, According to CCR, Title 23 UST Regulations, What is the frequency that the Monitor
Certification must be performed? - ANSWER Every 12 Months
If visual monitoring is utilized as the means of release detection for single walled tank, it
must be conducted on a _______ Basis. - ANSWER Daily
The Purpose of spill and overfill protection equipment is to minimize the potential for a
release during: - ANSWER Fuel Deliveries
A
Which of the following is a potential symptom of toxic petroleum exposure: - ANSWER
Dizziness
VI
Tremors
Eye irritation
All of the above(correct)
TU
Under-Dispenser Containment is required for ______ underground storage tank
systems - ANSWER All IS
All of the following are true for Automatic Tank Gauging (ATG) except for: - ANSWER
ATG system are required to be installed in all UST system
According to CCR Title 23, UST regulations Spill containment (spill bucket) must meet
M
all of the following requirements except: - ANSWER Be installed on vent risers
O
Suction piping may not require leak detection if it has one check valve located where? -
ANSWER Directly below the suction pump
A
Service Technician performing work on Monitoring equipment must be trained and
certified by __________ - ANSWER The manufacture of the equipment.
N
Air monitoring must be conducted ________ when performing work within a confined
JP
space. - ANSWER Prior to and during
A UST Service Technician must be recertified by the equipment Manufacture at the time
interval recommended by the equipment manufacture or at least every ____ months,
whichever is greater. - ANSWER 36 Months
When an automatic tank gauge is utilized for single-walled tank leak detection, it shall
test the tank at least monthly after product delivery or when the tank is filled to within