100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Nccco signal person test Questions & Answers 100% Correct!!

Beoordeling
-
Verkocht
-
Pagina's
7
Cijfer
A+
Geüpload op
16-10-2024
Geschreven in
2024/2025

continuously - ANSWERduring all crane movements, asme b30.5 states that communication shall be maintained stop crane movements - ANSWERif the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a - ANSWEROSHA's standard method crane hand signals would be located in the following designated person - ANSWERaccording to asme b30.5 prior to qualifying all signal persons they must be tested by? none - ANSWERwhat should be the response of the operator if the signal is not understood posted conspicuously - ANSWERaccording to asme b30.5 where must a hand signal chart be posted lift director, signalman and operator - ANSWERwhen using voice signals according to asme b30.5 who must be present for the pre lift discussion limitations - ANSWERa qualified signal person must have knowledge of the standard hand and voice signals along with a basic understanding of crane operations and tested - ANSWERaccording to osha 1926.1419 before lifting operations begin communication systems shall be standard signals - ANSWERaccording to asme b30.5 special signals cannot conflict with

Meer zien Lees minder
Instelling
Nccco Signal Person
Vak
Nccco signal person









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Nccco signal person
Vak
Nccco signal person

Documentinformatie

Geüpload op
16 oktober 2024
Aantal pagina's
7
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

Nccco signal person test Questions & Answers
100% Correct!!

continuously - ANSWERduring all crane movements, asme b30.5 states that communication shall be
maintained



stop crane movements - ANSWERif the communication is disrupted at any time while the crane is
operation, the operator shall



osha 1926.1400 appendix a - ANSWEROSHA's standard method crane hand signals would be located
in the following



designated person - ANSWERaccording to asme b30.5 prior to qualifying all signal persons they must
be tested by?



none - ANSWERwhat should be the response of the operator if the signal is not understood



posted conspicuously - ANSWERaccording to asme b30.5 where must a hand signal chart be posted



lift director, signalman and operator - ANSWERwhen using voice signals according to asme b30.5 who
must be present for the pre lift discussion



limitations - ANSWERa qualified signal person must have knowledge of the standard hand and voice
signals along with a basic understanding of crane operations and



tested - ANSWERaccording to osha 1926.1419 before lifting operations begin communication systems
shall be

standard signals - ANSWERaccording to asme b30.5 special signals cannot conflict with



back up - ANSWERif the operator sounds three short audible signals while loving the crane he/she
intends to



identify each other - ANSWERprior to commencing a crane lift the operator and signalperson shall

, perspective - ANSWERany direction given to the crane operator by the signal person shall be given
from the operator



function and direction - ANSWERwhat is the first element of voice signals given to a crane operator
prior to the lift



three - ANSWERaccording to osha and asme b30.5 each series of voice signals contain how many
elements



lift director - ANSWERfor lifting operations using voice signals who has the responsibility of
permitting multiple simultaneous crane functions




stop - ANSWERif the operator sounds one short audible signal while moving the crane he/she intends
to



job site location - ANSWERaccording to asme b30.5 ant audible emergency signal must be agreed
upon at each



go ahead - ANSWERif the operator sounds two short audible signals while move crane he/she
intends to



hard wire radio - ANSWERwhen signaling a tower crane which of the following is most reliable



anti two block - ANSWERaccording to osha 1926.1431 when signaling a crane that is lifting a
personnel platform which device listed below must be attached to the crane



hoist free fall - ANSWERaccording to osha 1926.1431 which of these hoist options is prohibited




asme b30.3 - ANSWERaccording to asme which volume listed below must be used to hand signal a
tower crane
€12,18
Krijg toegang tot het volledige document:

100% tevredenheidsgarantie
Direct beschikbaar na je betaling
Lees online óf als PDF
Geen vaste maandelijkse kosten


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
papersbyjol West Virginia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
421
Lid sinds
3 jaar
Aantal volgers
253
Documenten
14027
Laatst verkocht
1 maand geleden

3,8

72 beoordelingen

5
27
4
18
3
17
2
2
1
8

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen