Questions and Answers 100% Pass
Real time transmission constraints or contingencies may be alleviated with generators
operating :
A. below 60 hertz
B. on a new price curve
C. on a new cost curve
D. off cost ( out of merit) - ANSWER✔✔-D. off cost ( out of merit )
Monitoring LMP may give insights into :
A. system constraints
B. system voltage
C. system frefuency
D. time error - ANSWER✔✔-A. system constraints
Copyright ©SOPHIABENNETT 2025 ACADEMIC YEARALL RIGHTS RESERVED. Page 1/15
, PJM calls for which of the following to recover the ACE so that tie line schedules are
maintained ?
A. IRC ( instantaneous reserve check )
B. synchronized Reserves
C. supplemential reserves
D. minimun generation calculation - ANSWER✔✔-B. synchronized Reserves
If not cancelled by PJM , the minimum generation alert expires :
A. at the end of the specified light load period
B. when notified by NERC
C. 12 hours after the alert was issued
D. after a 24 hour period - ANSWER✔✔-A. at the end of the specified light load period
When PJM declares a hot weather alert , the generation dispatcher should
1. determine if maintenance can be deferred
2. notift transmission operators