©FYNDLAY EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 1 | P a g e CGM-C Pre Test Questions And Answers (Guaranteed A+) The purpose of Construction Quality Management is to: - answerAchieve the quality established by properly developed requirements through the combined responsibility, but separate, efforts of contractor and Government personnel Construction Quality Management is the performance of tasks, which ensure that design and construction is performed: - answerAccording to plans and specifications, on time, within a defined budget and a safe work environment. Partnering relationships are based upon: - answerBuilding trust and dedication to common goals It is the responsibility of Quality Assurance Personnel to: - answerPeriodically verify that the contractors system of control is working effectively. An effective contractor quality control (CQC) program will: - answerBe an incentive for work to be done correctly the first time resulting in earlier completion, reduced field overhead costs, and greater profits. The success or failure of all contractors is based upon: - answerThe ability to control costs, finance work, estimate jobs, schedule the work, and maintain effective quality control. Quality Assurance Personnel have the responsibility to: - answerRequire contractors to maintain the quality specified in the plans and specifications. Inspection is: - answerThe process by which ongoing and completed work is examined During the punch-out inspection of a project: - answerQuality Assurance Personnel must assure that the contractor prepares a punch-list and makes corrections. If there is disagreement whether the contractor's work complies with the contract: - answerThe government makes the final determination Characteristics that describe a definable feature of work (DFOW) include: - answerCross- referenced listings to the contractors construction schedule that may have more than one definable feature under a section of the specifications.

Meer zien Lees minder
Instelling
CGM-C
Vak
CGM-C








Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
CGM-C
Vak
CGM-C

Documentinformatie

Geüpload op
28 november 2024
Aantal pagina's
3
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

©FYNDLAY EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.




CGM-C Pre Test Questions And Answers
(Guaranteed A+)

The purpose of Construction Quality Management is to: - answer✔Achieve the quality
established by properly developed requirements through the combined responsibility, but
separate, efforts of contractor and Government personnel
Construction Quality Management is the performance of tasks, which ensure that design and
construction is performed: - answer✔According to plans and specifications, on time, within a
defined budget and a safe work environment.

Partnering relationships are based upon: - answer✔Building trust and dedication to common
goals

It is the responsibility of Quality Assurance Personnel to: - answer✔Periodically verify that the
contractors system of control is working effectively.

An effective contractor quality control (CQC) program will: - answer✔Be an incentive for work
to be done correctly the first time resulting in earlier completion, reduced field overhead costs,
and greater profits.

The success or failure of all contractors is based upon: - answer✔The ability to control costs,
finance work, estimate jobs, schedule the work, and maintain effective quality control.

Quality Assurance Personnel have the responsibility to: - answer✔Require contractors to
maintain the quality specified in the plans and specifications.

Inspection is: - answer✔The process by which ongoing and completed work is examined

During the punch-out inspection of a project: - answer✔Quality Assurance Personnel must
assure that the contractor prepares a punch-list and makes corrections.
If there is disagreement whether the contractor's work complies with the contract: -
answer✔The government makes the final determination

Characteristics that describe a definable feature of work (DFOW) include: - answer✔Cross-
referenced listings to the contractors construction schedule that may have more than one
definable feature under a section of the specifications.

1|Page

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Fyndlay Kaplan University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
348
Lid sinds
1 jaar
Aantal volgers
80
Documenten
18286
Laatst verkocht
2 dagen geleden
Scholar\'s Sanctuary.

Explore a Vast Collection of Finely Made Learning Materials.

3,7

67 beoordelingen

5
31
4
8
3
13
2
6
1
9

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen