100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

Sophia Project Management Unit 4 Challenges 1 & 2

Beoordeling
-
Verkocht
-
Pagina's
19
Cijfer
A+
Geüpload op
01-11-2024
Geschreven in
2024/2025

Sophia Project Management Unit 4 Challenges 1 & 2 To get a project closed, Selena reviewed the project checklist and realized while it seemed the project was changing a lot, the only real deliverable left was the customized training manual and class. She determined the project was ready to close. Based on the current situation of Selena’s project, select the next two steps below that she will perform in the closing process. • a.) Gain approval, then complete Lessons Learned. • b.) Close out any contracts, then complete Lessons Learned. • c.) Complete required documentation according to governance, then gain approval. • d.) Close out any contracts, then complete required documentation according to governance Anna reviewed the project checklist and realized all contracts and change requests were complete and the plan for the outstanding issues was in place. She determined the project was ready to close since it would benefit the business once implemented. Based on the current situation of Anna's project, select the two steps below that she has completed in the closing process. • a.) Determined the project was ready to close, then closed out all related contracts. • b.) Closed out all related contracts, then completed necessary documentation based on governance. • c.) Determined the project was ready to close, then met with the project sponsor to obtain project approval. • d.) Completed necessary documentation based on governance, then met with the project sponsor to obtain project approval. Anna reviewed the project checklist and realized all contracts and change requests were complete and the plan for the outstanding issues was in place. She determined the project was ready to close since it would benefit the business once implemented. Based on the current situation of Anna's project, select the two steps below that she has completed in the closing process. • a.) Determined the project was ready to close, then closed out all related contracts.

Meer zien Lees minder
Instelling
Sophia Project Management
Vak
Sophia Project Management










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Sophia Project Management
Vak
Sophia Project Management

Documentinformatie

Geüpload op
1 november 2024
Aantal pagina's
19
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

€8,83
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten

Maak kennis met de verkoper
Seller avatar
ubuntu

Maak kennis met de verkoper

Seller avatar
ubuntu Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
5
Lid sinds
2 jaar
Aantal volgers
2
Documenten
294
Laatst verkocht
1 jaar geleden

0,0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen