COSC 275: Exam 1 Palmer UPDATED ACTUAL Exam Questions and CORRECT Answers Estimating - CORRECT ANSWER - The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. Take-Off - CORRECT ANSWER - The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the projec

Meer zien Lees minder
Instelling
Cosc
Vak
Cosc









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Cosc
Vak
Cosc

Documentinformatie

Geüpload op
15 december 2024
Aantal pagina's
10
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

COSC 275: Exam 1 Palmer UPDATED
ACTUAL Exam Questions and CORRECT
Answers
Estimating - CORRECT ANSWER - The process of determining the anticipated cost of
materials, labor, and equipment of a proposed project.


Take-Off - CORRECT ANSWER - The process in which detailed lists are compiled, based
on drawings and specifications, of all the material and equipment necessary to construct a
project. The cost estimator uses this list to calculate how much it will cost to build the project.


Quantities - CORRECT ANSWER - Measured amounts of construction items expressed in
their customary units.


Quantification - CORRECT ANSWER - In estimating an activity to translate project scope
information into resource quantities suitable for costing. In the engineering and construction
industry, a takeoff is a specific type of quantification that is a measurement and listing of
quantities of materials from drawings.


Quantity Survey - CORRECT ANSWER - A detailed analysis of material and equipment
required to construct a project.


Area - CORRECT ANSWER - A measurement of a given planar region or of the surface of
a solid


Area Method - CORRECT ANSWER - A construction cost estimating system employing
unit square foot costs multiplied by the adjusted gross floor area of a building.


Length - CORRECT ANSWER - The longest dimension of an object

, Linear Measurement - CORRECT ANSWER - A unit or system of units for measuring
length: 12" = 1', 3' = 1 yard, 1 yard = 0.9144 meters, 1 mile = 5,280 feet.


Dimension - CORRECT ANSWER - A distance between two points, lines, or planes.



Specifications (SPECS) - CORRECT ANSWER - Documents that define the qualitative
requirements for products, materials, and workmanship upon which the contract for construction
is based


Drawings - CORRECT ANSWER - Graphic illustrations depicting the dimensions, design,
and location of a project. Generally including plans, elevations, details, diagrams, schedules, and
sections.


Addendums - CORRECT ANSWER - A document describing an addition, change,
correction, or modification to contract documents. Issued by the design professional during the
bidding period or prior to the award of contract, and is the primary method of informing bidders
of modifications to the work during the bidding process


Amendment - CORRECT ANSWER - A modification of the contract by a subsequent
agreement. This does NOT change the entire existing contract but does alter the terms of the
affected provisions or requirements


Grade - CORRECT ANSWER - The surface level of the ground



Level - CORRECT ANSWER - A term used to describe any horizontal surface that has all
points at the same elevation and thus does not tilt or slope


Site - CORRECT ANSWER - The location of the project geographically, usually defined
by legal boundaries


Elevation - CORRECT ANSWER - A vertical distance relative to a reference point
€9,92
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
MGRADES Stanford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1123
Lid sinds
2 jaar
Aantal volgers
104
Documenten
68962
Laatst verkocht
10 uur geleden
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3,8

178 beoordelingen

5
76
4
31
3
47
2
9
1
15

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen