100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

ARE 5.0 Project Management QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT ANSWERS) /ALREADY GRADED A+

Beoordeling
-
Verkocht
-
Pagina's
9
Cijfer
A+
Geüpload op
13-03-2025
Geschreven in
2024/2025

ARE 5.0 Project Management QUESTIONS WITH DETAILED VERIFIED ANSWERS (100% CORRECT ANSWERS) /ALREADY GRADED A+

Instelling
Project Management
Vak
Project Management









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Project Management
Vak
Project Management

Documentinformatie

Geüpload op
13 maart 2025
Aantal pagina's
9
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

ARE 5.0 Project Management

Accessory Occupancy - ANS-A space or room this is ancillary to a primary occupancy but
that doesn't exceed 10% of the ground area of the tale in which it's miles positioned.
Achieving Quality thru Checking - ANS-Achieving quality by ensuring a finished product is
correct before it is added to the cease user.
Achieving Quality through Process - ANS-Achieving exceptional by using making sure duties
are completed successfully the primary time in order that there is no need to redo them later.
Add Alternate - ANS-An exchange that provides to the base bid.
Addendum - ANS-A written or photo file issued by way of the architect in the course of the
bid length prior to the execution of the contract, that modifies or interprets the bidding files
with the aid of addition, deletion, clarification, or correction.
Additional Services - ANS-Other services now not aside of primary offerings which can
include programming, building statistics modeling, LEED certification, and put up occupancy
evaluation.
Advertisement for Bids - ANS-Published in one or greater newspapers, change journals or
on-line publications while any contractor is authorized to put up a bid.
Affirmative Covenant - ANS-Commits a customer of a chunk of assets to acting a particular
duty inside the future.
Agency Review - ANS-Includes the standard building code check via the authority having
jurisdiction (AHJ) in addition to any other critiques through allowing companies.
Allowance - ANS-The architect's anticipated cost of a selected cloth or piece of system when
the real value can't be exactly decided at the time of the bid or negotiated concept.
Alternate - ANS-A request blanketed inside the bidding files asking the contractor to supply a
rate for a few form of version from the bottom bid.
Arbitration - ANS-A formal, legally binding procedure for resolving disputes with out litigation
Architects Supplemental Instructions (ASI) - ANS-A approach for the architect to cope with
minor modifications to the quantity that AIA Document A201 authorizes, and might consist of
each written instructions and drawings.
Bar Chart - ANS-Method normally used for scheduling layout and creation tasks. Tasks are
listed in chronological order on vertical get right of entry to and time period is indexed on
horizontal axis. (Aka Gantt Chart)
Base Bid with "authorised same" language - ANS-Similar to Base Bid with Alternates except
alternates require the architect's approval.
Base Bid with Alternates - ANS-Calls for a selected product however allows substitutions of
other substances.
Basic Services - ANS-Include the five conventional levels of a design-bid-construct mission:
schematic layout, layout improvement, production documents, bidding, and construction
administration.
Bid safety - ANS-Required to ensure that the successful bidder will input right into a
agreement with the proprietor.
Bottom-Up Approach - ANS-An method for estimating prices where the PM starts through
breaking the venture down into man or woman obligations and estimating how plenty time
could be wished to complete each one.

, Brooks Act - ANS-Requires federal agencies to award projects to structure and engineering
firms primarily based on qualifications-based totally choice tactics.
Building Cost - ANS-The cash needed to construct the building, inclusive of structure,
exterior cladding, finishes, and electric and mechanical systems, in addition to the
contractor's overhead and profit.
Bulk Plane Restriction - ANS-A zoning method that establishes an imaginary willing plane
starting at the lot line or the center of the street at a given elevation and slopes at a
prescribed attitude in the direction of and over the lot. The building cannot extend beyond
this plane.
Business Entry Rule - ANS-An exception to rumour wherein a assignment file must were
made in the course of the everyday route of enterprise, it must were made at or rapidly after
the act, occasion, or transaction being recorded, and it ought to be the regular course of
business for one of these document to be made.
Business Improvement Disticts - ANS-Used to fund public space enhancements to enhance
an areas attraction and, circuitously, it is belongings values.
Buyout - ANS-The method of selecting providers and finalizing fees from any final
subcontractors and providers that aren't a part of the IPD process.
Change Order - ANS-An order written through the architect and signed by means of the
owner, contractor, and architect
Checklist - ANS-A list of things that need to be taken into consideration or done so as to
finish a particular task.
Chimney - ANS-A more often than not vertical shape containing one or greater flues to carry
gaseous merchandise of combustion and air from a gasoline-burning appliance to the
outside.
Claim - ANS-An declaration, made with the aid of one of the events to the agreement, that
he or she is owed charge or some different form of relief from beneath the settlement's
phrases.
Clinger-Cohen Act - ANS-Allows the usage of layout-build contracting on federally funded
tasks.
Common Path of Egress Travel - ANS-The portion of the exit access tour distance measured
from the most far flung factor inside a story to the factor in which the occupants have
separate get right of entry to to two exits or exit get entry to doors and can make a
preference about which path to move.
Communication - ANS-The most critical thing of assignment management that includes 4
primary kinds referred to as paintings assignments, instructions, praise and punishment and
social interaction.
Competitive Bidding - ANS-Must be performed within clearly defined recommendations that
shield the proprietor from disreputable contractors and unethical bidding practices.
Conditional Covenant - ANS-States that if the restrictions prescribed in the deed are not
observed, the name to the land will revert to the unique grantor or his/her heirs.
Conditional Use Permit - ANS-Allows a nonconforming use or different use inside the zoning
ordinance if the belongings proprietor meets positive situations.
Conditional Use Permit - ANS-Provides permission from a zoning board to use a assets for a
unique reason.
Consequential damages - ANS-Damages that aren't brought on at once and at once by the
alternative celebration's moves, however from the effects of these actions. (Aka Indirect
Damages)
€11,84
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Qualitydocs Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
408
Lid sinds
2 jaar
Aantal volgers
178
Documenten
3479
Laatst verkocht
1 week geleden

Welcome to Qualitydocs ! The place to find the best study materials for various subjects. You can be assured that you will receive only the best which will help you to ace your exams. All the materials posted are A+ Graded. Please rate and write a review after using my materials. Your reviews will motivate me to add more materials. Thank you very much!

3,9

115 beoordelingen

5
67
4
15
3
10
2
5
1
18

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen