CSI CDT Study info Exam Questions And Answers |Latest 2025 | Guaranteed Pass

Beoordeling
-
Verkocht
-
Pagina's
13
Cijfer
A+
Geüpload op
16-04-2025
Geschreven in
2024/2025

©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+ 1 CSI CDT Study info Exam Questions And Answers |Latest 2025 | Guaranteed Pass Construction Documents consist of - Answerprocurement documents and contract documents elements of construction documents - Answerwritten and graphic documents prepared for communicating the project design for construction and administering the construction contract (Procurement and Contract Documents) A/E - AnswerThe principle, who acts as a Team to provide planning, design, and construction administration services for the project. Letter of intent to Award - AnswerPreconstruction activities begin when the contractor has received Payment and Performance Bond - AnswerA part of preconstruction submittals integrated project delivery - AnswerBased on approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all participants to optimize project results, increase value to owner, reduce waste and maximize efficiency through all phases of design, fabrication, and construction ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+ 2 Principles of Integrated Project Delivery - AnswerTakes increased planning effort and expense, change in practice habits including risk management, early agreement on use of technology, and the ability to play multiple roles. Mutual efforts toward risk management and assignment of responsibility, as well as emphasis on collaborative action, seeks to minimize the isolation of risk and associated damage claims. Construction Budget - Answerthe biggest portion of the project budget. It includes the cost of bonds, insurance, products and systems, and labor both to construct the facility and to verify and administer the construction process Change Directive - Answerdirects the contractor to make a change to the project before the owner and contractor have agreed upon the proposed changes in contract sum or time competitive bidding - Answercreates an environment where bidders at every level, contractor, subcontractor, and supplier, must carefully and seriously consider every aspect of their bid in the attempt to be awarded the work by providing a lower price than any of the other bidders. Addenda - Answerwritten or graphic instruments issued to clarify, revise, add to, or delete information in the procurement documents or in previous addenda. Typically addenda are issued before the opening of bids. Bid - Answeran offer to perform a contract for work and labor or supply materials or goods at a specific price. CMa - AnswerConstruction Management as Adviser CMc - AnswerConstruction Manager as Contractor ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+ 3 Commissioning - AnswerIdentifies process and requirements for facility, system, and component operation testing and checkout. Construction - Answerthe execution of the work as required by the contract documents Construction Manager - AnswerAn entity that typically contracts with the owner to provide construction management services Design-Bid-Build - AnswerA delivery method that is the traditional method for moving a project from conception to completion. It is a linear sequence of activities generally occurring in the following order: project conception, design (including schematic and design development) construction documents, competitive bidding, and then construction. Design-Build - Answerthe owner contracts with a single entity for the complete design and construction of a project. under a single contract with the owner. Express Warranty - AnswerAny affirmation of fact or promise made by the seller to the buyer that relates to the goods or installation Facility Life Cycle - Answerfrom concept through construction to use and eventual deconstruction (demolition), follows a number of stages: Project conception, project delivery methods, design, construction documents, bidding/negotiating/purchasing, construction, and facility management. The four Cs of communication - AnswerClear, Concise, Correct and Complete General Aggregate Limit - AnswerThe maximum limit of liability payable during any given annual policy period

Meer zien Lees minder
Instelling
CSI CDT
Vak
CSI CDT









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CSI CDT
Vak
CSI CDT

Documentinformatie

Geüpload op
16 april 2025
Aantal pagina's
13
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+




CSI CDT Study info Exam Questions And
Answers |Latest 2025 | Guaranteed Pass




Construction Documents consist of - Answer✔procurement documents and contract
documents



elements of construction documents - Answer✔written and graphic documents prepared for
communicating the project design for construction and administering the construction contract
(Procurement and Contract Documents)



A/E - Answer✔The principle, who acts as a Team to provide planning, design, and construction
administration
services for the project.



Letter of intent to Award - Answer✔Preconstruction activities begin when the contractor has
received



Payment and Performance Bond - Answer✔A part of preconstruction submittals



integrated project delivery - Answer✔Based on approach that integrates people, systems,
business structures and practices into a process that collaboratively harnesses the talents and
insights of all participants to optimize project results, increase value to owner, reduce waste
and maximize efficiency through all phases of design, fabrication, and construction




1

, ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 10:40 AM A+


Principles of Integrated Project Delivery - Answer✔Takes increased planning effort and
expense, change in practice habits including risk management, early agreement on use of
technology, and the ability to play multiple roles. Mutual efforts toward risk management and
assignment of responsibility, as well as emphasis on collaborative action, seeks to minimize the
isolation of risk and associated damage claims.



Construction Budget - Answer✔the biggest portion of the project budget. It includes the cost of
bonds, insurance, products and systems, and labor both to construct the facility and to verify
and administer the construction process



Change Directive - Answer✔directs the contractor to make a change to the project before the
owner and contractor have agreed upon the proposed changes in contract sum or time



competitive bidding - Answer✔creates an environment where bidders at every level,
contractor, subcontractor, and supplier, must carefully and seriously consider every aspect of
their bid in the attempt to be awarded the work by providing a lower price than any of the
other bidders.



Addenda - Answer✔written or graphic instruments issued to clarify, revise, add to, or delete
information in
the procurement documents or in previous addenda. Typically addenda are issued before the
opening of bids.



Bid - Answer✔an offer to perform a contract for work and labor or supply materials or goods at
a specific price.



CMa - Answer✔Construction Management as Adviser



CMc - Answer✔Construction Manager as Contractor




2
€12,37
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Brightstars Havard School
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
194
Lid sinds
1 jaar
Aantal volgers
7
Documenten
12191
Laatst verkocht
4 dagen geleden
VERIFIED EXAMS AND STUDY GUIDES.

Here, you will find Study Notes, Exam answer packs 100% Guarenteed success.

3,3

31 beoordelingen

5
10
4
4
3
8
2
3
1
6

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen