roofing work surface? -
| | | | | | | | | | | |
Answer Do not move him and keep his head elevated.
| | | | | | | | | |
, The OSHA hazard communications standard prohibits which of the
| | | | | | | |
following? - Answer Unlabeled partially filled chemical containers left
| | | | | | | | |
overnight on a jobsite.
| | | |
Which of these is required by OSHA standards to be included when a n is
| | | | | | | | | | | | | |
completeing a required injury report? - Answer Any loss of conscious
| | | | | | | | | | |
due to a work related injury.
| | | | | |
How must a ladder be set up to meet OSHA requirements? - Answer The
| | | | | | | | | | | | |
ladder must be securely tied to a rigid support.
| | | | | | | | |
Which statement most accurately describes OSHA requirements for
| | | | | | |
safe use of a ladder? - Answer The ladder should never be moved
| | | | | | | | | | | | |
when a person is on it.
| | | | | |
Which of these is most commonly required to determine whether an
| | | | | | | | | |
existing building includes asbestos containing roofing materials
| | | | | | |
before project begins? - Answer Analysis of test samples of existing
| | | | | | | | | | |
roof material.
| |
Which of these is the most likely benefit of a pre bid conference ? - Answer
| | | | | | | | | | | | | | |
To provide all parties access to project documents and specifications.
| | | | | | | | | |
Which statement most accurately describes the impact of weather on
| | | | | | | | |
proper installation of roofing system? - Answer High humidity may
| | | | | | | | | |
interfere with proper bonding of roofing adhesives.
| | | | | | |
On new construction which one of these roof deck characteristics
| | | | | | | | |
are the primary responds of the roofing contractor? - Answer The
| | | | | | | | | | |
surface of the roof deck.
| | | | |
What does the NRCA recommend for all low slope roofing system
| | | | | | | | | |
drainage? - Answer Drainage within 48 hrs following rainfall under normal
| | | | | | | | | | |
drying conditions.
| |
Which one of these is NOT among the possible damage that can result
| | | | | | | | | | | |
from ponding or poor roof system drainage? - Answer Immediate
| | | | | | | | | |
changes in the slope and structural integrity of the roof
| | | | | | | | | |
Which of these is required for a roofing contractor to property handle
| | | | | | | | | | |
asbestos containing materials? - Answer Provide worker and
| | | | | | | |
supervisor training to guide employees when ACM are found on the
| | | | | | | | | | |
jobsite.
|
Which of these is likely to result in the most lost work days due to
| | | | | | | | | | | | | |
employees illness or injury ? - Answer Back injury.
| | | | | | | | |
Which statement most accurately describes proper employee
| | | | | |
training program about blood borne pathogens? - Answer In a
| | | | | | | | | |
language familiar to employees.
| | | |
Which of these is recommended to a roofing contractors emergency
| | | | | | | | |
action plan? - Answer Escape routes must be specified in roofing location
| | | | | | | | | | | |
and jobsite.
| |
Which of these should always be worn to protect the eyes during tear offs?
| | | | | | | | | | | | |
- Answer Goggles
| | |
When falling protection commonly is required for roofing contractors
| | | | | | | |
employee? - Answer When employees are working six feet right more
| | | | | | | | | | |
above a lower level.
| | | |
Which statement most accurately describes proper use of slide guards
| | | | | | | | |
as a only fall protection system for steep slope roofing? - Answer Slide
| | | | | | | | | | | | |
guards may be used for work areas up to 8:12 pitch and up to 25 feet
| | | | | | | | | | | | | | | |
eave heights.
| |
Which of these is an appropriate response when employee suspects a
| | | | | | | | | |
possible leak in a LPG? - Answer Test the cylinder valve with soapy
| | | | | | | | | | | | |
water.
|
Which of these is an appropriate response when an employee
| | | | | | | | |
appears to be injured by falling from a roofing work surface? -
| | | | | | | | | | | |
Answer Do not move him and keep his head elevated.
| | | | | | | | | |
, The OSHA hazard communications standard prohibits which of the
| | | | | | | |
following? - Answer Unlabeled partially filled chemical containers left
| | | | | | | | |
overnight on a jobsite.
| | | |
Which of these is required by OSHA standards to be included when a n is
| | | | | | | | | | | | | |
completeing a required injury report? - Answer Any loss of conscious
| | | | | | | | | | |
due to a work related injury.
| | | | | |
How must a ladder be set up to meet OSHA requirements? - Answer The
| | | | | | | | | | | | |
ladder must be securely tied to a rigid support.
| | | | | | | | |
Which statement most accurately describes OSHA requirements for
| | | | | | |
safe use of a ladder? - Answer The ladder should never be moved
| | | | | | | | | | | | |
when a person is on it.
| | | | | |
Which of these is most commonly required to determine whether an
| | | | | | | | | |
existing building includes asbestos containing roofing materials
| | | | | | |
before project begins? - Answer Analysis of test samples of existing
| | | | | | | | | | |
roof material.
| |
Which of these is the most likely benefit of a pre bid conference ? - Answer
| | | | | | | | | | | | | | |
To provide all parties access to project documents and specifications.
| | | | | | | | | |
Which statement most accurately describes the impact of weather on
| | | | | | | | |
proper installation of roofing system? - Answer High humidity may
| | | | | | | | | |
interfere with proper bonding of roofing adhesives.
| | | | | | |
On new construction which one of these roof deck characteristics
| | | | | | | | |
are the primary responds of the roofing contractor? - Answer The
| | | | | | | | | | |
surface of the roof deck.
| | | | |
What does the NRCA recommend for all low slope roofing system
| | | | | | | | | |
drainage? - Answer Drainage within 48 hrs following rainfall under normal
| | | | | | | | | | |
drying conditions.
| |
Which one of these is NOT among the possible damage that can result
| | | | | | | | | | | |
from ponding or poor roof system drainage? - Answer Immediate
| | | | | | | | | |
changes in the slope and structural integrity of the roof
| | | | | | | | | |