____________ in a project schedule identify critical events and other activities that must be performed by specific dates before the project may proceed. correct answer Milestones ____________, project acceptance criteria, and technical requirements are common components of project scope statements. correct answer Project constraints 1. At the end of a project, the project manager documents the ____________ that provide valuable insights into what went well and what went poorly on similar projects. correct answer 1. lessons learned 2. Examples of documenting ____________ include recording the different points of a project where rework was required and where additional resources were added. correct answer 2. lessons learned A __________ budget distributes costs across the time periods of the project. correct answer calendarized A _________________ is characteristic of a project in need of extreme project management methods. correct answer high level complexity A decrease in the ____________ can lead to a shortened project schedule and/or lower project costs. correct answer project scope

Meer zien Lees minder
Instelling
Project Managememt
Vak
Project Managememt










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Project Managememt
Vak
Project Managememt

Documentinformatie

Geüpload op
2 juli 2025
Aantal pagina's
20
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

C722 - Unit Quiz with Accurate
Answers
____________ in a project schedule identify critical events and other
activities that must be performed by specific dates before the project
may proceed. correct answer Milestones


____________, project acceptance criteria, and technical requirements
are common components of project scope statements. correct answer
Project constraints


1. At the end of a project, the project manager documents the
____________ that provide valuable insights into what went well and
what went poorly on similar projects. correct answer 1. lessons learned


2. Examples of documenting ____________ include recording the
different points of a project where rework was required and where
additional resources were added. correct answer 2. lessons learned


A __________ budget distributes costs across the time periods of the
project. correct answer calendarized


A _________________ is characteristic of a project in need of extreme
project management methods. correct answer high level complexity

,A decrease in the ____________ can lead to a shortened project
schedule and/or lower project costs. correct answer project scope


A decrease in the original ____________ may make it possible to
increase the project scope and/or add materials or resources that make
it possible to speed up the project schedule. correct answer project
costs


A linear path and sequential steps are defining characteristics of
___________ project management methods. correct answer traditional


A timeline that specifies when the project begins and when it is
supposed to end is called a ____________. correct answer project
schedule


A typical example of ____________ in a project is the involvement of
many different people, many different materials, and many different
outcomes. correct answer complexity


According to the ____________, a project manager should avoid
controlling tasks that take less than eight hours and should not let more
than two weeks go by without checking in. correct answer 8 and 80
Rule

, Any variances from the ____________ will be compared with the
baseline requirements and approved changes once a project is
completed. correct answer initial cost, schedule, or deliverables


At which level in the OPM3 is there more refined documentation,
consistent management support, consistent execution, and efficiency
across all projects?
Level 5
Level 2
Level 3
Level 4 correct answer Level 4


Budget are created through the careful and complete documentation of
the assumptions that come from the ___________ phase. correct
answer project planning


During what kind of meeting does each leader speak to the status of
their work and project risks, and explain the status of any mitigation
activities?
Monthly customer meeting
Monthly management project review
Internal management project review
Weekly internal status meeting correct answer Weekly internal status
meeting

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
starwid Yale University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
13
Lid sinds
6 maanden
Aantal volgers
1
Documenten
8138
Laatst verkocht
4 dagen geleden

3,3

4 beoordelingen

5
1
4
0
3
2
2
1
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen