100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

VIRGINIA DEQ SWM INSPECTOR EXAM CERTIFICATION - COMPREHENSIVE 300 QUESTIONS AND ANSWERS STUDY GUIDE

Beoordeling
-
Verkocht
-
Pagina's
24
Geüpload op
12-07-2025
Geschreven in
2024/2025

VIRGINIA DEQ SWM INSPECTOR EXAM CERTIFICATION - COMPREHENSIVE 300 QUESTIONS AND ANSWERS STUDY GUIDE...

Instelling
VIRGINIA DEQ SWM INSPECTOR
Vak
VIRGINIA DEQ SWM INSPECTOR










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
VIRGINIA DEQ SWM INSPECTOR
Vak
VIRGINIA DEQ SWM INSPECTOR

Documentinformatie

Geüpload op
12 juli 2025
Aantal pagina's
24
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Onbekend

Onderwerpen

Voorbeeld van de inhoud

VIRGINIA DEQ SWM INSPECTOR EXAM CERTIFICATION -
COMPREHENSIVE 300 QUESTIONS AND ANSWERS STUDY GUIDE




1. Q: What is the primary federal law that regulates stormwater
discharges? A: The Clean Water Act (CWA), specifically Section 402 which
established the National Pollutant Discharge Elimination System (NPDES)
program.

2. Q: What Virginia regulation governs stormwater management? A:
Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-
870).

3. Q: What is the minimum disturbed area threshold for requiring a
stormwater management plan? A: 2,500 square feet of land disturbance.

4. Q: What is the definition of "land disturbance" under Virginia
regulations? A: A manmade change to the land surface that potentially changes
its runoff characteristics including clearing, grading, or excavating.

5. Q: What is the maximum civil penalty for violating stormwater
regulations in Virginia? A: Up to $32,500 per violation per day.

6. Q: How long must construction records be maintained after project
completion? A: A minimum of 3 years.

7. Q: What is the minimum inspection frequency for active construction
sites? A: At least once every 7 calendar days and within 24 hours of a storm
event of 0.5 inches or greater.

8. Q: What constitutes a "storm event" requiring additional inspection? A:
A precipitation event of 0.5 inches or greater in a 24-hour period.

9. Q: Who can conduct stormwater inspections in Virginia? A: Only
certified stormwater inspectors or individuals under their direct supervision.

10. Q: What is the definition of "waters of the state" in Virginia? A: All
surface waters, groundwaters, and wetlands within the boundaries of Virginia.

,11. Q: What is the statute of limitations for stormwater violations in
Virginia? A: 5 years from the date the violation was discovered or should have
been discovered.

12. Q: What is required for a General Permit for Discharges of Stormwater
from Construction Activities? A: Registration with DEQ and development of
a Stormwater Pollution Prevention Plan (SWPPP).

13. Q: What is the minimum bond amount required for land disturbance
activities? A: $3,000 per acre of disturbed land, with a minimum of $10,000.

14. Q: What is the definition of "total maximum daily load" (TMDL)? A:
The maximum amount of a pollutant that a water body can receive and still
meet water quality standards.

15. Q: What is the Chesapeake Bay TMDL requirement for new
development? A: No net increase in nonpoint source pollution loads.

16. Q: What is the definition of "redevelopment" under Virginia
stormwater regulations? A: Development activity on previously developed
land that results in land disturbance.

17. Q: What is the minimum setback requirement for stormwater BMPs
from property lines? A: Generally 10 feet, but varies by BMP type and local
ordinances.

18. Q: What is the definition of "impervious surface"? A: A surface
composed of material that significantly impedes or prevents natural infiltration
of water into soil.

19. Q: What is the maximum allowable turbidity level for stormwater
discharges? A: 50 NTU (Nephelometric Turbidity Units) above background
levels.

20. Q: What is the definition of "hotspot" in stormwater management? A:
A land use or activity that generates higher concentrations of stormwater
pollutants.

21. Q: What is the minimum treatment requirement for stormwater
runoff? A: Treatment of the 1-year, 24-hour storm event or the first 0.5 inches
of runoff.

22. Q: What is the definition of "infiltration" in stormwater management?
A: The process by which water on the ground surface enters the soil.

, 23. Q: What is the Virginia Stormwater Management Program (VSMP)
authority? A: The entity responsible for implementing the stormwater
management program, typically DEQ or approved localities.

24. Q: What is the definition of "best management practice" (BMP)? A: A
structural or non-structural practice designed to prevent or reduce water
pollution.

25. Q: What is the minimum design storm for stormwater quantity
management? A: The 10-year, 24-hour storm event.

26. Q: What is the definition of "linear development project"? A: Road,
pipeline, or utility projects that are linear in nature.

27. Q: What is the Virginia Stormwater BMP Clearinghouse? A: An online
resource providing approved BMP specifications and design standards.

28. Q: What is the definition of "off-site" stormwater management? A:
Managing stormwater at a location other than the development site.

29. Q: What is the minimum required professional engineer involvement in
stormwater plans? A: Plans must be prepared by or under the direct
supervision of a licensed professional engineer.

30. Q: What is the definition of "water quality" in stormwater
management? A: The chemical, physical, and biological characteristics of
water.

31. Q: What is the Virginia Stormwater Management Handbook? A: The
official technical guidance document for stormwater management in Virginia.

32. Q: What is the definition of "peak flow rate"? A: The maximum
instantaneous flow rate during a storm event.

33. Q: What is the minimum insurance requirement for stormwater
inspectors? A: General liability insurance of at least $1 million per occurrence.

34. Q: What is the definition of "runoff coefficient"? A: The ratio of peak
runoff rate to peak rainfall rate.

35. Q: What is the Virginia Stormwater Management Act? A: Code of
Virginia Title 62.1, Chapter 3.1, Articles 2.3 and 2.4.
€20,10
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
luzlinkuz Chamberlain University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1427
Lid sinds
4 jaar
Aantal volgers
849
Documenten
27650
Laatst verkocht
3 dagen geleden

3,7

303 beoordelingen

5
131
4
61
3
54
2
17
1
40

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen