ICC CALIFORNIA UST INSPECTOR Exam Questions and Correct Detailed Answers

Instelling
ICC CALIFORNIA UST INSPECTOR
Vak
ICC CALIFORNIA UST INSPECTOR











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
ICC CALIFORNIA UST INSPECTOR
Vak
ICC CALIFORNIA UST INSPECTOR

Documentinformatie

Geüpload op
24 juni 2025
Aantal pagina's
208
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

ICC CALIFORNIA UST INSPECTOR Exam
Questions and Correct Detailed Answers
(Verified Answers) Already Graded A+
Guaranteed Pass Latest Versions 2025


If a UST system is utilizing an overfill alarm, the alarm must be triggered to alert
the transfer operator when the tank is no more than full
a.) 85%
b.) 95%
b.) 90%
c.) 80%
c.) 90%




An automatic tank gauge is utilized for leak detection of the .
a.) Tank
b.) Tank and Piping
c.) Piping
d.) Interstitial space
a.) Tank
CCR Title 23, Sec 2643(b)(1)




After completion of enhanced leak detection (ELD) test, the ELD test results must

,be submitted to the .
a.) The local agency
b.) The SWRCB
c.) Owner of the UST system
d.) To both the SWRCB and the local agency
b.) To both the SWRCB and the local agency
CCR Title 23, Sec 2644.1(a)(5)



A permit to operate a UST system must have all of the following listed on the
permit, EXCEPT:
a.) The state UST identification number(s)
b.) Name of the tank manufacturer and tank capacity
c.) Permit expiration date
d.) Monitoring requirements
b.) Name of the tank manufacturer and tank capacity
CCR Title 23, Sec 2712(c)




A temporary closure is appropriate for which of the following:
a.) The UST system is empty and will be removed from service indefinitely
b.) The UST system has ceased to store hazardous materials but will be used
within the next 12 consecutive months
c.) The UST system is unable to meet compliance requirements and will be
removed
d.) The UST system has been red-tagged

,b.) The UST system has ceased to store hazardous materials but will be used
within the next 12 consecutive months
CCR Title 23, Sec 2671 & 2670
A local agency determines that a UST facility within the last year had compliance
issues. Prior to issuing a new permit or renewal to operate an UST the local agency
shall:
a.) Ask the state to assist in a joint inspection
b.) Request the owner/operator to submit a "Return to Compliance" form.
c.) Refer to a District Attorney Investigator
d.) Inspect the facility and determine compliance
d.) Inspect the facility and determine compliance
CCR Title 23, Sec 2712(c)




All the following components require third party certification, except:
a.) Automatic tank gauging systems
b.) Statistical inventory reconciliation methods
c.) Spill Containment lids
d.) Liquid phase out-of-tank products
c.) Spill Containment lids




The exterior surface of an underground storage tank must bear a marking or label
which shows the following information, except:
a.) Design pressure in psig
b.) Useable capacity in gallons.

, c.) Width of the interstitial space
d.) Identity of manufacturer
c.) Width of the interstitial space
CCR Title 23, Sec 2631(b)




Which of the following is not a confined space:
a.) A really deep turbine sump
b.) A space not designed for continuous employee occupancy
c.) An area with limited access
d.) An area with limited ventilation
d.) An area with limited ventilation
CCR Title 8, Sec 5157(b)




A secondary containment system which is not an integral part of primary
containment shall be designed and constructed according to an engineering
specification approved by a third party. The secondary containment system shall
contain of the volume of the largest primary container within it,
in the case of multiple primary containers:
a.) 100 percent
b.) 10 percent
c.) 110 percent
d.) 150 percent
d.) 150 percent

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
KGeorge Western Governors University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
128
Lid sinds
2 jaar
Aantal volgers
25
Documenten
4113
Laatst verkocht
2 dagen geleden

3,6

27 beoordelingen

5
13
4
1
3
7
2
2
1
4

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen