100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Asphalt Paving Level 2 Exam Questions With Correct Answers.

Beoordeling
-
Verkocht
-
Pagina's
10
Cijfer
A+
Geüpload op
14-01-2025
Geschreven in
2024/2025

Asphalt Paving Level 2 Exam Questions With Correct Answers. (T/F:) When the total quantity of hot mix asphalt for the project, as indicated on the plans for Type SP and Type FC mixtures only, is less than 2000 tons, the Engineer will accept the mix on the basis of visual inspection, the Engineer may run acceptance tests to determine the acceptability of the material. - AnswerTrue If the resolution test results compare favorably with the Contractor's QC test results: A. The Lot is accepted at full pay B. The Contractor is required to remove and replace the Lot in question C. The Resolution tests are used for pay for that Lot and the Contractor pays for the testing D. The Contractor's QC results are used for pay for that Lot and the Department pays for the testing E. The Contractor pays for the Resolution testing - Answer(D.) The Contractor's QC results are used for pay for that Lot and the Department pays for testing What materials are approved for use for tack application? A. SS-1 or CSS-1, SS-1H or CSS-1H B. RS-1, RS-2, MC-250, SS-4 C. RS-1h, RS-2, CRS-1h, NTSS-1hm, RA-500 D. All the Above E. None of the Above - Answer(C.) RS-1h, RS-2, CRS-1h, NTSS-1hm, RA-500 The minimum air temperature (in the shade away from artificial heat) for a 1.5 inch layer of asphalt is: A. 40°F B. 45°F C. 50°F ©BRIGHSTARS 2024/2025 ALL RIGHTS RESERVED. 2 | P a g e D. 65°F and rising - Answer(A.) 40°F A quality of Asphalt Mix will be: A. Constructable B. Conform to specifications C. Satisfy the functional requirements D. All the above - Answer(D. All the above) - Constructable, conform to specifications, and satisfy the functional requirements Which condition will result in more time available for compaction? A. SP-19 coarse mix during the day B. FC-9.5 fine mix at night C. FC-9.5 coarse mix during the day D. SP-12.5 fine mix with PG76-22 - Answer(A.) SP-19 coarse mix during the day The fallowing statement is true about trucks used to haul asphalt mix: A. Truck drivers must be certified to haul asphalt mix B. Truck beds need to be clean and smooth C. Hole must be present in both sides of truck bed D. All the above E. Both B & C - Answer(E. Both B & C) - Truck beds need to be clean and smooth and hole must be present in both sides of the truck bed When using a vibratory roller, which is generally correct? A. Keep the roller frequency high and impact spacing between 10-12 impacts per foot B. Run low frequency, high amplitude, and 10-12 impacts per foot C. Vibrate only when the lift of mix is less than 1.25 inches D. Both A and C E. Both B and C - Answer(B.) Run low frequency, high amplitude, and 10-12 impacts per foot If the desired spread rate is 165 lbs/sq yds for SP mix, what is the construction tolerance for the layer thickness? - Answer-+ 8.3 lbs/sq yds On the structural layer prior to the friction course, correct any deficiencies before placing the friction course.

Meer zien Lees minder
Instelling
Asphalt
Vak
Asphalt

Voorbeeld van de inhoud

©BRIGHSTARS 2024/2025 ALL RIGHTS RESERVED.




Asphalt Paving Level 2 Exam Questions
With Correct Answers.


(T/F:) When the total quantity of hot mix asphalt for the project, as indicated on the plans for
Type SP and Type FC mixtures only, is less than 2000 tons, the Engineer will accept the mix on
the basis of visual inspection, the Engineer may run acceptance tests to determine the
acceptability of the material. - Answer✔True
If the resolution test results compare favorably with the Contractor's QC test results:
A. The Lot is accepted at full pay
B. The Contractor is required to remove and replace the Lot in question
C. The Resolution tests are used for pay for that Lot and the Contractor pays for the testing
D. The Contractor's QC results are used for pay for that Lot and the Department pays for the
testing

E. The Contractor pays for the Resolution testing - Answer✔(D.) The Contractor's QC results are
used for pay for that Lot and the Department pays for testing
What materials are approved for use for tack application?
A. SS-1 or CSS-1, SS-1H or CSS-1H
B. RS-1, RS-2, MC-250, SS-4
C. RS-1h, RS-2, CRS-1h, NTSS-1hm, RA-500
D. All the Above

E. None of the Above - Answer✔(C.) RS-1h, RS-2, CRS-1h, NTSS-1hm, RA-500
The minimum air temperature (in the shade away from artificial heat) for a 1.5 inch layer of
asphalt is:
A. 40°F
B. 45°F
C. 50°F

1|Page

, ©BRIGHSTARS 2024/2025 ALL RIGHTS RESERVED.

D. 65°F and rising - Answer✔(A.) 40°F
A quality of Asphalt Mix will be:
A. Constructable
B. Conform to specifications
C. Satisfy the functional requirements

D. All the above - Answer✔(D. All the above) - Constructable, conform to specifications, and
satisfy the functional requirements
Which condition will result in more time available for compaction?
A. SP-19 coarse mix during the day
B. FC-9.5 fine mix at night
C. FC-9.5 coarse mix during the day

D. SP-12.5 fine mix with PG76-22 - Answer✔(A.) SP-19 coarse mix during the day
The fallowing statement is true about trucks used to haul asphalt mix:
A. Truck drivers must be certified to haul asphalt mix
B. Truck beds need to be clean and smooth
C. Hole must be present in both sides of truck bed
D. All the above

E. Both B & C - Answer✔(E. Both B & C) - Truck beds need to be clean and smooth and hole
must be present in both sides of the truck bed
When using a vibratory roller, which is generally correct?
A. Keep the roller frequency high and impact spacing between 10-12 impacts per foot
B. Run low frequency, high amplitude, and 10-12 impacts per foot
C. Vibrate only when the lift of mix is less than 1.25 inches
D. Both A and C

E. Both B and C - Answer✔(B.) Run low frequency, high amplitude, and 10-12 impacts per foot
If the desired spread rate is 165 lbs/sq yds for SP mix, what is the construction tolerance for the
layer thickness? - Answer✔-+ 8.3 lbs/sq yds
On the structural layer prior to the friction course, correct any deficiencies before placing the
friction course.

2|Page

Geschreven voor

Instelling
Asphalt
Vak
Asphalt

Documentinformatie

Geüpload op
14 januari 2025
Aantal pagina's
10
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€9,60
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Brightstars Havard School
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
202
Lid sinds
1 jaar
Aantal volgers
7
Documenten
12554
Laatst verkocht
12 uur geleden
VERIFIED EXAMS AND STUDY GUIDES.

Here, you will find Study Notes, Exam answer packs 100% Guarenteed success.

3,3

31 beoordelingen

5
10
4
4
3
8
2
3
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen