A facility quality assessment uses what type of report in proving a comprehensive building
and ground assessment that identifies condition and space function deficiencies along with
the cost of corrective actions
A. Facility Condition Evaluation
B. Facility Function Evaluation
A work or repair order is a document used
To initiate requests for repair or maintenance services
Which type of information is normally asked for when a request for qualifications is issued to
a potential architectural and engineering firm
A.Previous projects completed
B.Financial and insurance certificates
C. Background and location of the firm
In what phase of the design process are the basic function requirement listed, including
square footage, utility and equipment needs, and descriptions of the finished products
Programming
In what phase of the design process are the drawings first developed including floor plan,
elevations and building sections
Schematic Design
Who should develop the formal safety and security plan that will be in effect during a clubs
construction project
The contactor and club staff
, Which construction concept works as a consultant to the club, provides inspections at each
phase, is an extra level of expense to the club, and provides staff training on equipment and
systems as the project is turned over
Commissioning
A Clubs largest Energy expense is normally
Electricity
A successful sustainability program involves
A. The major vendors of the club
B. The club staff
C. The clubs board
Which is true about a preventative maintenance program
Reduces the need for repair
A complete benchmark includes
A. A frequency schedule
B. A performance schedule
C. A productivity standard
In the united states, electrical codes are established by the _______ government
State
A club has 100 tables in their dining room and acceptable rule of thumb suggests that _____
table cloths should be in the club's linen inventory
300
Which of the following types of building plans show air and water flow and equipment
system interconnections?
Mechanical
solved & updated (latest update).
A facility quality assessment uses what type of report in proving a comprehensive building
and ground assessment that identifies condition and space function deficiencies along with
the cost of corrective actions
A. Facility Condition Evaluation
B. Facility Function Evaluation
A work or repair order is a document used
To initiate requests for repair or maintenance services
Which type of information is normally asked for when a request for qualifications is issued to
a potential architectural and engineering firm
A.Previous projects completed
B.Financial and insurance certificates
C. Background and location of the firm
In what phase of the design process are the basic function requirement listed, including
square footage, utility and equipment needs, and descriptions of the finished products
Programming
In what phase of the design process are the drawings first developed including floor plan,
elevations and building sections
Schematic Design
Who should develop the formal safety and security plan that will be in effect during a clubs
construction project
The contactor and club staff
, Which construction concept works as a consultant to the club, provides inspections at each
phase, is an extra level of expense to the club, and provides staff training on equipment and
systems as the project is turned over
Commissioning
A Clubs largest Energy expense is normally
Electricity
A successful sustainability program involves
A. The major vendors of the club
B. The club staff
C. The clubs board
Which is true about a preventative maintenance program
Reduces the need for repair
A complete benchmark includes
A. A frequency schedule
B. A performance schedule
C. A productivity standard
In the united states, electrical codes are established by the _______ government
State
A club has 100 tables in their dining room and acceptable rule of thumb suggests that _____
table cloths should be in the club's linen inventory
300
Which of the following types of building plans show air and water flow and equipment
system interconnections?
Mechanical