ICC GR Test Question Review UPDATED ACTUAL Exam Questions and CORRECT Answers What does the special inspection agreement state? - CORRECT ANSWER registered design professional hired an approved special inspection agency A preconstruction meeting is - CORRECT ANSWER - The owner or - Initiated by the general contractor What risk category would an elementary school. OST likely belong to? - CORRECT

Meer zien Lees minder
Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
15 juni 2025
Aantal pagina's
10
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

ICC GR Test Question Review UPDATED
ACTUAL Exam Questions and CORRECT
Answers

What does the special inspection agreement state? - CORRECT ANSWER - The owner or
registered design professional hired an approved special inspection agency


A preconstruction meeting is - CORRECT ANSWER - Initiated by the general contractor


What risk category would an elementary school. OST likely belong to? - CORRECT
ANSWER - III



Who produces the statement of responsibility? - CORRECT ANSWER - contractor



Who approves the special inspection agency? - CORRECT ANSWER - Building official


A typical commercial building would likely fall under which risk category? - CORRECT
ANSWER - II


What is one of the duties of a special inspector prior to arriving at the job site? - CORRECT
ANSWER - Discuss reporting frequency with the building official



Who notifies the special inspector of upcoming inspection tasks? - CORRECT ANSWER -
The contractor


What is something you would find in a statement of responsibility? - CORRECT
ANSWER - Method and frequency of reporting as well as distribution of the reports

, It is up to the ___ to conduct a preconstruction meeting, while it can fall on the ___ to require
one. - CORRECT ANSWER - RDP, Building Official


When considering a special inspection form for a project, the owner should evaluate: -
CORRECT ANSWER - The firms experience with similar size and scope projects,
whether the form has enough qualified inspectors in the projects prominent disciplines, how
close the firms office is to the job site


The ___ is ultimately responsible for the special inspection program - CORRECT
ANSWER - RDP


The ___ is responsible for excepting or approving alternate materials or design methods
proposed for use in construction that deviate from that specifically stated in the construction
documents - CORRECT ANSWER - Building Official


The ___ is tasked with monitoring and even auditing the special inspection activities on the job
site - CORRECT ANSWER - Building Official



Special inspectors are expected to be an expert in - CORRECT ANSWER - Reinforced
concrete, structural masonry, and or soils


An example of material and construction requiring special inspection would be - CORRECT
ANSWER - The grout of masonry walls, nailing type parters and locations in a wood
diaphragm, and the application of fire stopping material


Special inspectors become approved in a jurisdiction by - CORRECT ANSWER -
Following the requirements of the jurisdiction over the project


The statement of special inspections can't address - CORRECT ANSWER - What QC
manual is in place for a non approved fabricator
€11,08
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
MGRADES Stanford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1105
Lid sinds
1 jaar
Aantal volgers
103
Documenten
68972
Laatst verkocht
3 uur geleden
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3,8

177 beoordelingen

5
75
4
31
3
47
2
9
1
15

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen