100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Overig

WGU D156 Leadership and Management E-Portfolio Template |Latest Update with Complete Solution

Beoordeling
-
Verkocht
-
Pagina's
5
Geüpload op
16-05-2025
Geschreven in
2024/2025

WGU D156 Leadership and Management E-Portfolio Template |Latest Update with Complete Solution

Instelling
Vak









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
16 mei 2025
Aantal pagina's
5
Geschreven in
2024/2025
Type
Overig
Persoon
Onbekend

Onderwerpen

Voorbeeld van de inhoud

1

WGU D156 Leadership and Management E-Portfolio Template
|Latest Update with Complete Solution

Student Name: Robert Kennedy

Course Name: Business Case Analysis for Healthcare Improvement- D156

Instructions:



To fulfill the requirements for this course, you must complete the CPE Record. Refer to your
Assessment Task Overview for specific deliverables. You must include the required deliverables in
this e-portfolio.



Enter your written deliverables (e.g., reflections, etc.) into this template for each phase. Previously
created Word documents may also be inserted into this Word document by using the following
instructions or may be submitted as separate documents for evaluation.



To insert a PDF document or previously created Word Documents, follow these instructions:

1. Click or tap where you want to insert the content of the existing document.
2. Go to Insert and select the arrow next to Object.
3. Select Text from File.
4. Locate the file that you want and then double-click it.
5. To add in the contents of additional Word documents, repeat the above steps as needed.

CPE Schedule

Required CPE Activities Estimated Time Anticipated Completion
(hours and minutes) Date
Organizational problem 1 hour 4/2/25
Stakeholders 1 hour 4/2/25
Project Team 1 hour 30 min 4/2/25
Needs Assessment 2 hours 4/3/25
SWOT Analysis 2 hours 4/4/25
Impact Analysis 2 hours 4/4/25
Justification and Project Purpose 1 hour 30 min 4/5/25
Review of Scholarly Sources 3 hours 4/6/25
Project Environment 1 hour 4/6/25
SMART Goals 1.5 hours 4/6/25
Project Management Life Cycle 2 hours 4/7/25



1

, 2




Table of titles of stakeholders/project team members

Stakeholders/Team Members
Project Manager
Administrative Assistant
Preop nurses
HVIS Lab nurses
Anesthesia
Surgical Physicians
Information Technology
HVIS Leadership
Schedulers
Patients/families


Needs Assessment Template
• Why are first-case surgeries being delayed?

One significant cause of first-case delays is inefficient scheduling of the surgeries.

• Why is the scheduling inefficient?

Some first-case start delays result from patients being transported to the labs by staff
instead of in the preoperative area. Patients must have all preoperative work done quickly
before they come to the lab by surgical team members. This is considered a poor utilization
of resources. Some poor communication results from nurses in the preop and labs area not
being able to let each other know when tasks are completed and when others still need to
be finished by providers.

• Why is scheduling between teams and coordination poor?

In some cases, vendors are needed for specific specialized equipment. In other cases, they
may require anesthesia. There have been times when both groups have not been made
aware of the case, and communication must be made to ensure the case is completed. In
the first case of delays that must be transported directly to the lab and not to the
preoperative area, doctors may not always communicate that to staff beforehand.

• Why are there no standardized processes for communication and scheduling?

One reason for the poor communication is a lack of training from all caregivers involved.
Some physicians report that there is no way to communicate their needs in the current
scheduling system.

• Why is there a lack of a standardized process for scheduling and communication?

The surgical scheduling software has existed for many years and could be outdated. There
could be a lack of process improvement from leadership in the OR areas.

SWOT Analysis Template


2

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
professoraxel Havard School
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2382
Lid sinds
3 jaar
Aantal volgers
1572
Documenten
19396
Laatst verkocht
2 dagen geleden
THE EASIEST WAY TO STUDY NURSING EXAMS,STUDY GUIDES,TESTBANKS AND QUALITY EXAMS

Better grades start here! Find Study Notes, Exam answer packs, Assignment guided solutions and more. Study faster & better. Always leave a review after purchasing any document so as to make sure our customers are 100% satisfied.....All the Best!!!!!!

3,8

458 beoordelingen

5
214
4
80
3
86
2
26
1
52

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen