100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

Georgia (GA) Low Voltage-General Exam

Beoordeling
-
Verkocht
-
Pagina's
71
Cijfer
A+
Geüpload op
03-07-2025
Geschreven in
2024/2025

This credential covers all low-voltage work except those requiring specialty licenses. It includes alarms, telecommunications, access control, CCTV, and networking systems. The exam covers NEC Articles related to low voltage, basic electronics, installation practices, splicing, testing, troubleshooting, and safety codes. Eligibility often requires 4 years of experience or equivalent training. The test has about 100–125 questions and takes up to 4 hours. Passing allows the license holder to work across multiple low-voltage categories, except where a specialized license is required.

Meer zien Lees minder
Instelling
Vak











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Vak

Documentinformatie

Geüpload op
3 juli 2025
Aantal pagina's
71
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Georgia (GA) Low Voltage-General Exam
Question 1. Which agency regulates low voltage contractor licensing in Georgia?

A) Georgia Department of Labor

B) Georgia Construction Industry Licensing Board

C) Georgia Electrical Safety Authority

D) Georgia Department of Revenue

Answer: B

Explanation: The Georgia Construction Industry Licensing Board oversees licensing, regulations, and
disciplinary actions for low voltage contractors in Georgia.



Question 2. What is a primary purpose of obtaining a low voltage permit before installation?

A) To ensure compliance with local building codes and safety standards

B) To increase project costs

C) To bypass safety regulations

D) To reduce insurance premiums automatically

Answer: A

Explanation: Permits ensure installations meet safety and code requirements, preventing hazards and
ensuring legal compliance.



Question 3. Which federal regulation requires employers to provide workers' compensation coverage?

A) OSHA regulations

B) Fair Labor Standards Act

C) Georgia Workers' Compensation Act

D) Americans with Disabilities Act

Answer: C

Explanation: Georgia law mandates employers to carry workers' compensation insurance to cover
employee injuries.



Question 4. What is the main purpose of the Americans with Disabilities Act (ADA) in low voltage system
installation?

A) To regulate electrical wiring standards

,Georgia (GA) Low Voltage-General Exam
B) To ensure accessibility for persons with disabilities

C) To oversee fire safety standards

D) To license low voltage contractors

Answer: B

Explanation: ADA requires that facilities and systems be accessible to persons with disabilities,
influencing design and installation.



Question 5. Which document provides guidance on employer tax obligations for low voltage businesses?

A) OSHA Form 300

B) Circular E (Employer's Tax Guide)

C) OSHA 10-Hour Training Manual

D) Georgia Business License Handbook

Answer: B

Explanation: Circular E offers IRS guidance on employer tax responsibilities, including payroll and
employment taxes.



Question 6. When installing low voltage systems, why is NFPA standard compliance important?

A) To qualify for government grants

B) To ensure fire safety and prevent electrical fires

C) To reduce installation costs

D) To speed up permit approval

Answer: B

Explanation: NFPA standards address fire safety and electrical code requirements critical for safe system
installation.



Question 7. Which certification is typically required to verify the safety of electrical components used in
low voltage systems?

A) ISO Certification

B) Underwriter's Laboratory (UL) certification

C) OSHA Certification

,Georgia (GA) Low Voltage-General Exam
D) EPA Certification

Answer: B

Explanation: UL certification ensures electrical components meet safety standards for electrical safety
and performance.



Question 8. What is the significance of complying with the National Electrical Code (NEC) during
installation?

A) It minimizes the need for inspections

B) It ensures electrical safety and code compliance

C) It allows bypassing local regulations

D) It reduces the need for permits

Answer: B

Explanation: NEC provides safety standards for electrical installations, preventing hazards and ensuring
compliance.



Question 9. Which of the following is a key consideration when selecting wiring for low voltage
installations?

A) Color of the wire

B) Gauge of the wire based on load requirements

C) The age of the building

D) The brand of the wire only

Answer: B

Explanation: The wire gauge must match load requirements to ensure safety and proper functioning.



Question 10. Why is it important to interpret blueprints accurately in low voltage installation?

A) To determine the project budget

B) To verify equipment meets specifications and to identify correct installation locations

C) To select the color scheme for wiring

D) To avoid electrical codes

Answer: B

, Georgia (GA) Low Voltage-General Exam
Explanation: Blueprints guide correct equipment placement, wiring, and compliance with standards.



Question 11. When reviewing blueprints, what symbol indicates a fire wall?

A) A dashed line with a flame icon

B) A thick solid line labeled "fire wall"

C) A dotted line with a shield icon

D) A circle with a cross

Answer: B

Explanation: Fire walls are typically represented by thick lines labeled accordingly to denote their
location.



Question 12. How does the location of devices influence low voltage system installation?

A) It does not influence installation

B) It impacts wiring routes, safety considerations, and accessibility

C) It only affects aesthetic appearance

D) Location is only important in large buildings

Answer: B

Explanation: Device placement affects wiring, safety, accessibility, and system performance.



Question 13. What type of circuit uses a single path for current flow?

A) Parallel

B) Series

C) Open

D) Grounded

Answer: B

Explanation: Series circuits have current flowing through a single path, with voltage divided among
components.



Question 14. Which wiring method is best suited for hazardous industrial environments?
€74,79
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
njain Exam Dumps
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
89
Lid sinds
8 maanden
Aantal volgers
5
Documenten
28217
Laatst verkocht
1 week geleden

3,4

31 beoordelingen

5
9
4
5
3
10
2
4
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen