- a Capstone document that addresses current and future threats to a defined U.S. warfighting capability - a system-specific threat assessment for programs subject to Defense Acquisition Board review Ans What form can DIA-validated threat assessments for Major Defense Acquisition Programs take? - Acquisition of Services Planning (requirements development, acquisition planning, solicitation and contract award, risk management, contract tracking and oversight, performance evaluation) - Review and Approval - Peer Reviews - Data Collection - Clinger-Cohen Act Compliance Ans While the acquisition of services does not follow the five phases of the material systems life cycle, what requirements must be considered and appropriately addressed in regard to services acquisition? - Decision Analysis - Technical Planning - Technical Assessment - Requirements Management - Risk Management - Configuration Management

Meer zien Lees minder
Instelling
CDFM-A
Vak
CDFM-A











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CDFM-A
Vak
CDFM-A

Documentinformatie

Geüpload op
21 maart 2025
Aantal pagina's
56
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Devrim's CDFM Module 4 Flashset questions with
verified answers
- a Capstone document that addresses current and future threats to a defined
U.S. warfighting capability
- a system-specific threat assessment for programs subject to Defense Acquisition
Board review Ans✓✓✓ What form can DIA-validated threat assessments for
Major Defense Acquisition Programs take?


- Acquisition of Services Planning (requirements development, acquisition
planning, solicitation and contract award, risk management, contract tracking and
oversight, performance evaluation)
- Review and Approval
- Peer Reviews
- Data Collection
- Clinger-Cohen Act Compliance Ans✓✓✓ While the acquisition of services does
not follow the five phases of the material systems life cycle, what requirements
must be considered and appropriately addressed in regard to services
acquisition?


- Decision Analysis
- Technical Planning
- Technical Assessment
- Requirements Management
- Risk Management
- Configuration Management
- Data Management

,- Interface Management Ans✓✓✓ What makes up Technical Management
Processes?


- Defense Acquisition Board
- Information Technology Acquisition Board
- Joint Requirements Oversight Council
- DOD Component boards (specific to each service or DOD Component Ans✓✓✓
What are the principal Executive Level Boards and Councils that review
acquisition programs throughout the acquisition life cycle?


- Developmental Test and Evaluation (DT&E)
- Operational Test and Evaluation (OT&E)
- Live Fire Test and Evaluation (LFT&E) Ans✓✓✓ What are the three types of tests
& evaluations performed by the DOD?


- disclosure of both classified military and unclassified technical data
- control of foreign visitors
- export control Ans✓✓✓ RDT&E conducted within the DOD, as well as by DOD
contractors, is covered by what?


- Foreign participation in system development is possible
- An allied system will be used
- The system to be developed is a candidate for foreign sales or direct commercial
sales
- The system will be used in multinational operations

,- The program will involve cooperative R&D with allied or friendly foreign
countries Ans✓✓✓ A Technology Assessment/Control Plan (TA/CP) and a
Delegation Disclosure Authority Letter (DDL) should be prepared as annexes to
the PPP when a determination is made that what following conditions exist?


- relates the scope of the work to its associated budgets and schedule
- measures the work progress in objective terms
- states the value of the work completed in dollars, or other measurable units
Ans✓✓✓ Earned Value Management is a tool that does what?


- Requirements Development
- Logical Analysis
- Design Solution
- Implementation
- Integration
- Verification
- Validation
- Transition Ans✓✓✓ What makes up Technical Processes?


- System and program description
- All program and support points of contact
- a prioritized list of program CPI
- Multidiscipline Counterintelligence (MDCI) threat assessment to CPI
- Vulnerabilities of CPI
- All Research and Technology Protection (RTP) countermeasures and Militarily
Critical Technology List (MCTL) citations for applicable DS&TI or CPI

, - All RTP associated costs, by Fiscal Year, to include PPP development and
execution
- CI Support Plan (CISP)
- Current Security Classification Guide (SCG)
- Foreign disclosure, direct commercial sales, co-production, import, export
license or other export authorization requirements, and/or Technology
Assessment/Control Plan (TA/CP)
- Delegation of Disclosure Authority Letter, if appropriate Ans✓✓✓ What do
Program Protection Plans (PPPs) normally include?


- the program manager determines the existence of CPI
- If a program contains CPI, program protection planning is required. Program
manager is responsible for developing and implementing a Program Protection
Plan (PPP)
- The PPP will be developed, as required, beginning in the Technology
Development Phase, and will be available to the Milestone Decision Authority at
Milestone B and all subsequent milestones
- the program proceeds through the milestones and phases of the acquisition
process after the protection planning foundation is laid. The program follows an
event-based schedule that implements the protection strategy and completes the
actions outlined in the PPP. Ans✓✓✓ What are the key steps with regard to the
Acquisition Protection Stategy?


"tools" to provide learning experiences such as computer based interactive
courseware, simulators, and actual equipment (including embedded training
capabilities on actual equipment), job performance aids, and Interactive
Electronic Technical Manuals. Ans✓✓✓ The "training/instructional system"
includes what?
€16,41
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
cracker Chamberlain School Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2022
Lid sinds
3 jaar
Aantal volgers
1344
Documenten
47128
Laatst verkocht
5 dagen geleden
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3,8

369 beoordelingen

5
162
4
84
3
52
2
22
1
49

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen