100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

PMD PRO LEVEL 1 EXAM 2025 QUESTIONS AND ANSWERS

Beoordeling
-
Verkocht
-
Pagina's
10
Cijfer
A+
Geüpload op
16-06-2025
Geschreven in
2024/2025

Compared with projects managed by organizations working in the commercial sector, what characteristic is unique to managing projects in the international development sector organizations? - ANS Projects aspire to social and behavioral changes that improve target population well-being What is the correct sequence for different phases in the PMD Pro Project Phase Model? - ANS Project identification and design Project set up Project planning Project implementation Which phase is continually present throughout the entirety of the PMD Pro Project Phase Model? - ANS Project Monitoring, Evaluation, and Control How many phases are there in the PMD Pro Project Phase Model for the international development sector? - ANS 6 Which best describes the relationship between Project Management and Design, Monitoring, and Evaluation (DM&E)? - ANS While strong DM&E is a necessary component of a project management system, it is not sufficient to ensure project success PMD PRO LEVEL 1 EXAM 2025 QUESTIONS AND ANSWERS COPYRIGHT © 2025 THESTAR ALL RIGHTS RESERVED 2 What area tends to be a relative weakness of a projet manager's in the international development sector? - ANS Establishing a balanced approach to project management through all phases of the life of a project What term defines the amount of time that a task in a project network diagram can be delayed by without causing a delay to the project? - ANS Float What are responsibilities of a project manager? - ANS Ensuring the success of the project Working with an array of stakeholders to complete the work of the projects Resolving internal conflicts among the project team The _______ competency area includes the knowledge, skills, and behaviors required to identify, select, and employ the right tools and processes to ensure project management success. - ANS Technical What is an example of a "technical" competency required of project managers? - ANS The ability to define and collect information and data (metrics) to monitor project process What are the three most important factors that determine the skill level a project manager requires to effectively manage a project? - ANS Size Complexity Risk of Project Which analysis tool is sometimes replaced by assets-based approach? - ANS Problem analysis The discipline of _______ management focuses on selecting, initiating, and managing the overall collection of

Meer zien Lees minder
Instelling
PMD PRO
Vak
PMD PRO









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
PMD PRO
Vak
PMD PRO

Documentinformatie

Geüpload op
16 juni 2025
Aantal pagina's
10
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

PMD PRO LEVEL 1 EXAM 2025
QUESTIONS AND ANSWERS



Compared with projects managed by organizations working in the commercial sector, what
characteristic is unique to managing projects in the international development sector
organizations? - ANS Projects aspire to social and behavioral changes that improve target
population well-being


What is the correct sequence for different phases in the PMD Pro Project Phase Model? -
ANS Project identification and design
Project set up
Project planning
Project implementation


Which phase is continually present throughout the entirety of the PMD Pro Project Phase
Model? - ANS Project Monitoring, Evaluation, and Control


How many phases are there in the PMD Pro Project Phase Model for the international
development sector? - ANS 6


Which best describes the relationship between Project Management and Design, Monitoring,
and Evaluation (DM&E)? - ANS While strong DM&E is a necessary component of a project
management system, it is not sufficient to ensure project success




COPYRIGHT © 2025 THESTAR ALL RIGHTS RESERVED 1

, What area tends to be a relative weakness of a projet manager's in the international
development sector? - ANS Establishing a balanced approach to project management
through all phases of the life of a project


What term defines the amount of time that a task in a project network diagram can be delayed
by without causing a delay to the project? - ANS Float



What are responsibilities of a project manager? - ANS Ensuring the success of the project
Working with an array of stakeholders to complete the work of the projects
Resolving internal conflicts among the project team


The _______ competency area includes the knowledge, skills, and behaviors required to
identify, select, and employ the right tools and processes to ensure project management
success. - ANS Technical



What is an example of a "technical" competency required of project managers? - ANS The
ability to define and collect information and data (metrics) to monitor project process


What are the three most important factors that determine the skill level a project manager
requires to effectively manage a project? - ANS Size
Complexity
Risk of Project



Which analysis tool is sometimes replaced by assets-based approach? - ANS Problem analysis


The discipline of _______ management focuses on selecting, initiating, and managing the
overall collection of projects in a way that addresses the strategic objectives of the
organization. - ANS Portfolio




COPYRIGHT © 2025 THESTAR ALL RIGHTS RESERVED 2

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TheStar Florida State University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
588
Lid sinds
1 jaar
Aantal volgers
178
Documenten
23565
Laatst verkocht
7 uur geleden
Stuvia Prodigy

Tested, Verified and Updated Study Materials with 100% Guaranteed Success.

3,8

117 beoordelingen

5
56
4
21
3
20
2
3
1
17

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen