100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

BICSI RTPM | LATEST UPDATED | COMPLETE QUESTIONS AND 100% RATED CORRECT ANSWERS | ALREADY GRADED A+

Beoordeling
-
Verkocht
-
Pagina's
56
Cijfer
A+
Geüpload op
29-03-2025
Geschreven in
2024/2025

BICSI RTPM | LATEST UPDATED | COMPLETE QUESTIONS AND 100% RATED CORRECT ANSWERS | ALREADY GRADED A+

Instelling
BICSI
Vak
BICSI











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
BICSI
Vak
BICSI

Documentinformatie

Geüpload op
29 maart 2025
Aantal pagina's
56
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

BICSI RTPM | 2025-2026 LATEST UPDATED | COMPLETE QUESTIONS AND 100% RATED
CORRECT ANSWERS | ALREADY GRADED A+




When submiting a change order keep the ________ and provide ______ to the customer
Original, Copies




Acceptance Plan Outlines the tasks, tools, staff, and skills necessary to test and document
the successful completion of a project.




Contents of Acceptance Plan • Date and time of test.

• Testing technicians.

• Testing witnesses.

• Equipment used:

- Make and model.

- Serial number.

- Equipment calibration dates.

• Test documentation.

• Date submitted.

• Date approved.




Test Documentation May be required between cabling install team and manufacturer
warranty

,Testing requirements should be discussed with owner or contractor when? before work
begins




Where do you submit Test Equipment Calibration Reports to? Included in test document




Punch List Log Contents • Walk-through punch list.

• Participants.

• Time and date.

• Record of completion.

• Client acceptance.




As Built Drawing Contents Pathways

Cable

Telecommunication Spaces

Work Area Outlets



_______ _______ _______A detailed, time sensitive study of the volume of flow of information
(voice, data, video) over a network system. This document will allow the client to assess
network bandwidth usage. Network Traffic Studies




Warranty and License Documentation • An installation warranty.

,• Vendor/manufacturer performance warranty.

- Extended equipment warranty.

• Licensing agreements.




Operations and Maintenance (O&M) Documentation title of the project and the names and
contact information for the architect or engineer, ICT systems designer, and ICT systems
contractor




A _____________________ outlines the processes required to certify and deliver a complete
and functioning system to the client. commissioning plan




A commissioning plan should document: • Administration:

- Labeling of all components.

- O&M documentation.

• Cleaning.

• Testing, adjusting, and settings.

• Training client personnel.

• Warranty time period and licensing.



The ________ ______ is a detailed connection schematic plan to facilitate connecting active
components to the infrastructure. patching matrix

, Patching Matrix Contents • Horizontal and backbone cable ports.

• Patch cable.

• Equipment cord.

• Wire cross connect.

• Optical fiber jumper.

• Coaxial jumpers.




___________ are used to visually document critical components at completion of installation.
Photographs




Required Photographs • Firestop locations.

• Bonding (grounding).

• Hidden structural items.

• Initial rack completion.

• Life safety elements.

• Installation issues.




The T series drawings include: • T0—Campus or site plans: Exterior pathways and
interbuilding systems.

• T1—Layout of complete building per floor: Serving zone boundaries, backbone

distribution systems, and horizontal pathways.

• T2—Serving zones: Work area outlet locations and cable IDs.
€13,55
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Copilot Harvard University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
21
Lid sinds
1 jaar
Aantal volgers
0
Documenten
4415
Laatst verkocht
2 weken geleden
A+ GRADES

ON THIS PAGE YOU WILL FIND VERIFIED STUDY MATERIALS TO BOOST YOUR CAREERS. (EXAMS, STUDY GUIDES, TEST BANKS, PRACTICE TEST QUESTIONS, TEXT BOOKS & CLASS NOTES FOR ALL COURSES) LETS WORK SMART TO EXCEL, WELCOME!!!

4,9

8 beoordelingen

5
7
4
1
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen