study guide Questions With Correct Answers
/ // // // // //
Clean //Water //Act //- //verified //answer(s)-
✔✔Law //set //into //place //in //1970 //for //storm //water //regulation
NPDES //- //verified //answer(s)-
✔✔Regulations /
/for //monitoring //storm //water //activity //on //a //construction //site, //are //outlined //in
Immediately /
/after //project //is //awarded //and //before //you //begin //any //site //work //- //verified //answer(s)-
✔✔When //should //you //read //and //understand //SWPP
Contaminated //ground //water //- //verified //answer(s)-
✔✔What //is //not //an //allowable //storm //water //discharge //or //non-storm //water //discharge
When //jurisdiction //of //operations //specifies //you //can //start //- //verified //answer(s)-
✔✔When //may //construction //activity //begin
303D //list //- //verified //answer(s)-✔✔Waters //that //fail //anti-
degradation //list //are //placed //on //which //list.
An //officer //and //project //owner //- //verified //answer(s)-
✔✔SWPPPs //certification //are //signed //by //who
,FALSE //- //verified //answer(s)-
✔✔The //document //that //must //be //completed //signed //and //submitted //to //the //state //to //obtain
//authorization //to //discharge //is //the //NOT. //(T/F)
All //construction //has //been //completed //both //inside //and //outside //- //verified //answer(s)-
✔✔NOT //can //be //filed //when
is //in //charge //of //daily //activities //- //verified //answer(s)-
✔✔Operations //on //a //construction //site //are //the //entity //in //charge //of //plans //and //specification
//and //the //entity //who?
Stay //out //of //trouble //with //the //law //- //verified //answer(s)-
✔✔Motives //for //staying //in //compliance //with //storm //water //objectives?
To /
/protect /
/and /
/preserve /
/beneficial /
/use /
/of /
/U.S. /
/waters, //maintaining //their //clean, //physical //and //biological //integrity //- //verified //answer(s)-
✔✔Objectives //of //the //clean //water //act //are
National //Pollutant //Discharge //Elimination //System //- //verified //answer(s)-
✔✔NPDES //stands //for
Site /
/description /
/and /
/maps, /
, /inspection /
/and /
/maintenance /
/procedure. /
/Potential /
/pollutant /
/sources, /
/schedules /
/of /
/activities, /
/site //contact //information, //plan //certification //documents, //site //contact //info //and //descriptions
//of //controls //BMP //- //verified //answer(s)-✔✔Which //are //a //component //of //a //good //SWPPP
False //- //verified //answer(s)-
✔✔Construction //sediment //is //not //considered //a //potential //pollutant //source //(T/F)
Project //owner, //SWPPP //designer //- //verified //answer(s)-
✔✔When /
/modifying //or //substituting //a //storm //water //BMP //the //contractor //must //consult //with
False //- //verified //answer(s)-
✔✔NOI /
/must /
/be /
/submitted /
/to /
/the /
/appropriate //agency //before //the //storm //water //pollution //preventive //plan //is //developed //(T/F)
False, //303d //List //- //verified //answer(s)-
✔✔Name //of //the //list //with //impaired //waters //is //called //totally //daily //maximum //load //(T/F)