100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

NICET LEVEL 3 HIGHWAY CONSTRUCTION NEWEST 2025 ACTUAL EXAM QUETIONS WITH CORRECT ANSWERS

Beoordeling
5,0
(1)
Verkocht
1
Pagina's
24
Cijfer
A+
Geüpload op
16-07-2025
Geschreven in
2024/2025

NICET LEVEL 3 HIGHWAY CONRUCTION NEWEST 2025 ACTUAL EXAM QUETIONS WITH CORRECT ANSWERS

Instelling
NICET HIGHWAY CONSTRUCTION
Vak
NICET HIGHWAY CONSTRUCTION










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
NICET HIGHWAY CONSTRUCTION
Vak
NICET HIGHWAY CONSTRUCTION

Documentinformatie

Geüpload op
16 juli 2025
Aantal pagina's
24
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

NICET LEVEL 3 HIGHWAY CONSTRUCTION NEWEST 2025 ACTUAL EXA
| | | | | | | |


170 QUESTIONS AND CORRECT DETAILED ANSWERSWITH RATIONALE
| | | | | | |


(VERIFIED ANSWERS) |

Study |online |at |https://quizlet.com/_fw78j6

1. How are lights and luminaires controlled?
| | | | | By a PhotoCell Con-
| | |


trol and for circuits
| | |


operating at less
| | |


than 10 amps, a
| | | |


Photocell switch is
| | |


used
|




2. What are the three types of inspection?
| | | | | | Initial, Interim and | |


routine

3. How many times per foot should loop wires be
| | | | | | | | 5 twists per foot
| | |


twisted?
|




4. How wide should loops be cut and at what depth? 5/16th Wide and 1
| | | | | | | | | | | | |


3/4" deep |




5. what should be installed on loops wires they cross a A plastic sleeve that
| | | | | | | | | | | |


crack or joint?
| | | extends 4" past the | | | |


joint/crack. |




6. How should spare signal conductors be arraigned
| | | | | | Spare conductors |


inside the box?
| | | should be connect-
| | |


ed to a terminals.un-
| | | | |


used
|




7. What should happen prior and during the installa-
| | | | | | | 1. Clean saw cuts | |


tion of loops wires?
| | | | and remove debris
| | |


by means of sand-
| | | |


blasting, water blast-
| | |


ing or wire brushing
| | | |


2. Do not allow ve- | | |


hicles to drive over
| | | |


open cuts
| |


3. Utilized plas- |


tic sleeves between
| |


joints
|




8. How is loop wire required to be placed?
| | | | | | | continuously
1 |/ |24

, NICET LEVEL 3 HIGHWAY CONSTRUCTION NEWEST 2025 ACTUAL EXA
| | | | | | | |


170 QUESTIONS AND CORRECT DETAILED ANSWERSWITH RATIONALE
| | | | | | |


(VERIFIED ANSWERS) |

Study |online |at |https://quizlet.com/_fw78j6

9. What is placed ontop of continuous loop wires?
| | | | | | | 2' long Backer Rod
| | |




10. What is the required wire slack amount left inside of Minimum of 36"
| | | | | | | | | | |


pull box?
| |




11. How long until subjected live load can be applied to
| | | | | | | | | Until concrete meets| |


anchor bolts?
| | it required 28 day
| | | |


strength
|




12. What type of pattern is recommended when tight-
| | | | | | | The Star Pattern| |


ening bolts?
| |




13. Prior to erection of traffic lights,What are the ele-
| | | | | | | | | 1. Bent or damaged | |


ments an inspector is looking for?
| | | | | | parts
|


2. damaged coatings |


3. Distortions
4. defective fabrica- |


tion
|




14. What elements of a traffic light assembly should be
| | | | | | | | 1. Posts
inspected prior to erection?
| | | | 2. End Frames |


3. Mast arms |


4. Trusses

15. How can light poles be erected?
| | | | | Light poles and light | | |


supports can be as-
| | | |


sembled from the
| | |


ground if they con-
| | | |


tain a short can-
| | | |


tilevered arms.
| |




16. What are the inspection types for welds?
| | | | | | Magnetic Particle |


testing (MT) and | |


dye-penetrant (PT)
| |


testing or ultrasonic
| | |


testing
|




17.
2 |/ |24

, NICET LEVEL 3 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EXA
| | | | | | | |


170 QUESTIONS AND CORRECT DETAILED ANSWERSWITH RATIONALE
| | | | | | |


(VERIFIED ANSWERS) |

Study |online |at |https://quizlet.com/_fw78j6
What should be provided if conduit crosses a struc-
| | | | | | | | Metal expansion and | |


tural joint?
| | deflection fittings
| |




18. What is the dimensions of the copper clad steel
| | | | | | | | Rods should be | |


rods?
| 5/8th thick and 8'
| | | |


long.
|




19. What are the size of micropiles?
| | | | | Typically less than | |


12"
|




20. What is the size of driven piles?
| | | | | | Between 12 and 36" | | |




21. What is the required surface temperature for paint-
| | | | | | | Surfacetemps must | |


ing a bridge?
| | | be between 50 and
| | | |


100 degrees
| |




22. When painting a bridge, what must be the humidity
| | | | | | | | 85% or less unless | | |


percentage be?
| | manufactures rec-
| |


ommendations say
| |


otherwise
|




23. When cleaning unsound paint, how far into the in-
| | | | | | | | Extend the prepared | |


tact coat should you be?
| | | | | area at least 2 inches
| | | | |


into adjacent tightly
| | |


adhering, in- tact
| | |


coating.
|




24. When should primer be applied when painting a
| | | | | | | . Only where paint
| | |


bridge?
| is removed to bare
| | | |


metal. Otherwise,
| |


apply only intermedi- | |


ate and finish paints
| | | |




25. What do the color bonnets on fire hydrants mean? Light Blue -
| | | | | | | | | | |


1,500GPM or above | |


Green: |


1000-1499GPM
Orange: 500 - | |




3 |/ |24

Beoordelingen van geverifieerde kopers

Alle reviews worden weergegeven
3 maanden geleden

5,0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Lectphilip West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
168
Lid sinds
1 jaar
Aantal volgers
6
Documenten
17934
Laatst verkocht
3 uur geleden
WELCOME TO LECTPHILIP, A PLACE WHERE WE UNLOCK YOUR ACADEMIC OPPORTUNITIES

On this page, you find all documents, package deals and flashcards offered by seller lectphilip

4,3

24 beoordelingen

5
14
4
5
3
4
2
1
1
0

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen