what can non-uniform test results in highway materials be attributed to? ( sampling variability, material variability, testing variability, production/ placement variability, or all of the above? - ️️all of the above under CQC, what is the FDOT responsible for? (providing VT technicians, approving QC plans, monitoring QC plans, performing resolution, or all of the above) - ️️all of the above What are independent verification test results compared to? - ️️The specification requirements the random number generator for sampling and testing is to be provided by: - ️️The Engineer What does the FDOT quality assurance program require? ( contractor CQC, department verification testing, department resolution testing, independent verification, or all of the above) - ️️all of the above

Meer zien Lees minder
Instelling
FDOT QC Manager
Vak
FDOT QC Manager








Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
FDOT QC Manager
Vak
FDOT QC Manager

Documentinformatie

Geüpload op
22 februari 2025
Aantal pagina's
4
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

FDOT QC Manager
what can non-uniform test results in highway materials be attributed to? ( sampling
variability, material variability, testing variability, production/ placement variability, or all
of the above? - ✔️✔️all of the above

under CQC, what is the FDOT responsible for? (providing VT technicians, approving
QC plans, monitoring QC plans, performing resolution, or all of the above) - ✔️✔️all of
the above

What are independent verification test results compared to? - ✔️✔️The specification
requirements

the random number generator for sampling and testing is to be provided by: - ✔️✔️The
Engineer

What does the FDOT quality assurance program require? ( contractor CQC, department
verification testing, department resolution testing, independent verification, or all of the
above) - ✔️✔️all of the above

what is the Standard Deviation used for? - ✔️✔️Calculate Percent Within Limits

The variance is another mathematical measure of the spread or dispersion of sample
values. True or False? - ✔️✔️True

Based upon the data in Table 1 the RANGE is? - ✔️✔️5.6

prior to approving a consultant for contractor quality control, what must the contractor
submit to the department? - ✔️✔️a certificate from the proposed consultant certifying
that there is no conflict of interest

where can the departments contractor quality control plan checklist be found -
✔️✔️construction project administration manual

which of the following is the contractors responsibility for a project? ( develop the QC
plan, provide a QC manager , monitor the QC plan requirements, maintain an approved
QC plan, or all of the above - ✔️✔️all of the above

a QC managers qualification can be suspended, based upon the guidelines in : A
standard specifications - ✔️✔️construction training qualification manual

When completing the certification of Compliance, exceptions are to be noted. Which of
the following is considered an exception? ( QC samples that did not compare with VT,
€7,26
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
quizletquizizzy

Maak kennis met de verkoper

Seller avatar
quizletquizizzy Cambridge Institute Of Allied Health & Technology
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
8
Lid sinds
1 jaar
Aantal volgers
0
Documenten
517
Laatst verkocht
6 dagen geleden
latest papers

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen