100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

WMGT 101-22A EXAM 3 WITH 100- CORRECT ANSWERS

Beoordeling
-
Verkocht
-
Pagina's
14
Cijfer
A+
Geüpload op
04-05-2025
Geschreven in
2024/2025

WMGT 101-22A EXAM 3 WITH 100% CORRECT ANSWERS AFI 10-245, Antiterrorism - CORRECT ANSWERCE shall: have at least 1 engineer at each base must complete Security Eng AT Planning & Design Course, review, document, and track construction projects AT compliance, provide vulnerability assessment protection option program (VAPO) analysis for all critical facilities and off-base leases, and work with the Base Antiterrorism Officer

Meer zien Lees minder
Instelling
WMGT 101-22A
Vak
WMGT 101-22A









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
WMGT 101-22A
Vak
WMGT 101-22A

Documentinformatie

Geüpload op
4 mei 2025
Aantal pagina's
14
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

WMGT 101-22A EXAM 3 WITH 100% CORRECT ANSWERS
AFI 10-245, Antiterrorism - CORRECT ANSWER✅✅✅CE shall: have at least 1 engineer at each base
must complete Security Eng AT Planning & Design Course, review, document, and track construction
projects AT compliance, provide vulnerability assessment protection option program (VAPO) analysis for
all critical facilities and off-base leases, and work with the Base Antiterrorism Officer



Antiterrorism Requirement Planning - CORRECT ANSWER✅✅✅1. UFC 4-020-01

2. Is only the minimum standard required?

3. Yes: construction standoff distance available?

No: UFC 4-020-02 and support manuals

4. If standoff distance is available, apply UFC 4-010-01 and support manuals



Design Basis Threat (DBT) - CORRECT ANSWER✅✅✅Baseline threat used in the design of protective
measures



Initial DBT - CORRECT ANSWER✅✅✅Based on planning team, local intel and Geographic Combatant
Command (COCOM) Theater-Wide threat assessments



Modify Initial DBT - CORRECT ANSWER✅✅✅Local threat assessments



Level of Protection - CORRECT ANSWER✅✅✅The degree to which an asset is protected, defines the
amount of damage a facility or asset can sustain during an attack



LOP: Very low - CORRECT ANSWER✅✅✅Progressive collapse is unlikely, but space in and around
damaged area will be unusable and onset of structural collapse occurs. Glazing is likely to be propelled
into the building and cause serious injuries. Doors may be propelled into rooms, presenting serious
hazards.



LOP: Low - CORRECT ANSWER✅✅✅Building will not be economically repairable and space in and
around damaged area will not be usable, but progressive collapse will not occur. Glazing will fracture
and may come out of the frame, but does not present a significant injury hazard. Doors may fail but
present minimal hazards.

, LOP: Medium - CORRECT ANSWER✅✅✅Minor damage, space in and around damaged area can be
used and will be fully functional after cleanup and repairs. Glazing will fracture but remain in the frame.
Doors may stay in frames but will not be reusable.



LOP: High - CORRECT ANSWER✅✅✅Minimal to no damage with no permanent definitions. Glazing
will not break. Doors will be reusable.



UFC 4-010-01 - CORRECT ANSWER✅✅✅DoD minimum antiterrorism standards for buildings. Intent
is to reduce mass casualties, minimize collateral damage to nearby facilities, and facilitate future
upgrades and increases FPCON.



UFC 4-020-01 - CORRECT ANSWER✅✅✅DoD Security Engineering Facility Planning Manual. Acts as a
starting point for Garrison Antiterrorism and a quantitative risk-based model. Uses scoring model to
evaluate asset value (0-1.0), threat likelihood (0-1.0), and use of minimum AT standards (<0.5). Includes
cost data and helps establish a DBT and required LOP.



AT/FP misconceptions - CORRECT ANSWER✅✅✅1. Bollards, fences, curbs, and barriers are and
adequate substitution for standoff

2. Existing roads must be moved away from existing buildings

3. All building require standoff



Mandatory design standards - CORRECT ANSWER✅✅✅Standard 1: Standoff distance

Standard 6: Progressive collapse

Standard 10: Glazing

Standard 16: Air Intakes



Minimum standoff distance - CORRECT ANSWER✅✅✅Smallest permissible standoff distance for
new and existing construction, regardless of analysis or hardening of the building. Not used for master
planning or programming.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
STANGRADES Stanford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
51
Lid sinds
1 jaar
Aantal volgers
1
Documenten
10172
Laatst verkocht
5 dagen geleden
STAN-GRADES

EXCELLENCY IN ACADEMIC MATERIALS

3,4

11 beoordelingen

5
4
4
1
3
3
2
1
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen