design and implementation/installation - Answer-Telecommunications project management (TPM) typically consists of two distinct processes: Design PM Tasks - Answer-Review expression of interest for client Perform a user needs analysis Perform site surveys and meet with client Generate preliminary design submittals Respond to/incorporate client comments Prepare final bid documents/RFP and engineer's cost estimate Issue final RFP package to client Client makes RFP available to potential bidders Implementation of TPM Project Flowchart - Answer-Review client RFP Perform Site Survey Organize and Submit Bid Questions Organize and Submit Final Proposal Client Awards Contract NTP Contractor Mobilizes Project Implementation Project - Answer-Temporary endevour that has a definite beginning and end, whose end result is the delivery of a product or service. Projects are governed by limits (constraints). Project Constraints - Answer-Time, Cost, Quality, Resources, Risks, Safety, Technology, Stakeholders, Environment Project Stakeholders - Answer-Sponsor Portfolio Manager Client Sellers Business Partner Operations Manager Functional Manager Project Manager Program Manager Project Team Members - Answer-Manufacturer Engineer Government / Regulatory Supplier Vendor Admin/ Clerical Supervisor Other Trades Consultant Coworker Customer ICT Professional's Role is Affected By: - Answer-Current & future technology Availability of resources Complex equipment Advanced tools Constant refinement of standards International, National, Regional and Local Codes Intricate and evolvoing designs Phases of a Project - Answer-Design Bidding Construction Post-Construction PM Tools - Answer-Program Evaluation Review Technique (PERT) Gantt - Schedule of activity, bar chart Critical Path Management Earned Value Management TPM Steps - Answer-Developing a Plan Implementing the Plan Managing/ Tracking the Plan Closeout the Project TPM Knowledge Areas - Answer-Integration Scope Time Cost Quality Human Resources Communications Risks Procurement Stakeholders Human Resource Management - Answer-Personnel issues, engaging the right people to do the job, (trained, equipped, motivated) Project Safety Scope Management - Answer-Development of a scope statement, approved by client and compay Scope statement defines type/ amount/ limits of the work to be performed Scope is the fence around the project Integration Management - Answer-Breaks up multiple small projects to one big project One big project broken down to multiple small projects Integration of subteams into project organization with integrated plan Time Management - Answer-Time estimate and schedules Integration of time schedules from various subteams and calculation of the critical path of events on the project Cost Management - Answer-Cost estimate and project budget Quality Management - Answer-Detailed review of the design documentation throughout the project If ICT completes build, include test results and workmanship Client value Items Communications Management - Answer-Scheduled meetings and the use of electronic media War room - to post schedule and project results on a whiteboard Risk Management - Answer-Injury Professional damage Scheduling conflicts Errors & omissions Cost risks When should the risk management plan be completed? - Answer-Before a company submits a proposal

Meer zien Lees minder
Instelling
BICSI RTPM
Vak
BICSI RTPM











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
BICSI RTPM
Vak
BICSI RTPM

Documentinformatie

Geüpload op
1 mei 2025
Aantal pagina's
50
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

BICSI RTPM 2025


BICSI RTPM Exam Guide Questions with
Answers 2025 Update
design and implementation/installation - Answer-Telecommunications project
management (TPM) typically consists of two distinct processes:



Design PM Tasks - Answer-Review expression of interest for client

Perform a user needs analysis

Perform site surveys and meet with client

Generate preliminary design submittals

Respond to/incorporate client comments

Prepare final bid documents/RFP and engineer's cost estimate

Issue final RFP package to client

Client makes RFP available to potential bidders



Implementation of TPM Project Flowchart - Answer-Review client RFP

Perform Site Survey

Organize and Submit Bid Questions

Organize and Submit Final Proposal

Client Awards Contract NTP

Contractor Mobilizes

Project Implementation

,BICSI RTPM 2025


Project - Answer-Temporary endevour that has a definite beginning and end, whose end
result is the delivery of a product or service. Projects are governed by limits
(constraints).



Project Constraints - Answer-Time, Cost, Quality, Resources, Risks, Safety, Technology,
Stakeholders, Environment



Project Stakeholders - Answer-Sponsor

Portfolio Manager

Client

Sellers

Business Partner

Operations Manager

Functional Manager

Project Manager

Program Manager



Project Team Members - Answer-Manufacturer

Engineer

Government / Regulatory

Supplier

Vendor

Admin/ Clerical

Supervisor

Other Trades

,BICSI RTPM 2025


Consultant

Coworker

Customer



ICT Professional's Role is Affected By: - Answer-Current & future technology

Availability of resources

Complex equipment

Advanced tools

Constant refinement of standards

International, National, Regional and Local Codes

Intricate and evolvoing designs



Phases of a Project - Answer-Design

Bidding

Construction

Post-Construction



PM Tools - Answer-Program Evaluation Review Technique (PERT)

Gantt - Schedule of activity, bar chart

Critical Path Management

Earned Value Management



TPM Steps - Answer-Developing a Plan

Implementing the Plan

, BICSI RTPM 2025


Managing/ Tracking the Plan

Closeout the Project



TPM Knowledge Areas - Answer-Integration

Scope

Time

Cost

Quality

Human Resources

Communications

Risks

Procurement

Stakeholders



Human Resource Management - Answer-Personnel issues, engaging the right people to
do the job, (trained, equipped, motivated)

Project Safety



Scope Management - Answer-Development of a scope statement, approved by client
and compay

Scope statement defines type/ amount/ limits of the work to be performed

Scope is the fence around the project



Integration Management - Answer-Breaks up multiple small projects to one big project

One big project broken down to multiple small projects
€16,61
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
Tommrexy
4,0
(1)

Maak kennis met de verkoper

Seller avatar
Tommrexy Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2
Lid sinds
1 jaar
Aantal volgers
0
Documenten
111
Laatst verkocht
7 maanden geleden

4,0

1 beoordelingen

5
0
4
1
3
0
2
0
1
0

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen