with well answered questions
When determining the "gross load" the best method is: - ANSWERSGet an accurate
load weight and add the rigging
By order of strength which is correct - ANSWERSBasket, Vertical, Choker
Primary purpose for a roster sheave or auxiliary boom point sheave is to: -
ANSWERSSeparate the hoist line
When the number of layers of rope on a drum increase the : - ANSWERSAllowable line
pull decreases
What is the minimum allowable distance from the crane and power lines under 50kV? -
ANSWERS10'
Eccentric main boom tip reeving casues - ANSWERStwisting of the boom
How many randomly broken wires must there be to remove a running wire rope from
service? - ANSWERS6
When working near power lines when is a signal person required? - ANSWERSWhen
crane moves within a booms length of power lines
When operating truck cranes what is the most unstable allowable quadrant of
operation? - ANSWERSSide
Tipping capacities of locomotive cranes are based on what % of tipping? -
ANSWERS85%
Should the load be applied when determining the proper boom angle? -
ANSWERSYES
What type of rope is recommended for a tagline around powerlines -
ANSWERSPolypropylene
what does two beeps of the horn indicate to people in the area - ANSWERSforward
Load radius is the distance from the center of gravity of the suspended load to the: -
ANSWERSCenter of rotation
What is the purpose of using a boom extension? - ANSWERSIncrease height