100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4.2 TrustPilot
logo-home
Tentamen (uitwerkingen)

SAFE AGILE ADVANCED SCRUM MASTER EXAM

Beoordeling
5,0
(1)
Verkocht
-
Pagina's
20
Cijfer
A+
Geüpload op
21-10-2024
Geschreven in
2024/2025

SAFE AGILE ADVANCED SCRUM MASTER EXAM

Instelling
Vak










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Gekoppeld boek

Geschreven voor

Vak

Documentinformatie

Geüpload op
21 oktober 2024
Aantal pagina's
20
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

SAFE AGILE ADVANCED SCRUM MASTER EXAM 2024
NEWEST 150 QUESTIONS WITH DETAILED VERIFIED
ANSWERS (100% CORRECT) /ALREADY GRADED A+
Who or which group is responsible for providing architectural guidance to the Agile
Release Train?
1. Product Management
2. System Team
3. Enterprise Architect
4. System Architect - ANSWER: System Architect

Why is transparency so important in SAFe?
1. Lean works when an organization is transparent yet finds a way to monitor access
to information
2. To enable continuous delivery of value
3. Moderate improvements are achieved with ongoing transparency
4. Transparency creates trust, and trust is required for risk-taking - ANSWER:
Transparency creates trust, and trust is required for risk taking

When are the tests written in a Test-driven Development environment?
1. While creating the Product Requirements document
2. Just before deployment ("Just in Time")
3. While the code is being written
4. Before the code is written - ANSWER: Before the Code is Written

What is an Iteration Retrospective?
1. It is used by Agile teams to reflect on the timebox just completed and to develop
new ideas to improve the process
2. It is used to build the context that allows the Agile Release Trains and suppliers to
create their plans during the Program Increment
3. It requires the Scrum Masters to gather ideas and possible solutions by reviewing
past Program Increments
4. It gathers the stakeholders together to review past case studies from other
companies - ANSWER: It is used by Agile Teams to reflect on the timebox just
completed and to develop new ideas to improve the process

What is something an Agile Team would develop?
1. Firmware
2. Workflow steps
3. Program Increment (PI) Objectives
4. Work breakdown structures - ANSWER: Program Increment (PI) Objectives

How do Agile Teams strive to continuously integrate assets?
1. Integrate vertically sliced user stories
2. Leave as much as possible to the System Team
3. Avoid integrating hardware branches

,4. Seek to physically branch software - ANSWER: Integrate vertically sliced user
stories

For the past week Lee has been late to the Daily Stand-up. What is the Scrum
Master's best course of action?
1. Change the time of the Daily Stand-up until all participants can meet each day
2. Escalate the issue to Lee's functional manager and explain what is happening
3. Update the working agreements to clearly state the importance of the Daily Stand-
up, and why the team is less effective if she misses
4. In a private conversation, work with Lee to identify a solution and explain why her
presence is so necessary for success - ANSWER: In a private conversation, work with
Lee to identify a solution and explain why her presence is so necessary for success

The four levels of the Scaled Agile Framework Definition of Done include which
elements?
1. Iteration Review, System Increment, Solution Demo, Release
2. Team Review, Inspect and Adapt, Solution Demo, System Demo
3. Team Increment, System Increment, Solution Increment, Release
4. Team Retrospective, System Demo, Solution Increment, Review - ANSWER: Team
Increment, System Increment, Solution Increment, Release

What is an important outcome of Inspect and Adapt?

1. Analyze and approve Program Epics
2. Identify improvement items for the next PI
3. Identify all out-of-scope work
4. Agree on what will be committed to in the next PI - ANSWER: Identify
improvement items for the next PI

Why do Lean-Agile leaders try to connect the silos of business, system engineering,
hardware, software, test, and quality assurance?

1. To allow friction between the teams
2. To align around value
3. To optimize vertical communication
4. To enforce organizational boundaries between functions - ANSWER: To align
around value

What is the role of the Scrum Master?

1. To coordinate Portfolio Epics through the Portfolio Kanban system
2. To be a stakeholder who has the primary business and technical responsibility for
fitness for use
3. To act as a servant leader who helps teams self-organize, self-manage, and deliver
using effective Agile practices

, 4. To facilitate Agile Release Train processes and Solution Train execution - ANSWER:
To act as a servant leader who helps teams self-organize, self-manage, and deliver
using effective Agile practices

What is an example of a program event?

1. Daily stand-up
2. Scrum of scrums
3. Innovation and Planning
4. Iteration review - ANSWER: Scrum of scrums

What is typically included in the definition of done for the team increment?
1. Customer documentation is ready
2. Regression testing is done
3. Stories are accepted by the Product Owner
4. Stories are accepted by Product Management - ANSWER: Stories are accepted by
the Product Owner

Iteration planning, Iteration review, and backlog refinement are examples of which
type of event?
1. Program Event
2. Team Event
3. Sync Event
4. PI Event - ANSWER: Team Event

What is an example of a modified Fibonacci sequence?
1. ...1, 1, 3, 5, 5...
2. ...5, 8, 13, 21, 34...
3. ...5, 8, 13, 20, 40...
4. ... 2, 4, 5, 9, 11... - ANSWER: 3. ...5, 8, 13, 20, 40...

Which statement describes one element of the CALMR approach to DevOps?
1. Build cross-functional Agile Release Trains around the flow of value to the
Customer
2. Keep everything under version control
3. Decentralize decision making
4. Establish a work environment of shared responsibility - ANSWER: 4. Establish a
work environment of shared responsibility

What is the goal of the SAFe House of Lean model?
1. Value
2. Innovation
3. Relentless Improvement
4. Flow - ANSWER: 1. Value

The Inspect and Adapt event always starts with which activity?
1. Agreement on the problems to solve
€15,73
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Beoordelingen van geverifieerde kopers

Alle reviews worden weergegeven
10 maanden geleden

5,0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
jrein8742 Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
4
Lid sinds
1 jaar
Aantal volgers
1
Documenten
405
Laatst verkocht
10 maanden geleden

4,7

333 beoordelingen

5
252
4
62
3
15
2
4
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen