A vertical or horizontal piece that holds a pane of glass is called:
Give this one a try later!
Time and money A muntin
, A transit 30 degrees
Don't know?
2 of 456
Term
Ownership of drawings must be:
Give this one a try later!
Complex Futilely
Confirmed Defined
Don't know?
3 of 456
Term
Which are ramp requirements?
Give this one a try later!
, -Foundation inspection
4 residential builders, 2 M + A
-Plumbing, mechanical, gas and
contractors, and 3 members of the
electrical systems inspections
general public
-Floodplain inspection
- handrails must go down at
least one side The percentage of heat from the sun
- there must be a landing at the that gets through the glass
top and bottom of the ramp
Don't know?
4 of 456
Term
In concrete, saw cut control joints should be made within ______ hours of
placement.
Give this one a try later!
2 - 6 hours 4 - 12 hours
1 - 3 hours 12 - 24 hours
Don't know?
5 of 456
, Term
What is the make up of the 9 members of the board?
Give this one a try later!
3 residential builders, 3 m + a 5 residential builders and 4 general
contractors, and 3 public members contractors
4 residential builders, 2 M + A
contractors, and 3 members of 6 residential builders and 3 architects
the general public
Don't know?
6 of 456
Term
Which of the following statements about lead exposure are true?
Give this one a try later!
Term
A vertical or horizontal piece that holds a pane of glass is called:
Give this one a try later!
Time and money A muntin
, A transit 30 degrees
Don't know?
2 of 456
Term
Ownership of drawings must be:
Give this one a try later!
Complex Futilely
Confirmed Defined
Don't know?
3 of 456
Term
Which are ramp requirements?
Give this one a try later!
, -Foundation inspection
4 residential builders, 2 M + A
-Plumbing, mechanical, gas and
contractors, and 3 members of the
electrical systems inspections
general public
-Floodplain inspection
- handrails must go down at
least one side The percentage of heat from the sun
- there must be a landing at the that gets through the glass
top and bottom of the ramp
Don't know?
4 of 456
Term
In concrete, saw cut control joints should be made within ______ hours of
placement.
Give this one a try later!
2 - 6 hours 4 - 12 hours
1 - 3 hours 12 - 24 hours
Don't know?
5 of 456
, Term
What is the make up of the 9 members of the board?
Give this one a try later!
3 residential builders, 3 m + a 5 residential builders and 4 general
contractors, and 3 public members contractors
4 residential builders, 2 M + A
contractors, and 3 members of 6 residential builders and 3 architects
the general public
Don't know?
6 of 456
Term
Which of the following statements about lead exposure are true?
Give this one a try later!