100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

STATIONARY ENGINEER TEST PAPER QUESTIONS AND SOLUTIONS 2025/2026 GRADED A+

Beoordeling
-
Verkocht
-
Pagina's
12
Cijfer
A+
Geüpload op
01-07-2025
Geschreven in
2024/2025

STATIONARY ENGINEER TEST PAPER QUESTIONS AND SOLUTIONS 2025/2026 GRADED A+

Instelling
Stationary Engineer
Vak
Stationary engineer









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Stationary engineer
Vak
Stationary engineer

Documentinformatie

Geüpload op
1 juli 2025
Aantal pagina's
12
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

STATIONARY ENGINEER TEST PAPER QUESTIONS AND
SOLUTIONS 2025/2026 GRADED A+
✔✔When working in a boiler work permits should be acquired? - ✔✔For the work shift

✔✔To inspect a boiler they must be what? - ✔✔Be employed either by the state or by
an insurance company licensed to write boiler and pressure vessel insurance in that
jurisdiction

✔✔A boiler should have 1 spring loaded pop-type safety valve and it must exceed the
output lb's per hour & fuel capacity but not raise above - ✔✔5 psi of the MAWP or 6%.

✔✔ASME CSD 1 requires the main gas burners train to have what? - ✔✔2 manual
safety shutoff valves

✔✔Welds must be approved and witnessed who? - ✔✔Authorized inspector

✔✔Hydrostatic test is done at what pressure? - ✔✔150 times the MAWP or 50% over
MAWP

✔✔During a hydro test if the boiler leaks who do you notify? - ✔✔Authorized boiler
inspector and they will advise you what to do.

✔✔How many low water cut offs are needed per code for hot water boiler systems? -
✔✔When the boiler has an input greater than 400 000 BTU's per hr 1 L.W. cutout is
needed

✔✔What are the minimum and maximum sizes permitted for blowdown valves or
connection? - ✔✔(3/4 min & 2 1/2 max)

✔✔What are the gauges on a hot water boiler? - ✔✔Pressure gauge & temperature
gauge.

✔✔What are the gauges on a steam boiler? - ✔✔Pressure gauge and gauge glass

✔✔A boiler operating at a pressure of 65 lbs; what is the smallest size feed & blow off
connections if the safety valve is set at 90 psi? - ✔✔1/2 feed & 3/4 blow off

✔✔If a boiler has 1" blow down pipe; what diameter should the boiler blow down tank air
vent should be? - ✔✔2.5"

✔✔What are 3 low water cutouts? - ✔✔Float magnet type- it has a plunger on a float
rod an a permanent magnet with a mercury switch; Float-linkage type- a linkage

, connected to a mercury switch; Submerged-electrode type- uses an electrode make the
complete burner circuit

✔✔What does a low water cut out do in a low water condition? - ✔✔Shuts off the fuel
supply when it drops below the visible level

✔✔What is the first indication of low water condition? - ✔✔A red hot crown sheet

✔✔How many low water cutouts are needed for steam & hot water boilers? - ✔✔ONE

✔✔Boiler that exceeds 100 psi must have how many blow downs? - ✔✔TWO

✔✔How many times the safety valve setting should the pressure gauge be? - ✔✔(1 1/2
to 2 times)

✔✔When blowing down the water column you notice the gauge glass slowly returns to
the normal level; this could be indication of what? - ✔✔The bottom of the gauge glass is
clogged and giving a false reading

✔✔How many inches should the lowest visible level in the gauge glass be in a boiler? -
✔✔TWO inches

✔✔What are the minimum gauge glass connection and drain? - ✔✔(1/2 connection and
1/4 drain)

✔✔Blowdown shall not be less than ** or lower than ** of the safety valve? - ✔✔Less
than 2 lbs or lower than 96% of the safety valve.

✔✔Blow down valves fitting should be designed at least ** % greater pressure than the
MAP? - ✔✔25%

✔✔In an old power boiler which type of feed water regulator wouldn't be used? -
✔✔Electronic

✔✔Which low water cut out doesn't have a mercury switch? - ✔✔Electrode probes
(submerged)

✔✔What are 3 types of feedwater regulators? - ✔✔Thermostatic-mechanical regulator;
Thermostatic-fluid type; Float operated style

✔✔What are two types of commonly used feed water pumps? - ✔✔Injectors and
Inspirator

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
markers Havard School
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
12
Lid sinds
8 maanden
Aantal volgers
0
Documenten
5245
Laatst verkocht
1 maand geleden
morales

your go-to shop for all things study-related! Whether you need notebooks, study guides, or stress-relief gear, we've got the tools to help you crush your exams like a boss. Our exclusive collection is designed for the modern student who’s ready to take on the academic world and rise to the challenge.

3,0

1 beoordelingen

5
0
4
0
3
1
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen