OSHA 30 ACTUAL UPDATED Exam Questions and CORRECT Answers During steel assembly, shear connectors will be installed _______ metal decking is in place: - CORRECT ANSWER - after During steel assembly, the total weight of a bundle of decking should not exceed 4,000 lbs. T/F - CORRECT ANSWER - true During steel assembly, shear Connectors should not be attached to the top flanges of beams or joists. T/F - CORRECT ANSWER - true During steel assembly, the employer shall ensure that the weight of a bundle of joist bridging shall not exceed a total of: - CORRECT ANSWER - 1,000 l

Meer zien Lees minder
Instelling
OSHA 30 Construction
Vak
OSHA 30 Construction










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
OSHA 30 Construction
Vak
OSHA 30 Construction

Documentinformatie

Geüpload op
9 juni 2025
Aantal pagina's
27
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

OSHA 30 ACTUAL UPDATED Exam
Questions and CORRECT Answers
During steel assembly, shear connectors will be installed _______ metal decking is in place: -
CORRECT ANSWER - after


During steel assembly, the total weight of a bundle of decking should not exceed 4,000 lbs. T/F -
CORRECT ANSWER - true


During steel assembly, shear Connectors should not be attached to the top flanges of beams or
joists. T/F - CORRECT ANSWER - true


During steel assembly, the employer shall ensure that the weight of a bundle of joist bridging
shall not exceed a total of: - CORRECT ANSWER - 1,000 lbs


When placing solid web members for beams/columns, diagonal bracing may be secured with at
least one bolt per connection, wrench-tight. T/F - CORRECT ANSWER - true


Subpart R contains numerous references to Tables A and B. These tables refer to erection
bridging requirements associated with short and long span joists, and can be found in: -
CORRECT ANSWER - Within the standard Subpart R


When placing solid web members for beams/columns, the load shall not be released until the
members are secured with at least two bolts per connection. T/F - CORRECT ANSWER -
true


Columns must be equipped with vertical stabilizer plates - CORRECT ANSWER - all of
the above


Connectors working at heights over 15 and up to 30 feet must tie off with: - CORRECT
ANSWER - at least one of the above

,Deckers in a Controlled Decking Zone must be protected at heights greater than: - CORRECT
ANSWER - 2 stories


Safety nets must be installed no more than 30 feet below the walking/working surface whenever:
- CORRECT ANSWER - all of the above



Which of the following is true of a CDZ: - CORRECT ANSWER - all of the above



Training must be each of the following EXCEPT: - CORRECT ANSWER - sporadic



Training must include: - CORRECT ANSWER - all of the above


Training must include procedures for erecting, maintaining, disassembling, and inspecting fall
protection systems. T/F - CORRECT ANSWER - true


Work from water towers and tanks is exempt from the Steel Erection Standard. T/F - CORRECT
ANSWER - true



Perimeter safety cables of 1/2 inch wire rope must be installed: - CORRECT ANSWER -
both a & b


When there is no overhead protection, the _______ must ensure that personnel are not working
below steel erection: - CORRECT ANSWER - controlling contractor


The weight of a bundle of joist bridging shall not exceed a total of 1,000 pounds. T/F -
CORRECT ANSWER - true



A pre-work shift visual of cranes must be performed by: - CORRECT ANSWER -a
competent person

, During steel assembly, the bundle of decking is placed on a minimum of ______ joists: -
CORRECT ANSWER -3


Connectors working at heights over 15 and up to 30 feet must tie off with: - CORRECT
ANSWER - at least one of the above


OSHA requires that all equipment left unattended at night, adjacent to a highway in normal use,
must have: - CORRECT ANSWER - A or B


Bulldozer and scraper blades, end-loader buckets, dump bodies, and similar equipment, must be
fully lowered and never blocked when being repaired or when not in use. T/F - CORRECT
ANSWER - false


Must be provided on spur railroad tracks where a rolling car could contact other cars being
worked, enter a building, work or traffic area. - CORRECT ANSWER - Derail and/or
bumper blocks


Any overhead wire must be considered to be an energized line UNLESS and UNTIL person
owning line or electrical utility indicate that it is not an energized line and it has been visibly
grounded. T/F - CORRECT ANSWER - true


OSHA specifies that for overhead power-lines rated 50kV or below, minimum clearance
between the lines and any part of the crane or load must be: - CORRECT ANSWER - 10
feet


Flammable liquids have "flash points" below: - CORRECT ANSWER - 100 degrees
Fahrenheit


All haulage vehicles, whose pay load is loaded by means of cranes, power shovels, loaders, or
similar equipment, must have _______ to adequately protect the operator from shifting or falling
materials. - CORRECT ANSWER - a cab shield and/or canopy
€11,40
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
MGRADES Stanford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1078
Lid sinds
1 jaar
Aantal volgers
102
Documenten
68972
Laatst verkocht
1 dag geleden
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3,8

171 beoordelingen

5
73
4
30
3
46
2
8
1
14

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen