100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

CIPS L6M5 - Strategic Programme Leadership LO1. Exam Questions and Answers 100% Pass

Beoordeling
-
Verkocht
-
Pagina's
23
Cijfer
A+
Geüpload op
30-04-2025
Geschreven in
2024/2025

©JASONMcCONNELL 2025 ALL RIGHTS RESERVED 1 CIPS L6M5 - Strategic Programme Leadership LO1. Exam Questions and Answers 100% Pass Van Weele purchasing development model - Answer1. Transactional orientation, serve the factors - supply relationship is reactive, relationship based on provision of raw materials and components. 2. Commercial orientation, lowest unit price - relationship is based on price negotiation aimed at achieving lowest prices for the organisation. 3. Co-ordinated purchasing - procurement and supply using uniform policies, processes and systems. Often bureaucratic and slow to respond to units. 4. Internal integration cross-functional purchasing - relationship becomes more integrated. Focuses on cross functional problem solving 5. External integration: supply chain-management - Outsourcing strategies developed with supply chain partners. 6. Value chain orientation - Recognises P&S strategy needs to deliver value to the end customer, strong relationships encouraged with suppliers. EPC Contract - AnswerAn EPC Contract is appealing to the client as a turnkey solution and a risk mitigation tool - the EPC contractor assumes all of the responsibilities and risk of completing a programme EPC Contract vs D&B - AnswerClose links between EPC and D&B contracts - the difference is that the EPC contract requires the contractor the design and construct a building to a specification where it is capable of producing a certain level of output. ©JASONMcCONNELL 2025 ALL RIGHTS RESERVED 2 Mechanical completion - AnswerStart up and commissioning of all systems in a building Performance Testing - AnswerDemonstrates that the building is suitable for the requirements of a client Performance Testing - AnswerIs important in terms of the programme as it allow the contractor to avoid LDs or claim bonuses if the programme is completed early provisional acceptance - Answerthe client accepts the performance on the basis that the contractor remains responsible for finding a remedy Commercial operation - AnswerUpon acceptance, the responsibility and ownership transfers to the client and the Commercial operation of the facility may commence EPC contracts - AnswerAre: - Fixed price contracts - Have a fixed completion date - Limited contractor claims as all risk is passed to the contractor - Limits of liability - EPC contractors seek cap EPC contracts - AnswerThe biggest risks that the client bares on an EPC contract is ensuring that the spec is correct, and communicating what is required to teh contractor Management Contractor Warranties - AnswerAlthough clients only deal with one contractor under mgmt. contracting, it may request warranties from the individual works contractors so that direct claims can be made in the event that mgmt. contactor becomes insolvent ©JASONMcCONNELL 2025 ALL RIGHTS RESERVED 3 Statement of need - AnswerAfter a review of the statement of need, it may be decided that a new progrmme is not needed Workflow plan for: Management contracting and construction management - Answer- Business Justification = Statement of need and prepare preliminary BC - Feasibility Study = Allows the client to prepare a business case for the proposed option - Project Brief = the basis for the design - Concept Design = the initial idea for the facility design is proposed - Appointment of Management contractor or construction manager = tender, framework, referral, interview - Production information = the info needed for the works contractor to perform the activities is prepared - tender works contract = works or trade contracts released for tender - Mobilisation = SOS after MC is appointed - Construction = Contractor /CM assumes control of site - Occupation and defects liability period = any defects which become apparent after handover are rectified - Post occupancy evaluation = review of how successful the programme was - Business Justification - AnswerStatement of need and prepare preliminary BC - Feasibility Study - AnswerAllows the client to prepare a business case for the proposed option Project Brief - Answerthe basis for the design Concept Design - AnswerThe initial idea for the facility design is proposed

Meer zien Lees minder
Instelling
CIPS L6M5
Vak
CIPS L6M5










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CIPS L6M5
Vak
CIPS L6M5

Documentinformatie

Geüpload op
30 april 2025
Aantal pagina's
23
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

©JASONMcCONNELL 2025 ALL RIGHTS RESERVED




CIPS L6M5 - Strategic Programme
Leadership LO1. Exam Questions and
Answers 100% Pass




Van Weele purchasing development model - Answer✔1. Transactional orientation, serve the
factors - supply relationship is reactive, relationship based on provision of raw materials and
components.
2. Commercial orientation, lowest unit price - relationship is based on price negotiation aimed
at achieving lowest prices for the organisation.
3. Co-ordinated purchasing - procurement and supply using uniform policies, processes and
systems. Often bureaucratic and slow to respond to units.
4. Internal integration cross-functional purchasing - relationship becomes more integrated.
Focuses on cross functional problem solving
5. External integration: supply chain-management - Outsourcing strategies developed with
supply chain partners.
6. Value chain orientation - Recognises P&S strategy needs to deliver value to the end
customer, strong relationships encouraged with suppliers.



EPC Contract - Answer✔An EPC Contract is appealing to the client as a turnkey solution and a
risk mitigation tool - the EPC contractor assumes all of the responsibilities and risk of
completing a programme



EPC Contract vs D&B - Answer✔Close links between EPC and D&B contracts - the difference is
that the EPC contract requires the contractor the design and construct a building to a
specification where it is capable of producing a certain level of output.



1

, ©JASONMcCONNELL 2025 ALL RIGHTS RESERVED


Mechanical completion - Answer✔Start up and commissioning of all systems in a building



Performance Testing - Answer✔Demonstrates that the building is suitable for the requirements
of a client



Performance Testing - Answer✔Is important in terms of the programme as it allow the
contractor to avoid LDs or claim bonuses if the programme is completed early



provisional acceptance - Answer✔the client accepts the performance on the basis that the
contractor remains responsible for finding a remedy



Commercial operation - Answer✔Upon acceptance, the responsibility and ownership transfers
to the client and the Commercial operation of the facility may commence



EPC contracts - Answer✔Are:


- Fixed price contracts
- Have a fixed completion date
- Limited contractor claims as all risk is passed to the contractor
- Limits of liability - EPC contractors seek cap



EPC contracts - Answer✔The biggest risks that the client bares on an EPC contract is ensuring
that the spec is correct, and communicating what is required to teh contractor



Management Contractor Warranties - Answer✔Although clients only deal with one contractor
under mgmt. contracting, it may request warranties from the individual works contractors so
that direct claims can be made in the event that mgmt. contactor becomes insolvent




2

, ©JASONMcCONNELL 2025 ALL RIGHTS RESERVED


Statement of need - Answer✔After a review of the statement of need, it may be decided that a
new progrmme is not needed



Workflow plan for: Management contracting and construction management - Answer✔-
Business Justification = Statement of need and prepare preliminary BC
- Feasibility Study = Allows the client to prepare a business case for the proposed option
- Project Brief = the basis for the design
- Concept Design = the initial idea for the facility design is proposed
- Appointment of Management contractor or construction manager = tender, framework,
referral, interview
- Production information = the info needed for the works contractor to perform the activities is
prepared
- tender works contract = works or trade contracts released for tender
- Mobilisation = SOS after MC is appointed
- Construction = Contractor /CM assumes control of site
- Occupation and defects liability period = any defects which become apparent after handover
are rectified
- Post occupancy evaluation = review of how successful the programme was



- Business Justification - Answer✔Statement of need and prepare preliminary BC



- Feasibility Study - Answer✔Allows the client to prepare a business case for the proposed
option



Project Brief - Answer✔the basis for the design



Concept Design - Answer✔The initial idea for the facility design is proposed




3

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
StarGuide Liberty University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
15
Lid sinds
11 maanden
Aantal volgers
0
Documenten
2591
Laatst verkocht
6 uur geleden
FIRST CLASS GALORE

Accurate Exam Study Materials.Verified And Updated By Professionals.

4,3

4 beoordelingen

5
1
4
3
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen