AMAZON YO EXAM QUESTIONS AND
ANSWERS
Full with ARN - Answer-Number of loads tendered to the carrier that have already
generated an ARN in the transloader system
Full without ARN - Answer-Number of loads tendered to the carrier that have NOT
already generated an ARN in the transloader system, after acceptance of the load by
the carrier it takes about 2 hours for the transloader to receive the ARN, (Full without
ARN) = ((Total on Site) - ((Full with ARN + Loading + Yard usable Empty)))
Loading - Answer-Number of trailers that are in Loading status/WIP
WIP - Answer-Work in Progress
Yard Usable Empty - Answer-Number of empty trailers on site that are available to be
loaded and NOT damaged
Damaged - Answer-Number of trailers that have been rejected and that could not be
loaded
Cases - Answer-Trailer pool case number
Freight Forwarder - Answer-Our freight forwarder is CDS, handles freight bookings from
the vendor, consolidates products overseas, and works with Ocean & Air carriers to
coordinate shipping execution
Transloader - Answer-3rd party warehouse that picks up containers from the port and
loads product onto trailers (Amazon's preferred carriers) that are destined for our FC's
CDS - Answer-Century Distribution Systems. CDS' web-based tool and used for
booking and tracking freight
OTR - Answer-Over the Road traditional 53' trailers
IMDL - Answer-Intermodal (via railroad on chassis/imdl containers)
Trailer Pool - Answer-Current equipment facility has onsite (this includes equipment that
is loading/loaded/empty)
SLA - Answer-Expectation that loaded equipment is pulled from trans-loader facility
within 24 hours of tender date
ANSWERS
Full with ARN - Answer-Number of loads tendered to the carrier that have already
generated an ARN in the transloader system
Full without ARN - Answer-Number of loads tendered to the carrier that have NOT
already generated an ARN in the transloader system, after acceptance of the load by
the carrier it takes about 2 hours for the transloader to receive the ARN, (Full without
ARN) = ((Total on Site) - ((Full with ARN + Loading + Yard usable Empty)))
Loading - Answer-Number of trailers that are in Loading status/WIP
WIP - Answer-Work in Progress
Yard Usable Empty - Answer-Number of empty trailers on site that are available to be
loaded and NOT damaged
Damaged - Answer-Number of trailers that have been rejected and that could not be
loaded
Cases - Answer-Trailer pool case number
Freight Forwarder - Answer-Our freight forwarder is CDS, handles freight bookings from
the vendor, consolidates products overseas, and works with Ocean & Air carriers to
coordinate shipping execution
Transloader - Answer-3rd party warehouse that picks up containers from the port and
loads product onto trailers (Amazon's preferred carriers) that are destined for our FC's
CDS - Answer-Century Distribution Systems. CDS' web-based tool and used for
booking and tracking freight
OTR - Answer-Over the Road traditional 53' trailers
IMDL - Answer-Intermodal (via railroad on chassis/imdl containers)
Trailer Pool - Answer-Current equipment facility has onsite (this includes equipment that
is loading/loaded/empty)
SLA - Answer-Expectation that loaded equipment is pulled from trans-loader facility
within 24 hours of tender date