100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

PJM Sample Test Review Questions And Answers |Latest 2025 | Guaranteed Pass

Beoordeling
-
Verkocht
-
Pagina's
17
Cijfer
A+
Geüpload op
26-03-2025
Geschreven in
2024/2025

©FYNDLAY 2025 ALL RIGHTS RESERVED 11:49 AM A+ 1 | P a g e PJM Sample Test Review Questions And Answers |Latest 2025 | Guaranteed Pass Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - Answeroff cost out of merit. Monitoring ___________ may give insights into system constraints. - AnswerMonitoring LMP's PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - AnswerPJM calls on synchronized reserves If not cancelled by PJM, the minimum generation alert expires at the end of the specified ______________. - Answerlight load period When PJM declares a hot weather alert, the generation dispatcher should determine if maintenance can be deferred and notify all generating stations and key personnel. - Answer During system restoration, the two categories of reserves are dynamic and spinning. - Answer During system restoration, frequency should be maintained between 59.75 and 61.00 Hertz. - Answer PJM issues a heavy load voltage schedule. Member companies who own generation facilities should ensure voltage regulators on generating units are in service & automatic. - Answer ©FYNDLAY 2025 ALL RIGHTS RESERVED 11:49 AM A+ 2 | P a g e A unit being dispatched economically by PJM should set its megawatt output based on the unit's dispatch rate or desired megawatt level. - Answer A fossil steam unit is considered fuel limited when it is not capable of running at its maximum capacity for the next 72 hours - Answer During system restoration prior to synchronization of a unit, the dispatcher should ensure sufficient load is available to stabilize unit operation. - Answer A large unit in an external control area near PJM/PJM West trips. The PJM operator will see ace remain the same, frequency decrease. - Answer LMPs will change when marginal generator output changes - Answer The two control signals sent by the PJM E M S are regulation and dispatch rate (desired MW output). - Answer An all-call is the one-way communication system used to disseminate information to market operation centers. - Answer Real time bus prices may be monitored using data viewer. - Answer Not offering an available PJM capacity resource into the day ahead market is a violation of PJMs two settlement market rules. - Answer A unit that fails to start when scheduled, would be classified as an unplanned outage. - Answer

Meer zien Lees minder
Instelling
PJM
Vak
PJM










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
PJM
Vak
PJM

Documentinformatie

Geüpload op
26 maart 2025
Aantal pagina's
17
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

©FYNDLAY 2025 ALL RIGHTS RESERVED 11:49 AM A+




PJM Sample Test Review Questions And
Answers |Latest 2025 | Guaranteed Pass


Real time transmission constraints or contingencies may be alleviated with generators
operating ______________ - Answer✔off cost out of merit.



Monitoring ___________ may give insights into system constraints. - Answer✔Monitoring
LMP's


PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. -
Answer✔PJM calls on synchronized reserves


If not cancelled by PJM, the minimum generation alert expires at the end of the specified
______________. - Answer✔light load period


When PJM declares a hot weather alert, the generation dispatcher should determine if
maintenance can be deferred and notify all generating stations and key personnel. - Answer✔



During system restoration, the two categories of reserves are dynamic and spinning. - Answer✔


During system restoration, frequency should be maintained between 59.75 and 61.00 Hertz. -
Answer✔


PJM issues a heavy load voltage schedule. Member companies who own generation facilities
should ensure voltage regulators on generating units are in service & automatic. - Answer✔

1|Page

, ©FYNDLAY 2025 ALL RIGHTS RESERVED 11:49 AM A+




A unit being dispatched economically by PJM should set its megawatt output based on the
unit's dispatch rate or desired megawatt level. - Answer✔


A fossil steam unit is considered fuel limited when it is not capable of running at its maximum
capacity for the next 72 hours - Answer✔


During system restoration prior to synchronization of a unit, the dispatcher should ensure
sufficient load is available to stabilize unit operation. - Answer✔


A large unit in an external control area near PJM/PJM West trips. The PJM operator will see ace
remain the same, frequency decrease. - Answer✔



LMPs will change when marginal generator output changes - Answer✔


The two control signals sent by the PJM E M S are regulation and dispatch rate (desired MW
output). - Answer✔


An all-call is the one-way communication system used to disseminate information to market
operation centers. - Answer✔



Real time bus prices may be monitored using data viewer. - Answer✔


Not offering an available PJM capacity resource into the day ahead market is a violation of PJMs
two settlement market rules. - Answer✔


A unit that fails to start when scheduled, would be classified as an unplanned outage. -
Answer✔



2|Page

, ©FYNDLAY 2025 ALL RIGHTS RESERVED 11:49 AM A+


Maximum Generation Emergency is declared by PJM when generation is required above the
highest incremental economic cost. - Answer✔


Maintenance outages are permitted when a unit can be held online until the following Monday,
and system reliability is not affected - Answer✔



If PJM ace shows over-generation, actual imports are less than scheduled. - Answer✔


PJM will request a Supplementary Status Report when a Maximum Generation Emergency Alert
is issued. - Answer✔


If a fossil steam unit has less than 32 hours of fuel at maximum capacity, it should be bid at
maximum emergency. - Answer✔


The loss of a large generation unit on the PJM system can be detected by monitoring frequency
and PJM ace. - Answer✔


A 1000 megawatt unit has tripped in the PJM control area and the PJM ace now indicates
under-generation of 1050 Megawatt. PJM should request 100% synchronized reserves be
loaded. - Answer✔


Alerts are issued in advance of a scheduled load period to allow sufficient time for the
generation dispatcher to prepare for the anticipated capacity shortages - Answer✔


The amount of synchronized reserves must be large enough to cover the loss of the largest
single energy contingency. - Answer✔


When preparing a supplementary status report (SSR), a steam unit that has 30 hours of fuel
remaining. This unit should be reported as a resource limited unit. - Answer✔



3|Page

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Fyndlay Kaplan University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
355
Lid sinds
1 jaar
Aantal volgers
80
Documenten
18669
Laatst verkocht
3 uur geleden
Scholar\'s Sanctuary.

Explore a Vast Collection of Finely Made Learning Materials.

3,7

68 beoordelingen

5
32
4
8
3
13
2
6
1
9

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen